工程
- 与 工程 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Based on the experiment of flocculation setting for hydraulic coal mining screen underflow primary slime and floatation gangue at Daoqing coal preparation plant, the influence of pH on flocculating effect of coal slurry was reviewed.
马正先 1。辽宁工程技术大学资源与环境工程学院,阜新 123000;2。通化矿业道清选煤有限公司,白山 134309佟明煜 1。辽宁工程技术大学资源与环境工程学院,阜新 123000朴正武 2。通化矿业道清选煤有限公司,白山 134309
-
Fixed assets used in construction work during the set-up period of the enterprise may be depreciated in full on completion of work or be equal installments over the period of construction and the depreciation charge shall be included in the cost of construction.
筹建期间用于本企业工程施工的固定资产,可以在工程竣工时一次,也可以在工程施工期间按期计算折旧,并计入有关工程成本。
-
Zhuhai City Fuxing is a comprehensive enterprise, indoor and outdoor decoration works, water and electricity and the installation of fire protection engineering, color steel plate production and installation purification engineering, industrial ventilation dust exhaust gas purification works, the company has professional designers support, installation, repair, maintenance technology staff, improve the construction team.
珠海市福兴公司是一家综合性企业,室内外装饰工程,水电及消防工程安装,彩钢板制作安装净化工程,工业通风除尘废气净化工程,公司配套有专业设计师,安装、维修、保养技术人员,完善的施工队伍。
-
Dahuofang water diversion project is a typical case of this kind of engineering. This project is divided into two parts from Anshan pressure station: the up-gravity-force water diversion with double-pipe, and the down-pressure-flow part, which provides water for seven water supply station of six cities, lots of brunches, and full of ups and downs, covering many kinds of boundary conditions of modern engineering.
大伙房输水工程就是其中一个较为典型的工程实例,该工程以鞍山加压站为分界点将整个系统分为两部分,鞍山上游为重力流输水并且有一段为双管运行,鞍山下游为压力流,一共给6个城市7个净水厂供水,多分支,多起伏,几乎包含了当今输水工程中存在的各类边界情况。
-
Quantities calculated include earthworks, steel works, doors and windows works, concrete works and other parts.
工程量清单计算主要包括土方工程、钢筋工程、门窗工程、砼工程等几个部分。
-
In addition to the activated inner north, south western section of double-track lines, and have been implemented into the German line of gas pipeline and other projects, the oil will be in the "Eleventh Five-Year" period the building of gas pipeline, North Outer Ring Road project, South Route East security risks rectification works, Naxi - Abe gas pipeline project, Wei-Qing line 34 change line project type region, iron and hillsides gathering pipeline, gas pipeline Zhongqing Line renovation project and other projects.
除了激活内在北部,南部的西段复线,并纳入天然气管道等项目的德国行已经实施,石油将在&十一五&期间,建设天然气管道,北外环公路工程,南线地区的安全风险补救工程,纳西族-安倍的天然气管道工程,渭清线34线项目变更类型区,铁山坡和收集管道,中青线输气管道改造工程,其他项目。
-
Currently, the Three Gorges to Changzhou DC transmission project started construction to assure quality, safety construction, avoid the risk of projects, the State Power Company works on insurance issues for tender, the Chinese people finally as chief underwriter insurance companies, and insurance companies and safety insurance company Pacific common undertaking such projects.
目前,三峡至常州的直流输电工程已开工建设,为保证工程的优质、安全建设,规避工程风险,国家电力公司就工程的保险事宜进行招标,中国人民保险公司最后作为首席承保人,与太平洋保险公司和平安保险公。。。。。。
-
At present, 70,000 tons / year of adipic acid project completed the overall progress of the project 98%, adipic acid and related projects have been the end, assistive devices and production equipment also has entered the pre-production stage; and 50,000 tons / year project alcohol ketone the overall progress of the project completed 99%, nitric acid and hydrogen projects overall progress of the project 98 percent completed, with test conditions; In addition, 704 pumping stations - natural gas pipeline project Dushanzi overall progress of the project 98 percent completed.
目前,7万吨/年己二酸项目总体工程进度完成了98%,己二酸及配套项目施工已经收尾,辅助装置和生产装置也已经进入试生产阶段;且5万吨/年醇酮项目总体工程进度完成了99%,硝酸及制氢项目总体工程进度完成了98%,具备试车条件;另外,704泵站-独山子天然气管道项目总体工程进度完成了98%。
-
Engineering construction advance technology, process equipment, new materials and software to be studied and developed by the institute, a advantage and enrollment of architecturing college and university, a engineering consultant service to be offered, a advance results of rock land exploration, a new concept of the urban planning, engineering design, real estate development, a exellent design and project,a new technology process, equipment and management in the construction and erection.
各单位研制、开发的工程建设先进技术、先进工艺、先进设备、新材料以及新软件;建筑院校的优势及培养招生培养对象;工程咨询服务内容、对象与效益;岩土勘察的先进成果、城乡规划、工程设计、房屋开发的新理念、优秀设计成果和优秀工程;施工、安装的新技术、新工艺、新机具及先进的管理方法等。
-
The evaluation process of settling accounts for financial investment projects is usually just the same as those of other projects but the former uses the money from taxers .
财政投资工程结算审核程序与其他工程结算审核程序基本相同,但财政投资工程使用的是纳税人的钱,工程结算审核的过程实质上是财政监督与管理的过程,肩负着维护国家利益的使命和责任。
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。