英语人>网络例句>工程 相关的搜索结果
网络例句

工程

与 工程 相关的网络例句 [注:此内容来源于网络,仅供参考]

Third, the industry water treatment project, the softened water treatment project, leaves the water project, the hyperpure water conservancy project regulation, the high pure water project, the sea water to discuss the engineering facilities, the electronics industry water used, the food industry water used, the hospital drugs manufacture process water, the galvanization process water and so on.

三、工业水处理工程、软化水处理工程、去离水工程、超纯水工程、高纯水工程、海水谈化工程设备、电子工业用水、食品工业用水、医院制药工业用水、电镀工业用水等。

Combining with practical application, they also gave an introduction of modernized computer latticing technology which applied to modern project management measures for discussion.

根据甘肃火电工程公司在张掖电厂2 300MW 机组工程建设中现代化信息管理技术的实际应用,论述了在大型火电站安装工程中推行工程信息化、网络化管理的情况,并结合实际应用阐述了运用现代化计算机网络信息技术进行工程项目管理的应用,并对有关问题做出探讨。

With the support and cooperation of relevant companies, many oversea projects have been completed such as Ethiopia Water Engineering, the design of villas in Vanuatu, Chinese Garden in Vienna, the design of Karachi sewage treatment plant in Pakistan, and the design and construction of Kosu bridge in Napal etc.

在国内外有关公司的协作支持下,先后完成了埃塞俄比亚给水工程、瓦努阿图别墅工程、维也纳&中国园林&工程、巴基斯坦卡拉齐污水处理工程、尼泊尔科-苏桥梁工程等国外项目的设计、施工。

In the recent 30 years of the Guhai water-lifting project ,shortage middle arid zone society and the economic development it has made great contribution to since the outly was shortage for a long time,the project facility cannot obtain the immediate service,aging day by day.

固海扬水工程近30a来,为宁夏中部干旱带的社会及经济发展作出了巨大贡献,但是由于长期以来经费短缺,工程设施得不到及时维修,老化日益加剧,为了对宁夏固海扬水工程设施老化状况作出定量的科学评价,通过长期实践并结合数学理论知识,建立了固海扬水渠道工程老化现状评价的数学模型,为固海扬水工程进一步改造和规划提供科学决策的依据。

The method of combining the root piles and static pressure grouting can be adopted to a residental building reinforcement engineering after the synthesis considering the various factor.

在综合考虑多方面因素后,认为对于某住宅楼房屋开裂加固工程,可采用树根桩及静压注浆相结合形成的复合地基技术进行加固处理,工程应用表明,根据工程实际情况合理运用复合地基进行地基加固处理能取得良好的加固效果,本工程的成功施工,对类似工程具有一定的借鉴作用。

In order to facilitate the feasibility study of large-scale public construction, this research applies the Project Management Body of Knowledge developed by the Project Management Institute, along with the Taipei City Government's experiences, trying to conduct the management model of public construction feasibility study. This research concerns five primary processes including initialing, planning, purchasing, contract-administrating, closing. Moreover, it clearly portrays the essentials in feasibility study and organizes relevant working forms, in order to improve the public project benefit and guarantee that the public construction can be executed successfully.

为免影响国家长期民生经济发展之重要大型公共工程专案於办理可行性研究的关键阶段产生窒碍,本研究引用美国专案管理学会(Project Management Institute,PMI)之专案管理知识体系(Project Management Body of Knowledge,PMBOK)作为蓝本,以台北市政府实务上执行为例,对公共工程的可行性研究拟订起始、规划、采购、履约管理、结束等五大过程群,尝试建构公共工程可行性研究的管理模式,其中就可行性研究内的相关过程加以明确说明,并以主办机关立场概拟相关工作表单,期以提升公共工程效益,确保公共工程顺利推动执行。

If the overall contractor jobbed out to subcontractors, the overall contractor should assume responsibility with subcontractors for the quality of projects under subcontracts.

第五十五条建筑工程实行总承包的,工程质量由工程总承包单位负责,总承包单位将建筑工程分包给其他单位的,应当对分包工程的质量与分包单位承担连带责任。

The engineering cost control is the core of the engineering cost management, and it pierces through in the whole process of the engineering construction.

本文对市政工程设计阶段工程造价控制的特点进行了研究分析,提出了设计阶段进行市政工程造价控制的价值工程方法,并将该方法成功地应用于具体的工程,取得了良好的经济效益和社会效益。

And then with this project, the detailed engineering application technologies of the self-balance cable truss and fish belly shaped like cable truss, which are advanced structures in dot point supported glazing with the character of lightness and transparency, were discussed, including the material, structural design, joint forms and conformation, structure test, glass curtain wall test and constructions, almost all fields of these kinds of cable structures were involved.

摘 要:本文首先对青岛国际会展中心二期工程中的索支承玻璃幕墙方案进行了详细介绍,然后结合该工程,对其中采用的自平衡索桁架结构和鱼腹式索桁架结构,这两种点支式玻璃幕墙结构中较为先进支承结构形式的工程应用展开了具体的讨论,包括材料选用、结构设计、节点设计及构造、结构检测、玻璃幕墙检测和结构施工等,涵盖了这两种结构形式工程应用的各个方面,为今后这类工程结构的设计和施工提供了依据。

Adopt pair of blueprint paper and budgetary estimate to have review a case in which a death sentence has been passed by a lower court, do well visa of spot of invite public bidding of engineering construction team, control and project allocate funds wait for measure to reduce project cost, manage through strict quality, undertake reforming innovating, raise the method such as service quality to improve project quality.

大庆油田设计院通过总承包全长为8.352km的北二一四路公路建设工程,对这一新模式进行实践探索。采取对设计图纸和概算进行复核、搞好工程施工队伍招标、控制现场签证和工程拨款等措施来降低工程成本,通过严格质量治理、进行改革创新、提高服务质量等手段来提高工程质量。

第11/100页 首页 < ... 7 8 9 10 11 12 13 14 15 ... > 尾页
推荐网络例句

In the United States, chronic alcoholism and hepatitis C are the most common ones.

在美国,慢性酒精中毒,肝炎是最常见的。

If you have any questions, you can contact me anytime.

如果有任何问题,你可以随时联系我。

Very pretty, but the airport looks more fascinating The other party wisecracked.

很漂亮,不过停机坪更迷人。那人俏皮地答道。