工作船
- 与 工作船 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
This project also compared and discussed the research results of OBS and onshore-offshore experiments in nearby areas. The conclusion is that the active airgun source is equivalent to an earthquake of about magnitude 0.5, and the airgun signals can be detected at the maximum distance of only about 250 km, which is not enough for the study of deeper lithospheric structure below the crust. Furthermore, the onboard airgun source and MCS streamer are difficult to operate in the shallow water of reef and island areas.
本项目还分析对比了周边地区海底地震仪探测和海陆联合地震探测的研究成果,发现人工气枪震源约相当于0.5级的天然地震,其信号传播距离最远只有250 km左右,很难探测到地壳以下更深部的岩石圈结构特征,此外船载的气枪震源和多道电缆在岛礁区和浅水区很难开展工作。
-
We struck on a shoal in going down the bay, and sprung a leak; we had a blustering time at sea, and were obliged to pump almost continually, at which I took my turn.
我们在出港时触了暗礁,船裂了一条小缝;我们在海上时又逢着了飓风,所以必须继续不断地抽水,我也跟着工作。
-
Additionally, we consulted the exponents to evaluate the result by scientific method.Those exponents could be introduced into the work of container control department, then effect on the controlment of
运用这些指标,可以根据各个船公司自身的侧重点和实际情况,从各个角度落实到箱管工作,对其质量及成本控制进行系统的管理和改进。
-
Three of the four levels of the composite deckhouse were in assembly and workers had begun fabrication of the exterior decks and side shelves of the hangar unit.
复合材料舱面船室的四层上部结构有三层已在组装,工作人员已开始建造外部甲板及飞机库侧架。
-
My husband was a naval officer, in February this year to now they have been on board ship training, he was engaged in confidential work, the password for a class, as if the sea on board radar will work, I am on the radar is not very understanding of the harm it much harm sperm?
我先生是一名海军军官,从今年二月份到现在他们在船上一直有船训,他是搞机要工作,密码一类,由于出海的话船上的雷达会工作,我对雷达的危害不是很了解,它对精子的危害大不大?
-
A senior captain demand of company of British Speed Ferries of 38 years old is thought of, a self-satisfied working circumstance put Facebook, drive for example when the channel of catamaran come-and-go Yinglun that carries 800 people and 200 cars, although the body when his job fastens 800 human life, but enjoy snacks carefree and contently however: Dip in at the same time sauce eats potato piece, one canister life-giving drink is put in nicety on the side of instrument board, still place a few fastfood.
英国Speed Ferries公司一名38岁的资深船长索思,洋洋自得的把工作情况放上Facebook,例如驾驶搭载800人以及200台车的双体船往来英伦海峡时,虽然他工作时身系800条人命,但却悠然自得地享用零食:一边蘸酱吃薯片,把一罐提神饮品放在精密仪器板旁边,还放置一些小吃。
-
On the instrument cabinet, there is power switch, start switch, stop pushbutton, main engine exhaust thermometer, lub oil pressure gauge, lub oil thermometer, cooling water thermometer, main engine revolution indicator, starting battery voltmeter, cooling water high temperature and lub oil low pressure alarm device; beside the gear box, there is working oil pressure gauge, lub oil thermometer, lub oil low pressure alarm , working oil low pressure alarm and lub oil high temperature alarm.
本船主机有机带控制报警仪表箱,仪表箱上设有电源开关、启动开关、停车按钮、主机排气温度表、滑油压力表、滑油温度表、冷却水温表、主机转速表、启动蓄电池电压表、冷却水高温及滑油低压报警装置;齿轮箱机旁配工作油压力表、滑油温度表、滑油低压报警、工作油低压报警及滑油高温报警。
-
For Less Than Container Load shipment, exhibitors have to bear the risk that the Shipping Line/Port operator may not take out your container and sort it out within short period (sometimesmay be more than 4 weeks) which may endanger our on-time pick up/delivery to the Fair. Our set deadline means that transportation should arrive at the designated air/sea port on the designated date respectively.
对于以拼箱方式运输的货物,展商必须承担船公司或港口的操作人员不能在短时间内分检集装箱的风险(此工作可能需要4个星期),这将会影响我司及时在港口提货及运输等工作,我司确定的最后期限是指运输工具在指定的日期抵达指定的港口。
-
For Less Than Container Load shipment, exhibitors have to bear the risk that the Shipping Line/Port operator may not devan your container and sort it out within short period (sometimes may be more than 4 weeks) which may endanger our on-time pick up/delivery to the Fair. Our set deadline means that transportation should arrive at the designated air/sea port before the designated date and the cargoes should been got ready for pick-up for delivery at any time.
对于以拼箱方式运输的货物,展商必须承担船公司或港口的操作人员不能在短时间内分检集装箱的风险(此工作可能需要4个星期),这将会影响我司及时在港口提货及运输等工作,我司确定的最后期限是指运输工具在指定的日期之前抵达指定的港口并随时可以提货。
-
For Less Than Container Load shipment, exhibitors have to bear the risk that the Shipping Line/Port operator may not devan your container and sort it out within short period (sometimes maybe more than 4 weeks) which may endanger our on-time pick up/delivery to the Fair. Our set deadline means that transportation should arrive at the designated air/sea port before the designated date and the cargoes should been got ready for pick-up for delivery at any time.
对于以拼箱方式运输的货物,展商必须承担船公司或港口的操作人员不能在短时间内分检集装箱的风险(此工作可能需要4个星期),这将会影响我司及时在港口提货及运输等工作,我司确定的最后期限是指运输工具在指定的日期之前抵达指定的港口并随时可以提货。
- 推荐网络例句
-
This one mode pays close attention to network credence foundation of the businessman very much.
这一模式非常关注商人的网络信用基础。
-
Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.
扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。
-
There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.
双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。