英语人>网络例句>小梁 相关的搜索结果
网络例句

小梁

与 小梁 相关的网络例句 [注:此内容来源于网络,仅供参考]

In chapter 3, on basis of the first order shear deformation theory, a series of composite laminated beam elements are developed, which are plied transversely, longitudinally and/or assembled both, respectively. A geometric nonlinear element stiffness matrix for the transversely plied laminated beam is presented.

第三章首先介绍了目前已有的在小变形下的横向层合梁、纵向层合梁和组合层合梁理论,并推导了其相应的有限元列式,然后又基于Von-Karman大挠度理论的几何关系,推导了大变形下横向层合梁的单元切线刚度阵。

The results of lattice beam internal force calculated method based on double parameter groundsill model are more approach the experiment measured values because of consideration of the pass of shearing force in soil, and its calculated workloads are similar with the method of winkler elastic foundation. Besides, the thesis also discusses the moment of torque affected results on node stress situation and the correction of stress value at the bottom of cross node of lattice beam. Due to the repeat calculation of node area during internal force calculation, the stress value of the bottom of beam is lower, this may lead the calculated value unsafe, but the corrected stress value will more approach to practical situation.

对格构梁的内力计算提出基于双参数地基模型的格构梁内力计算方法,其计算结果表明,双参数地基模型上的格构梁内力由于考虑土中剪力的传递更加接近于试验实测值,其计算工作量与winkler弹性地基梁法相当,此外,文中还探讨了扭矩作用对格构梁节点受力情况的影响结果以及格构梁交叉节点底部的应力值的修正,由于内力计算过程中节点处的面积被重复计算,使得梁底应力偏小,可能导致计算结果的偏于不安全,修正后的应力值更接近于实际情况。

At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay it in the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brake instrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running

8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内

When dismantle the machine, firstly, stop the suspension coop on the lower 2 sections of the standard sections, the operation staff go on the suspension coop top, the hoisting machine loosen rope, lift the pillar with small shaft, pull out the horizontal pin of pillar, let the pillar fall slowly to thedismantled section's middle angle bar, insert the horizontal pin again. At this time, loosen the connection screw of standard section with spanner, hang the shaft of hand crane on the upper angle bar, sway the shaft of hand crane upward, separate this standard section from the next section, and lay itin the suspension coop, dismantle the other standard section for the same method, and turn the shaft to another direction, draw the lifting wire rope tightly, the operation staff leave the suspension coop, open the lock stopping instrument, fall the suspension coop to next position and lock the brakeinstrument, the operation staff return to the top of suspension coop, continually dismantle note: forbid the staff leave on the top of suspension coop or in the coop when the suspension coop is running

8.1折除时,首先将吊笼用停层装置停靠在待拆除的标准节的下两节上,操作人员上到吊笼顶,卷扬机松绳,用小吊杆将顶梁略向上提起,拔出顶梁横销,使顶梁值得徐徐降下,降到拆除节下一节中间框架角处,并重新穿上横销,这时用板手将标准节连接螺栓松开,将手摇起重机小吊杆钩挂在待拆节上框架用钢土,到吊笼内,用同样的方法拆下另一节标准节,然后将吊杆转向不影响升降机运行的方向,收紧起升钢丝绳,操作人员离开吊笼,打开锁止机构,使吊笼下降到下一个拆除位置,并将锁止机构锁死,人员重返笼顶,进行下一拆除循环(注意:在吊笼运行时绝不允许有人员留在吊笼顶部或吊笼内

The results show that, for the first with no headwall, when there is no crosswind, it has small front face areas, so the aerodynamic resistance is the least. Since the second and the third have headwall, the front face areas are large, so they have bigger aerodynamic resistance. Under the condition of crosswind, as the third design option has the highest side beam, the area of positive pressure at the upwind is bigger, and the area of negative pressure is smaller when the bigger eddy area appears, so the side forces become larger. The first has the least side forces; the overturning moment of the first is the least.

研究结果表明:在无横风情况下,方案一中没有端墙,迎风面积较小,受到的气动阻力最小,方案二和三中平车有端墙,迎风面积较大,受到的气动阻力也较大;有横风情况下,方案三中平车侧梁较高,车体迎风面正压区较大,而背风侧产生较大的涡流区,在此区域内压力较小,故其横向力较大,方案一中平车侧梁没有加高,受到的横向力最小;方案一中平车倾覆力矩最小,稳定性最好。

These 375 patients had a median age of 50.57±10.46(range,19-72) with 87.4%HBsAg positive and 4.3%anti-HCV antibody positive;The apparent peak incidence age was 40~60 years old,and the ratio of male to female was 10.7:1;The 3 and 5 year postoperational survival rate were 52%and 38%;The tumour numbers(p=0.000),tumor size(p=0.025),histological pattern (p=0.000),nuclear features(p=0.000),differentiation(p=0.001) and vascular invasion(p=0.000) were significantly correlated with prognosis.The postoperational survival time of thin trabeculae pattern,compact pattern and pseudoglandular pattern were significantly longer than that of thick trabeculae, scirrhous pattern,and solid patternp<0.009the postoperational survival time of 1 and 2 grade based on nuclear features were significantly longer than that of 3 and 4 grades(p=0.000The small cell variant,osteoclast-like giant cell variant, and spindle cell variant were mainly composed of thick trabeculae pattern and solid pattern,which were significantly different from that of clear cell variant.

结果1。本组资料显示肝细胞癌发病年龄19~72岁,平均50.57±10.46岁,发病高峰年龄40~60岁,男女比例为10.7:1;HBsAg87.4%,anti-HCV抗体4.3%;术后3年生存率为52%,5年生存率为38%;肿瘤数目(p=0.000)、肿瘤大小(p=0.025)、组织学结构类型(p=0.000)、核分级(p=0.000)、分化程度(p=0.001)及血管浸润均(p=0.000)与预后明显相关;其中组织学结构类型中细梁状型生存时间与致密梁状型和腺样型无明显区别(p>0.05)而明显高于粗梁状型、实性型和硬化型(p≤0.009),硬化型生存时间与实性型之间无明显区(p>0.05)而明显低于其余各型p≤0.006核分级1级与2级生存时间无明显区别(p>0.05,核分级3级与4级生存时间无明显区别(p>0.05),而核分级3级生存时间明显低于2p=0.000小细胞型、巨细胞型和梭形细胞型主要由实性型和粗梁状型组织学结构类型构成,明显不同于透明细胞型(主要由细梁状型和粗梁状型构成(p≤1.006)。2。

The properties of blast loading are that it is highly impulsive, exhibiting high-pressures but lasting for a very short duration. The propagation process of shock wave produced in steel-concrete composite beams subjected to blast loading is very short. And there is only small deformation for the beam during the time of the propagation process of wave.

由于爆炸荷载作用时间短、超压峰值大等特点,当爆炸荷载作用于钢-混凝土组合梁上时,将在梁内产生冲击波,冲击波在钢-混凝土组合梁内的传播过程极短,并且在冲击波的传播过程中梁的变形很小,因此,可将冲击波在梁内的传播过程进行独立分析。

The paper describes how the local force of the main web is considered as the force caused by the Contact pressure among the trolley wheel, rail and top flange, and how the contact analysis model for the local force is built by means of both Hertz theory and finite element software ANSYS combined. Also, it analyzes the variation of the local stress under the different conditions and comes to a conclusion, and compares the results derived from the experimental formula with the result from ANSYS.

本论文的主要内容:将Hertz接触理论和有限元软件ANSYS结合起来,把主腹板的局部受力问题视为小车轮与轨道及轨道与上翼缘板之间发生接触行为作用下的受力问题,建立了小车轮压作用处偏轨箱形梁主腹板局部受力的接触分析模型,研究不同情况(小车轮压、箱形梁几何参数和轨道截面惯性矩)下局部应力的变化规律,得出相关结论;最后将经验公式解与ANSYS数值解进行对比分析论证。

Both basement membranes and stromal ECM are present in the TM beams and JCT region.

基底膜和间质细胞外基质均出现于小梁网束和邻管区。

In addition, there was no syndrome of infection, bedsore, or deep venous thrombosis in all cases. Trabecular metal rod implantation combined with TCM is a simple and effective means for treating early AVN.

提示骨小梁金属AVN重建棒植入配合中药是治疗早期股骨头缺血性坏死的有效方法。

第25/35页 首页 < ... 21 22 23 24 25 26 27 28 29 ... > 尾页
推荐网络例句

However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.

然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。

Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.

镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。

A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.

付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。