审核
- 与 审核 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The time from audit date to certificate and report approval is 6 weeks.
如果以上情况满足,从现场审核到完成审核报告及发证需要6 周时间(42天)。
-
Are you directly supplying to any big retailers and whether your factory has been audited by them, if yes, please send copy of audit certificate which will help us in getting you more business by introducing your products to our other big retailers.
贵公司是否为大型零售商供货且经过他们的审核,如果以经过审核,请将审计证书复印件发给我们以便我们为您联系更多的零售商。
-
A follow up audit will be scheduled no later than 60 days from the original audit date.
跟进审核会在上次审核结束的60天内再次进行。
-
An audit notification by the third party auditing firm will be made 30 days prior to the audit date.
备注:审核时,审核不一定在产品制造商生产可口可乐公司的产品时才进行。
-
In this context, it should be noted a Recertification Audit will have to be conducted before the relevant date of the audit cycle is exceeded.
在这方面,必须注意换证审核必须在审核周期到期之前执行。
-
I The expected time and duration for major audit activities; j The date s and places where the audit is to be conducted
主要审核活动的预定时间和起止日期; j 进行审核的日期和地点
-
The factory ensures all processes will be in operation and the management will be available during the date of audit and no access deny.
工厂确保在审核期间所有工序处于运作状态并且管理层在现场及不会发生&拒绝审核&的情况。
-
The audit report should be date d and signed by the lead auditor.
审核报告应由审核组长注明签发日期并署名。
-
Previously, we allow surveillance audit with ± 2 months grace period with reference to the initial certification stage 2 audit date.
以前,我们允许监督审核的时间安排可以根据初次认证第二阶段审核日期有前后两个月的宽限期。
-
According to the importance of quality control of building engineering the duties of supervision engineer in construction preparation stage are discussed.
针对建筑工程质量控制的重要性,对监理工程师在施工准备阶段质量控制的任务进行了探讨,从工程定位及标高基准的控制、设计交底与图纸审核的质量控制、施工组织设计及方案的审查、材料质量的审核等方面进行了论述,以确保施工顺利进行。
- 推荐网络例句
-
However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.
然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。
-
Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.
镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。
-
A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.
付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。