实际时间
- 与 实际时间 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
A testing triangulation experiment for a polygon with 100 inside islets was done with this algorithm, and the result showed that this algorithm is efficient and robust for triangulating complex polygons with large numbers of inside islets. This algorithm has been successfully applied to the three- dimensional ore-body modeling and visualization system, in which it is used to triangulate the sectional polygons with inside islets, e.g., the inside stones or holes in ore-body, and its high efficiency has been proved.
实验表明,该算法在含有大量岛屿的带岛屿多边形三角剖分中具有很高的时间效率和很强的鲁棒性,并成功将其应用到基于剖面的三维矿体建模与可视化系统中,解决了含有夹石或孔洞的矿体剖面多边形三角剖分问题,具有一定的实际应用价值。
-
The data from stress box indicate that the observed values usually are smaller than the theoretical ones, and the relationship between the vertical or lateral stress and the fill soil thickness can be described in a power function curve: a- a hb. The fact that the soil stress is bigger in the portion adjacent to the central part of gully and becomes smaller in the portion close to the side illustrates that the gully has an apparent unburdening effect. From the monitoring results of the settlement deformation during and after constructingperiod, the study conducts statistical system analysis and evaluation on the change of settlement with time.
根据压力盒测试结果表明,测量值往往比实际的理论计算值小,填土的竖向和侧向土压力与填土厚度可以用幂次型曲线表示:σ=ah~b愈向沟谷中心部位,土压力值愈小,愈向沟谷边缘,土压力数值越大,说明沟谷边坡具有明显的卸荷作用;根据施工期和工后期的沉降变形监测数据,对路堤内各测点的竖向沉降随时间的变化规律进行了数理统计系统分析和总结,工后期路面沉降和时间关系可用对数曲线表示:S=aln+b,并根据此沉降规律对高填方加筋土路堤的工后沉降进行了预测。
-
The data from stress box indicate that the observed values usually are smaller than the theoretical ones, and the relationship between the vertical or lateral stress and the fill soil thickness can be described in a power function curve: cr= ahb. The fact that the soil stress is bigger in the portion adjacent to the central part of gully and becomes smaller in the portion close to the side illustrates that the gully has an apparent unburdening effect. From the monitoring results of the settlement deformation during and after constructingperiod, the study conducts statistical system analysis and evaluation on the change of settlement with time.
根据压力盒测试结果表明,测量值往往比实际的理论计算值小,填土的竖向和侧向土压力与填土厚度可以用幂次型曲线表示:σ=αh~b,愈向沟谷中心部位,土压力值愈小,愈向沟谷边缘,土压力数值越大,说明沟谷边坡具有明显的卸荷作用;根据施工期和工后期的沉降变形监测数据,对路堤内各测点的竖向沉降随时间的变化规律进行了数理统计系统分析和总结,工后期路面沉降和时间关系可用对数曲线表示:S=aln+b,并根据此沉降规律对高填方加筋土路堤的工后沉降进行了预测。
-
This time limitation may be waived for people participating in actual combat operations.
这个时间限制,可豁免的人在实际参与战斗行动。
-
Biological matter of fish species in particular parts of the ocean,but rather changes in thatbiomass over time.
他们的方法并不是要评估特定海域鱼种的实际生物量,而是评估在这一段时间内生物量的变化。
-
If the TBCs system is homogeneous, the TGO will take on relatively regular and periodical undulation. Unfortunately, in actual situation, some abnormal thick areas will be presented in TGO, which is in single-layer or multi-layer form. In SEM, it can be seen that such protrusion areas originate from TGO, and penetrate into bond coat layer gradually with the increment of oxidation time, namely, the oxidation localization phenomenon occurs.
如果体系均匀,则TGO层将表现出较规则的周期状起伏,但在实际服役过程中,TGO层经常出现单个的异常厚部位或多层的异常厚部位,在扫描电镜图上呈现出钉子状或瘤状的局部突起物,这种突起物源于氧化层,并随着高温工作时间的延长向粘结层中扩展,即发生了氧化局域化现象。
-
Compared with the actual resultof using gas generator as combustion supply, the doughnut-shaped furnace can reduce the energy consumption, cut down combustion of base tube, reduce the time of temperature increasing and decreasing and reduce pollution to a large extend by using industrial gas and adopting the regenerative combustion system and fuzzy PID technology.
6通过实际使用比较,环形炉采用工业煤气燃烧,使用蓄热式燃烧系统和模糊PID控制技术,比较使用煤气发生炉作为燃烧供应,可以很大程度的降低能耗、减少管坯烧损、降低升降温时间和减少污染。
-
A fifth-order uncertain non-affine nonlinear model is presented. The proposed model can describe the dynamic characteristics of both DC and AC system. The difference of damping factor and inertial time constant between generator units is considered in the model.
综合考虑AC/DC系统交、直流部分的动态特性及其实际电力系统中各发电机组的阻尼系数和惯性时间常数的不同性,提出了一类五阶非仿射非线性的控制模型。
-
The simplified iron-flow diagram with time factor for the life cycle of steel prod- ucts was compared with its detailed version.
阐明了有时间概念的钢铁产品生命周期铁流图与铁流详图之间的异同构思了钢铁产品生命周期的基准铁流图,并把它作为评价各实际铁流图的标准。
-
If your ever-young psyche refuses to accept the fact of physical aging, or if you've resigned yourself to a miserable accumulation of physiological and psychological pain, I suggest trying a particular kind of manipulation: felt age time travel.
如果你永远年轻的心拒绝承认实际的衰老,或者,如果你对生理上和心理上的痛苦的一种不幸的积累进行妥协,那么,我建议你尝试某种&手段&---来做一次&感受年龄&的时间旅行。
- 推荐网络例句
-
According to the clear water experiment, aeration performance of the new equipment is good with high total oxygen transfer coefficient and oxygen utilization ratio.
曝气设备的动力效率在叶轮转速为120rpm~150rpm时取得最大值,此时氧利用率和充氧能力也具有较高值。
-
The environmental stability of that world - including its crushing pressures and icy darkness - means that some of its most famous inhabitants have survived for eons as evolutionary throwbacks, their bodies undergoing little change.
稳定的海底环境─包括能把人压扁的压力和冰冷的黑暗─意谓海底某些最知名的栖居生物已以演化返祖的样态活了万世,形体几无变化。
-
When I was in school, the rabbi explained everythingin the Bible two different ways.
当我上学的时候,老师解释《圣经》用两种不同的方法。