英语人>网络例句>完工验收 相关的搜索结果
网络例句

完工验收

与 完工验收 相关的网络例句 [注:此内容来源于网络,仅供参考]

Donor sends out donation à Wait for schools which have been approved for construction à EEP assigns school to donor on a first-come-first-serve basis à EEP sends out school application and brief description of school condition to donor à Approved school begins construction – on average, six months is needed to finish construction. However, if circumstances are not ideal (e.g., inclement weather, bad road conditions and etc) or if the school is located in a very remote area (workers need to carry building materials up the mountain) then a longer time is necessary à Construction completed à Spring and Fall season, EEP volunteers inspect completed schools and take pictures for completion reports à Upon return to the US, prepare pictures and completion reports for donors (Approximately 2-3 months time)à Send out school completion reports to donors

捐款人寄出捐款后→等待申请审核通过的学校→燃灯基金会依捐款人捐款时间的先后,安排审核通过的学校给捐款人→燃灯基金会寄出申请学校的旧校资料,及学校现况照片给捐款人→受助学校动工至学校竣工一般需要六个月,若遇雨季或路断或比较偏远的山区(所有建材需由人工扛上山)则会更久时间→学校竣工后→春、秋两季燃灯基金会义工亲自前往验收并拍照→义工返美国后,整理完工学校照片及竣工资料给捐款人(大约二~三个月整理时间)→寄给捐款人竣工报告书。

After the completement of building construction, property company will begin to participate in decoration supervision and acceptance check and take over it.

楼盘封顶后物业公司开始参与楼盘的装修监督、完工后物业公司参与楼盘验收并立即接管的管理。

Standard of ornamental design acceptance of work: Ornamental design project is finishing dry hind, just can check and accept; Check and accept ornamental design project, whether does the breed that should check ornamental design, norms, design accord with design requirement; Ornamental design should be installed firm, its quality asks to reach tolerance, should accord with: The level of form ornamental design and perpendicular tolerance, every meters must not be more than 5 millimeter, must not be more than 3 millimeter endlong; The tolerance of position of alone ornamental design, must not be more than 10 millimeter; Ying Guangjie of ornamental design surface, design clarity, juncture rigor, must not interstitial, warp, edge damage drops the blemish such as horn; Back up spends exterior Ying Guangjie, design clarity, without break.

花饰工程验收标准:花饰工程完工并干燥后,方可验收;验收花饰工程,应检查花饰的品种、规格、图案是否符合设计要求;花饰应安装牢固,其质量要求及允许偏差,应符合:条形花饰的水平和垂直允许偏差,每米不得大于5毫米,全长不得大于3毫米;单独花饰位置的允许偏差,不得大于10毫米;花饰表面应光洁,图案清晰,接缝严密,不得有裂缝、翘曲、缺棱掉角等缺陷;裱花表面应光洁,图案清晰、无裂缝。

After the completion of the project, the project of the Department of self-completion of the works on the basis of the Project Management Department reported that construction on the acceptance and final acceptance sign alone.

工程完工后,在项目部对工程完成自检的基础上,报工程管理部对工程进行验收,并会签竣工验收单。

推荐网络例句

Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.

在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。

In fact,I've got him on the satellite mobile right now.

实际上 我们已接通卫星可视电话了

The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.

世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。