完工验收
- 与 完工验收 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Donor sends out donation à Wait for schools which have been approved for construction à EEP assigns school to donor on a first-come-first-serve basis à EEP sends out school application and brief description of school condition to donor à Approved school begins construction – on average, six months is needed to finish construction. However, if circumstances are not ideal (e.g., inclement weather, bad road conditions and etc) or if the school is located in a very remote area (workers need to carry building materials up the mountain) then a longer time is necessary à Construction completed à Spring and Fall season, EEP volunteers inspect completed schools and take pictures for completion reports à Upon return to the US, prepare pictures and completion reports for donors (Approximately 2-3 months time)à Send out school completion reports to donors
捐款人寄出捐款后→等待申请审核通过的学校→燃灯基金会依捐款人捐款时间的先后,安排审核通过的学校给捐款人→燃灯基金会寄出申请学校的旧校资料,及学校现况照片给捐款人→受助学校动工至学校竣工一般需要六个月,若遇雨季或路断或比较偏远的山区(所有建材需由人工扛上山)则会更久时间→学校竣工后→春、秋两季燃灯基金会义工亲自前往验收并拍照→义工返美国后,整理完工学校照片及竣工资料给捐款人(大约二~三个月整理时间)→寄给捐款人竣工报告书。
-
After the completement of building construction, property company will begin to participate in decoration supervision and acceptance check and take over it.
楼盘封顶后物业公司开始参与楼盘的装修监督、完工后物业公司参与楼盘验收并立即接管的管理。
-
Standard of ornamental design acceptance of work: Ornamental design project is finishing dry hind, just can check and accept; Check and accept ornamental design project, whether does the breed that should check ornamental design, norms, design accord with design requirement; Ornamental design should be installed firm, its quality asks to reach tolerance, should accord with: The level of form ornamental design and perpendicular tolerance, every meters must not be more than 5 millimeter, must not be more than 3 millimeter endlong; The tolerance of position of alone ornamental design, must not be more than 10 millimeter; Ying Guangjie of ornamental design surface, design clarity, juncture rigor, must not interstitial, warp, edge damage drops the blemish such as horn; Back up spends exterior Ying Guangjie, design clarity, without break.
花饰工程验收标准:花饰工程完工并干燥后,方可验收;验收花饰工程,应检查花饰的品种、规格、图案是否符合设计要求;花饰应安装牢固,其质量要求及允许偏差,应符合:条形花饰的水平和垂直允许偏差,每米不得大于5毫米,全长不得大于3毫米;单独花饰位置的允许偏差,不得大于10毫米;花饰表面应光洁,图案清晰,接缝严密,不得有裂缝、翘曲、缺棱掉角等缺陷;裱花表面应光洁,图案清晰、无裂缝。
-
After the completion of the project, the project of the Department of self-completion of the works on the basis of the Project Management Department reported that construction on the acceptance and final acceptance sign alone.
工程完工后,在项目部对工程完成自检的基础上,报工程管理部对工程进行验收,并会签竣工验收单。
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。