安装费用
- 与 安装费用 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
And debugged is the quality guarantee valid period. The final quality guarantee valid period will take priority of the earlier one which reaches expiry date first. Part A will take all the cost of repair and transport arising from flow sensor's quality caused by theirs own reasons.
甲方保证出售给乙方的锥形流量传感器经过严格的出厂检验,产品质量可靠;货到交货地验收合格后18个月或安装调试后12个月为质保有效期,两个时间以先到者为准;若因甲方原因导致质量上的问题,甲方负责返修的一切费用。
-
Installed and debugged is the quality guarantee valid period. The final quality guarantee valid period will take priority of the earlier one which reaches expiry date first. Part A will take all the cost of repair and transport arising from flow sensor's quality caused by theirs own reasons.
甲方保证出售给乙方的锥形流量传感器经过严格的出厂检验,产品质量可靠;货到交货地验收合格后18个月或安装调试后12个月为质保有效期,两个时间以先到者为准;若因甲方原因导致质量上的问题,甲方负责返修的一切费用。
-
Davis says an alert system can be installed for $1,500 to $4,500, a fraction of the cost of a workmen's compensation claim.
戴维斯说,警报系统,可以为1,500元至4,500,是一个工人的赔偿费用的一小部分安装。
-
Solar shingles cost$40 to$50 asquare foot installed,versus about$8 for regular shingles,but you may only need them on the south side of the house.
太阳能瓦费用为40至50元一平方尺安装,相当于8个常规的屋顶板,但您可能只在房子的南侧需要。
-
Any and all costs for erecting the production line shall be on the Buyer's account.
与生产线安装有关的一切费用都由买方承担。
-
Sure, our fitters will put it together any way you want with no extra charge.
当然。我们的安装人员会按照您所要求的任何式样把部件组合在一起,而且不加收费用。
-
By this way, it can be seen that the risks of natural disaster and accident can be transferred by construction insurance and that man-caused risks by construction bond. Furthermore, this paper studies the legal problems in the implementation of construction insurance and bond system and the correspondent laws that need to be improved. With reference to construction insurance, it is compulsive to carry out Contractor"s All Risks, Erection All Risks, Employer"s Liability Insurance, Supervisory Engineer/Designer Professional Liability Insurance and Maintenance Insurance. As for construction bond, it is suitable to take the method of surety bond and implement obligatorily Bid Bond, Performance Bond, Employer Payment Bond and Contractor Payment Bond. In addition, this paper analyses the problems in the implementation of construction insurance and bond system in China and presents corresponding solutions. In the end, it provides a method by option price theory to estimate the costs of construction bond.
本文首先借鉴国外工程保险和担保制度,通过工程保险可以有效的转移自然灾害和意外事故风险,通过工程担保转移各种人为风险;其次研究了在我国实行工程保险和担保制度存在的法律问题和需完善的相关法律,提出在工程保险方面,应强制实行建筑工程一切险、安装工程一切险、质量保修保险、设计/监理责任险,在工程担保方面,宜采取保证担保的方式,强制实行投标保证担保、履约保证担保、业主履约保证担保和付款保证担保,分析了在我国实行工程保险和担保制度存在的问题,提出相应对策;最后运用期权价格理论给出了确定工程担保费用的一种方法。
-
WHEREAS such services are invoiced to SG PAM on a prorate basis taking into account mainly the number of installed communication units as well as the actual utilization.
鉴于,上述服务的费用将主要根据安装该项服务的通信单元的数量以及实际使用的数量按比例地向SG PAM收取。
-
The most important thing about Ubuntu is not that it is available free of charge, but that it confers rights of software freedom on the people who install and use it.
最重要的事是 Ubuntu 不是说在费用上是免费的,而是人们可以有自由的权利去安装和使用它。
-
In arid places like Arizona, the government reimburses residents 25 per cent of the costs of water recycling equipment.
在象亚利桑那这样的干旱地区,政府给居民补贴安装水回收利用设备费用的25%。
- 推荐网络例句
-
With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.
随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。
-
But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.
不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。
-
Closes the eye, the deep breathing, all no longer are the dreams as if......
关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。