安装器
- 与 安装器 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Qingdao pipeline expert specialized hot line; 13012952726 provide the pipelining service; After installment service replacement hot and cold pipeline, place bedpan, the water tank, the hand wash basin, the water heater, the galvanized pipe, the aluminum model the tube, the pvc tube, the pp-R multiple-unit tube, the hot air pipe, the valve, the water cock, the inside and outside wall leakage, the machinery opening sewer, to replace the floor drain
青岛管道专家专业热线电话;13012952726提供管道安装维修;安装维修更换冷热水管道、座便器、后水箱、洗手盆、热水器、镀锌管、铝塑管、pvc管、pp-R复合管、暖气管、阀门、水龙头、内外墙渗漏、机械疏通下水、更换地漏、另外我们有节水型、直排式、虹吸式座便器全部按出厂价自销、五金配件保修五年。
-
A heat source overheat protector in medical instrument consists of one radiator which is connected with medical instrumental light source mounting rack, said medical instrument set with light source control main circuit, bimetallic strip temperature control unit set nearing the light source mounting rack and series connected in said main circuit through wire.
一种医用仪器中热源过热保护装置,由一个散热器构成,散热器与医用仪器的光源安装架连接,医用仪器中设置有控制光源的主电路,散热器靠近光源安装架的位置设置有一个双金属片温控器,双金属片温控器通过导线串联在所述的主电路中。
-
Oil engine injector fitting hole and below side of cylinder head form a angle, this hole system can't be measured directly by measurer when they are processed. So a machining detector is designed, it can measure oil engine injector fitting hole handily.
柴油机喷油器安装孔与气缸盖下平面成一个角度,该孔系在加工时不能采用量具直接测量,因此,设计了一种检具,它能比较方便地测量柴油机喷油器安装孔。
-
This article describes the application of the pipe-use ultrasonic anti-scaling device in the interstage cooler of the centrifugal air compressor.
针对这种情况,在压缩机循环冷却水入口处安装TC-2-20型高温高声强超声波管道防垢器,进行在线防垢除垢,达到了较好的防垢除垢效果,安装前,压缩机级间冷却器1a清洗2~3次,安装后1a只需清洗1次;同时还起到了一定的强化换热作用,安装后,压缩机二、三级气体入口温度平均下降了2~3℃。
-
MA Zhihong, LI Jinguo. Designing technique for antivibrating and antishocking of military equipment [J].Equipment Environmental Engineering,2006, 3(5):7073.[3] ZHAN Jiakai,DING Hui,NING He,et al.
由试验结果还得到,安装减振器前,A点响应的总均方根加速度值为4.205 g,安装减振器后,总均方根加速度值为1.779 g,减振效率达到57%。
-
The furnace body is made ф2200×1500 theouter covering main body by the 12mm steel plate, lower part the furnace body 45° the installment has the sensor, the sensor orientation silicon steel plate is made the weight 2 ton induction iron cores by Wuhan Steel Corporation Silicon steel plate Factory production top gear's W-151 the cold rolling0.35m/m, primary is made the water cooling coil by 10×10×2 the copper pipe, and installs the stainless steel water cooling restricting, the power frequency has the core smelting furnace's metal melt fluid namely for the sensor sencondary coil, the entire electric stove is a transformer actually, thenecessary 6 grades from the pair regulating transformer, shift gears by the electricity cabinet control, the voltage may from low to high, divide 6 promotions to arrive at 380V, each grade of voltages are different, the output is also different, the furnace temperature along with the files position isalso different, but the height is different, adapts smelts colored or the black and so on melting point different metals, and may make the new furnace lining to smelt diamantine drying furnace fireproof.
炉体由12mm钢板制成Ф2200×1500外壳主体,炉体下部45°安装有感应器,感应器由武钢硅钢片厂生产的最高档的W-151冷轧0.35m/m取向硅钢片制成重2吨感应铁心,初级由10×10×2铜管制成水冷线圈,并安装不锈钢水冷保护套,工频有芯熔炼炉的金属熔液即为感应器的次级线圈,整个电炉实际就是一个变压器,配套一台6档的自耦调压变压器,由电柜控制换档,电压可由低到高,分6级升到380V,每档电压不同,输出功率也不同,炉温也随档位不同而高低不同,以适应熔炼有色或黑色等熔点不同的金属,并可作新炉衬耐火冶金砂烘炉之用。
-
Lastly, in accordance with the actual situations of the prototype structure of mosque pagoda, based on the similar relation of model experiments, a model structure of mosque pagoda with a similar coefficient of 1/10 is designed and fabricated. Earthquake simulating shaking table tests are performed on the model structure of pagoda in the cases the AB type passive control system with SMA dampers is erected or unerected. The leading earthquake responses like the relative drift at the top of the main tower and the small tower, interstory drift ratio, acceleration, and cracking process of the pagodas body etc. are studied. The operational behaviors involving the deformation capacity and energy dissipation capacity is tested for passive control system with SMA dampers under the earthquake excitation, and the corresponding control mechanism and regularity is also analyzed. Furthermore, the performance changes and protection effectiveness is comprehensively evaluated while the model structure of pagoda is seismically protected or not.
最后,根据光塔原型结构的实际情况,以模型试验的相似关系为基础,设计并制作了一个相似系数S,为1/10的光塔模型结构,并先后进行了未安装和安装A、B型SMA阻尼器被动控制系统光塔模型结构的地震模拟振动台试验,研究了模型结构在3种不同工况下,主塔顶部和小塔顶部的相对位移、层间位移角和加速度以及塔体开裂等光塔结构的主要地震反应,测试了SMA阻尼器被动控制系统在地震激励下的变形能力和消能能力等工作性能,分析了相应的控制机理和控制规律,并从总体上评价了光塔模型结构抗震保护前后的性能变化和保护效果。
-
Job as follows shall be finished next week:(1) Get right and left side of upper water wall positioned and reinforced;(2) Finish Pre-store nine downcomers;(3) All the wall are positioned and reinforced, and then install right and left side rigid beam;(4) Finish front wall counterpart welding;(5) Hoisting two rare roofs, Middle-temperature RH, four high temperature RH headers, hoist headers of middle-temperature RH and high-temperature RH, it can't install lifting rod.
下周,锅炉以下工作需要完成:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)后顶棚吊装2片、中温再热器、高温再热器集箱4个,吊挂中再和高再集箱时,不能安装吊杆。6)2台汽动前置泵找平找正,并验收;(7)电动给水泵组,耦合器和电泵就位;(8)启动锅炉房内设备找平找正,并验收;(9)3台复用水泵就位;(10)综合水泵房内设备找平找正,并验收。
-
The furnace body's ф2200×1500 outer covering main body is made of 12mm steel plate,installed sensor in the lower part 45°of furnace body, the sensor is weight 2 ton induction iron cores made from top gear's W-151 the cold rolling 0.35m/m made by Wuhan Steel Silicon steel plate Factory, primary manufactured the water cooling coil from 10×10×2 copper pipe, and installed stainless steelwater cooling cover, the power Frequency Induction melting Furnace 's metal melting fluid namely the sensor sencondary loop, the entire electric furnace is a transformer actually, match a 6 grades self regulating transformer, shift gears by the electric tank control, the voltage may from low to high,divide 6 grade to rise to 380V, each grade of voltage is different, the output power is also different, the furnace temperature is also different along with different grade,so can suit smelting colored or black and so on different melting point metals, and may use as new furnace lining fireproof to smeltdiamantine drying furnace.
炉体由12mm钢板制成Ф2200×1500外壳主体,炉体下部45°安装有感应器,感应器由武钢硅钢片厂生产的最高档的W-151冷轧0.35m/m取向硅钢片制成重2吨感应铁心,初级由10×10×2铜管制成水冷线圈,并安装不锈钢水冷保护套,工频有芯熔炼炉的金属熔液即为感应器的次级线圈,整个电炉实际就是一个变压器,配套一台6档的自耦调压变压器,由电柜控制换档,电压可由低到高,分6级升到380V,每档电压不同,输出功率也不同,炉温也随档位不同而高低不同,以适应熔炼有色或黑色等熔点不同的金属,并可作新炉衬耐火冶金砂烘炉之用。
-
R12 on the ozone layer due to the destruction of the requirements of the developed countries for environmental protection from 1996 to start using refrigerant R134a Automotive Air-conditioning and the construction of air-conditioning at home in a similar, it is often installed in the compressor engine, and with a belt drive, the condenser installed in the car in front of the radiator, and evaporator in the car inside, and work out from the evaporator of low pressure gaseous refrigerant flows through a high-pressure high-temperature gas compressor After cooling condenser cooling tube cooling into the low-temperature high-pressure liquid, through the desiccant dryers and storage of buffer, and then to a more stable flow of pressure and flow expansion valve, the final expenditure and the flow of relief evaporator.
由于R12对大气臭氧层的破坏,出于环保的要求发达国家从1996年开始改用R134a做制冷剂汽车空调的构造和家用的分体空调类似,它的压缩机往往是安装在发动机上,并用皮带驱动,冷凝器安装在汽车散热器的前方,而蒸发器在车里面,工作时从蒸发器出来的低压气态致冷剂流经压缩机变成高压高温气体,经过冷凝器散热管降温冷却变成高压低温的液体,再经过贮液干燥器除湿与缓冲,然后以较稳定的压力和流量流向膨胀阀,经节流和降压最后流向蒸发器。
- 推荐网络例句
-
The absorption and distribution of chromium were studied in ryeusing nutrient culture technique and pot experiment.
采用不同浓度K2CrO4(0,0.4,0.8和1.2 mmol/L)的Hoagland营养液处理黑麦幼苗,测定铬在黑麦体内的亚细胞分布、铬化学形态及不同部位的积累。
-
By analyzing theory foundation of mathematical morphology in the digital image processing, researching morphology arithmetic of the binary Image, discussing two basic forms for the least structure element: dilation and erosion.
通过分析数学形态学在图像中的理论基础,研究二值图像的形态分析算法,探讨最小结构元素的两种基本形态:膨胀和腐蚀;分析了数学形态学复杂算法的基本原理,把数学形态学的部分并行处理理念引入到家实际应用中。
-
Have a good policy environment, real estate, secondary and tertiary markets can develop more rapidly and improved.
有一个良好的政策环境,房地产,二级和三级市场的发展更加迅速改善。