套圈
- 与 套圈 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Will multiturn potentionmeter ctance presetable posted back to the half of the, to the photoelectricity scanner to adjust after the enterprises'high of overprinter, in which case should be used to make low business card printing and membership card production line speed for manual overprinter, so that is the subject of color for each set of their corresponding respectively overprinter space.
不兵众圈电位器反向不派遣一半的格数,到平电扫描器调动好后,举行套印的运转,这时答拔取尽度矮的制卡和会员卡制作线速度举行手动套印,使各个套印色不本分别出去自己差答的套印空格洋。
-
As our base we sat in a circle and did the sequence of floor exercises I developed to stretch and strengthen, and clapped rhythms. The students took turns moving around the outside of the circle while the students sitting clapped sets of (1, 2, 3, 4) and substituted silent claps for each of the numbers. These students, age 5 to 9, though academically challenged could, nonetheless, clap the patterns rhythmically, somatically. This period of time added to the material for the text Adaptive Rhythmic Movement for Children to Seniors.
我们坐下来围成一个圈并做自由体操系列,我开发了一套舒展和加固,并且拍节奏,学生在外面的圈子轮流移动,当学生坐着拍(1,2,3,4)和用安静的拍手声替代其中每一个数字,这些学生,年龄都在5-9岁,理论上来讲,规范而有节奏的拍手对他们身体是有挑战性的可能,这个期间为孩子们和老年人增加了适应节奏性运动的有关内容。
-
A model of basic structure of the tectosphere and uniform layer in the study area is preliminarily constructed by using 3D Vp values with a grid of 1°×1°to the 400 km depth in Northeast China and selecting two representative sections perpendicular to each other and a structure model spectrum to the depth of the transition layer in the study area is depicted by using eight Vp value sections along different longitudes and latitudes.
利用东北地区1 1 深至400km的三维Vpkm/s)值数据,选择互相垂直的2条有代表性的剖面,初步建立研究区构造圈、均匀层基本结构模型;利用8套沿不同经纬线的剖面Vp值分布,勾绘出研究区深至过渡层的结构模型谱:进一步综合得到研究区三维岩石圈结构模型。
-
Moveable aerodynamics Budget controlled teams will be allowed to have their front wing adjusted by 1 0°, a surplus of 4° over the teams that choose to go with the conventional r ule set.
可动空气动力套件预算帽车队的前翼将被允许10度的调整,比其它车队多4度的选择,而且次数不作限制--没有没圈两次的限制。
-
In the early days of astronomy before the advent of Newton's f=ma, planetary events were predicted on Ptolemy's model of nested circular orbits -- wheels within wheels.
在天文学的早期,也就是在牛顿的f=ma出现之前,星事都是通过托勒密的嵌套圆形轨道模型,就是那种一个圈套着一个圈的模型来进行预测的。
-
In this article , instead of changing the ubiety among the parts of the original elevator , the author keeps on using the original structure. However, because of the differences of the transmission ratio and speed, the author enlarges the planet gear, solar gear , thickness of the inner circle ring as well as the enclasping radius of the enclasping brake through the mechanical design and calculation .
在设计过程没有改变原有的升降机零部件〖需要本套毕业设计请联系QQ:809940198〗的位置关系,但由于,传动比以及传动速度的不同,所以,通过受力分析计算,加大了行星齿轮、中心齿轮、内齿圈的厚度;同时也加大了抱闸抱紧时的抱紧半径。
-
In recent years, the company has successfully developed some special production lines for manufacturing ordinary batteries, namely, D size, Size C, and Size AA. Now running in the workshop is another assembly line for carbon rod processing machinery. For the past decade, it has introduced most advanced manufacturing techniques and control techniques from abroad, and therefore it has managed to develop automated machines for producing alkaline batteries. The automatic assembly lines that it possesses are: Lines LR6 and LR03 for 200 cells per minute, 300 cells per minute, 400 cells per minute, 600 cells per minute and 1000 cells per minute, Lines LR20, LR14 and LR61 for 150 cells per minute and 300 cells per minute. Powder spraying conducting film, machines for negative electrode calamine cream, diaphragm machines with a speed of 30 cells per minute; negative electrode electric welding machines with a speed of 200-300 cells per minute; current collector assembling machines with a speed of 200-400 cells per minute; battery tray fillers with a speed of 200-400 cells per minute, insulating ring assembling machines with a speed of 300 cells per minute; electroscope machines, 4-cell furling machines with a speed of 300 cells per minute.
公司先后开发了普通电池生产线:一号、二号、五号电池流水线和普通碳棒加工机械,特别是近十年来公司吸收并消化了国外最先进的生产工艺、控制技术,研制开发了国内最先进的自动化碱性电池机械,有200只/分钟、300只/分钟、400只/分钟、600只/分钟、1000只/分钟的LR6、LR03电池自动化生产流水线;有150只/分钟、300只/分钟的LR20、LR14、LR61电池生产线;有正极拌粉系统喷导电膜设备、负极拌锌膏;有30只/分钟的卷隔膜套机,200-300只/分钟负极钉高速点焊机,200-400只/分钟的集电体高速组装机,200-400只/分钟的电池装盘机,300只/分钟的绝缘圈组装机,300只/分钟的验电机和四节缩机等。
-
There are 13 FUSAN CONSTRUCTION MACHINERY CO.,LTD PDF 文件使用"pdfFactory Pro"试用版本创建 www.fineprint.cn FUSHAN TOWER CRANE OPERATINGINSTRUCTIONS-QTZ125G(FS6016) symmetrically installed the two set of slewing mechanism on two side of the support, and pinion of its lower is joggled with outer circle of slewing support correctly.
3.1.7 上支座(见图 3-7)upper support 上支座上部用 16 个螺栓与回转塔身相连,下部用高强度螺栓与回转支承相连。在支承座两侧对称地安装两套回转机构,而在它下面的小齿轮准确地与回转支承外齿圈啮合。
-
The centre lip guides the rollers at their end faces; the two outer lips retain the rollers when the inner ring with the roller sets is swivelled out of the outer ring.
该中心在其唇指南结束辊面临的两位外唇时,保留与辊套内圈是swivelled外圈的滚出来的。
-
The main products are selling all kinds of ball joint assembly, straight drawbars assembly, the arm assembly, flywheel ring gear, metal handle of the door, the shaft sleeve, such as Jack more than 30 varieties, Models widely applied throughout the country, with the market-and enjoy high reputation, the products have been sold to over 20 provinces, municipalities and autonomous regions.
主要产品有各种球销接头总成、直拉杆总成、支臂总成、飞轮齿圈、外门金属拉手、中轴衬套、千斤顶等三十余个品种,适用车型广泛,在全国微配市场上享有较高的声誉,产品已销往全国二十多个省、市、自治区。
- 推荐网络例句
-
I didn't watch TV last night, because it .
昨晚我没有看电视,因为电视机坏了。
-
Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.
今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。
-
I'm running my simile to an extreme.
我比喻得过头了。