英语人>网络例句>大破坏 相关的搜索结果
网络例句

大破坏

与 大破坏 相关的网络例句 [注:此内容来源于网络,仅供参考]

The content of mineral elements in ripe fruits of M.sieversii from 78 seedings at Mohe Town,Gongliu Country were analyzed using Atomic Absorption Spectrophotometer.The results indicated that M.sieversii seedings presented considerable genetic variations in content of mineral elements with the range of variation coefficients from 24.2% to 54.0%.So it has large potential for further selection.Four elite seedlings were selected,namely large fruit type,high Ca content type,high Zn content type and high damascenone content.As the predominant component of Ily wild fruit tree forest,Malus sieversii had occupied an area of 9300ha.But the inherent reproduction system of M.sieversii and genetic diversity of the species were destructed in different degrees,as a result of farming assart,over grazing and damage by Agrilus mali.

上述结果支持"新疆野苹果可能是栽培苹果祖先种"的结论;②对巩留县莫舍乡的新疆野苹果78个实生株系果肉组织Ca、Mg、Fe、Zn、Cu、Mn6种矿质营养元素进行测定的结果表明,每种矿质元素含量单株间差异显著,变异系数在24.2%~54.0%,遗传多样性丰富,进一步选择的潜力很大;③根据新疆野苹果果实形态、香味物质和矿质元素含量等的测定结果,初步筛选出了大果型、高钙型、高锌型和大马酮型等4个特异性状单株;④调查发现,由于农田开垦、过度放牧以及苹果小吉丁虫的蔓延危害,目前伊犁野果林面积逐年减少,野苹果固有的繁育体系和遗传多样性受到不同程度的破坏。

When it is great enough to destroy the combination between the top layer atom and the next layer of atom, the top layer atomics are removed.

随着工件表面受力的增大,工件表面可能产生塑性变形,足够大的时候就可以破坏表层原子与下一层原子之间的结合,实现表层原子的去除,反力越大就意示着能去除掉更多数量的原子。

"After extensive consultation with the state ..., the committee felt that the unilateral reduction in the size of the sanctuary and plans to proceed with hydrocarbon prospect ion would destroy the value and integrity of the property, which is also home to other endangered species including, the Arabian Gazelle and houbara bustard," it said.

联合国指出,委员会在经过广泛的评估后,认为阿曼政府单方面决定减少阿拉伯大羚羊保护区面积,使到供应碳氢化合物植物也跟著减少,将破坏这块土地的完整性以及珍贵性。除了阿拉伯大羚羊,这里也是其他濒临绝种生物如阿拉伯瞪羚和波斑鸨的家园。

The external fixator was a good, economical, effective and simple method in the treatment of femoral neck fracture. The three pins used in fixation of femoral neck fracture are important. The placement of the pins should be in accordance with the compressive trabeculae and clingy to the femoral calcar.

3动力髋螺钉虽然在固定强度上优于其它各组,但却由于手术创伤大、对股骨头残存血供破坏较大等缺点而限制了其应用;自行设计的外固定支架为一种简单、有效、实用、经济的固定方法,有一定的推广价值;穿针方向应循压力骨小梁方向尽量贴近股骨距低角度倒三角形钻入才符合生物力学原理。

The prior cycles with higher axial stress and larger strain range greatly restrains ratchetting strain of subsequent cycling with lower ones. Creep behavior plays an important role in the ratchetting strain and its influence on ratchetting behavior can not be neglected. Fracture morphology characteristics of two kinds of materials were investigated by scanning electron microscope. It shows that failure of material A is induced by cavitation and that of material B is induced by decohesion. For material A, with the decreasing strain amplitude the fracture surface shows more larger diameter globular particles under uniaxial loading and can be seen more obvious and deep crack under multiaxial loading. However for material B, with the decreasing strain amplitude fracture surface shows larger and larger scalelike shape and becomes more smooth under uniaxial loading, but fracture surface under multiaxial loading looks like more smooth than that of uniaxial loading, and shows gradually wave-like morphology.

通过扫描电子显微镜研究表明:材料A为空穴引起的失效,材料B为剥离导致疲劳破坏;随着载荷幅值的减小,材料A在单轴载荷下,断口表面浮出更多更大直径的球状颗粒,而多轴载荷下,可以看到很深的裂纹;随着载荷幅值的减小,材料B在单轴载荷下,断口表面鱼鳞片越来越大,表面越来越平整,而多轴载荷与单轴载荷相比,断口表面看上去更加平整,并且随着载荷幅值的减小,断口逐渐呈现波浪形貌;通过微观的傅立叶变换红外光谱分析,结果表明随着应变幅值的增加,无论载荷是单轴还是多轴状态下,橡胶材料吸光度比值随着幅值的增加而增加,这说明体系中的结晶含量也随之增加。

The experimental results indicated that the specimen had a large deformation when the ratio of consolidation stress and frequency were larger and the relative density was smaller.

试验结果表明,当固结应力比、频率较大,而相对密度较小时,试样有较大的变形,更容易发生破坏。

The experimental result indicates that the sample has a large deformation when the parameters of ratio of consolidation stress, frequency are higher and the sample has a small deformation when the parameter of density is higher.

试验结果表明,当固结应力比、频率较大,而相对密度较小时,试样有较大的变形,更容易发生破坏。

Based on testing datas in worksite and engineering practice,this paper mainly discussed strata damage movement characteristic, rock properties of weathered zone, qualitative and quantitative analysis of the law of coal layer safety extraction in weathered zone when the coal layer is extracted in efflorescent oxygenized belts.

根据现场观测资料和工程实践,着重论述了风氧化带内煤层开采时覆岩破坏移动特征,风化带岩石属性和风氧化带内煤层安全开采机理的定性、定量分析。提出了风氧化带煤层开采无垮落带;受采动影响后,具阻水和抑制导水断裂带继续发展的双重作用以及移动快、变形大、回宿快、下沉大和适当加大开采厚度等新观点

The soil cutting experiment indicates that the interior friction angle and the shear intensity of soil is reduced;and the maximum principal stress is decreased due to the vibration load;it induces the decrease of digging resistance.

从理论上研究了振动掘削岩土的减阻机理,土壤剪切试验结果表明,振动载荷能够使土壤的内摩擦角变小、抗剪强度下降、最大主应力值减小,从而导致挖掘阻力降低;对土壤在静态载荷和振动载荷作用下的失效过程进行了对比仿真实验研究,可知土壤在振动加载的条件下强度显著下降,并提前于相同条件的静态加载而破坏,同时跟踪X方向的载荷发现,振动掘削最大掘削阻力可降低50%。

The main research contents are as follows:1. Through massive calculation, analysis and comparison, sum up the similarities and differences between the special-shaped cross sections and rectangular cross sections in mechanical features, between reinforced concrete special-shaped columns and rectangular columns in load-bearing capacity, ductility performance and provide necessary basic concepts and data for further understanding the characteristics of the special-shaped columns;2. Through massive elastic calculations and elasto-plastic analysis, under the preconditions of satisfying the code's requirements for axial compression ratio, limit value of lateral displacement and load-bearing capacity of normal section,oblique section and beam-column joint, under circumstances of different intensity of earthquake, structure dead weight, sort of site and column grid bay dimension, the variation regularity of maximum suitable height of structure, and thus sum up the maximum suitable height of structure for code for the purpose of macro-control while deciding the design scheme;3. Make a preliminary study on the stress feature of reinforced concrete special-shaped column and Z-shaped column of which the ratio of limb length to limb thickness is between 4~5 ,and the preliminary design method is suggested;4. Through elato-plastic time history dynamic analysis of typical projects, check up the weak storey of the special-shaped column structure and yielding, breaking and collapse mechanism to satisfy the earthquake resistant requirement to buildings of remaining stand under strong earthquake;5. Derive for project use simplified calculation formula of vibration period, suitable vibration period, suitable rigidity of special-shaped column structure through theoretical analysis, and provide an easy and practical method for deciding the structure scheme economically, safely and reasonably;6. Based on the study achievements in theory and massive analysis and calculations of this paper, sum up the regularities of inner force, deformation of special-shaped column structure and seismic conceptual design, and thus the suggection of seismic design of special-shaped column structures is presented.

本文研究的主要内容如下:通过大量的计算、分析和对比,总结出异形截面与矩形截面在力学特性、钢筋混凝土异形截面柱与矩形截面柱在承载能力、延性性能等方面的异同,为深入了解异形截面柱的特点提供必要的基本概念和数据;通过大量的弹性及弹塑性计算分析,在满足规程对轴压比、侧移限值及正截面、斜截面、节点承载力抗震验算要求的前提下,在不同抗震设防烈度、结构自重、场地类别及柱网开间尺寸情况下最大适宜高度的变化规律,并在此基础上总结归纳出异形柱结构的最大适用高度规定,可用于规程,以便于在确定方案时起到宏观控制的作用;对肢长与肢厚比在4~5的钢筋混凝土异形截面柱及Z形柱的受力特点进行初步探讨,提出初步的设计方法;通过对典型工程的弹塑性动力时程分析,检验异形柱结构的薄弱层及屈服、破坏、倒塌机制,以达到建筑物大震不倒的抗震设防要求;通过理论分析,推导出异形柱结构自振周期,以及适宜自振周期、适宜刚度的工程实用简化计算公式,为经济、安全、合理地确定结构方案提供简便实用的方法;在本文理论分析、计算以及大量的研究成果基础上,总结归纳出异形柱结构内力、变形的规律及抗震概念设计内容,并在此基础上提出异形柱结构的抗震设计建议。

第11/52页 首页 < ... 7 8 9 10 11 12 13 14 15 ... > 尾页
推荐网络例句

I didn't watch TV last night, because it .

昨晚我没有看电视,因为电视机坏了。

Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.

今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。

I'm running my simile to an extreme.

我比喻得过头了。