大比例尺的
- 与 大比例尺的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
the digitized mapping technique is to combine the field data collection system with the computer assisted mapping system in surveys by computer technology.it aims to realize the information collected and processed digitally and automaticaity.the digitized mapping technique can cut short the working time,lighten the labor intensity and enhance the precision of the productions.the system consists of three parts,such as data input,data processing and data output.the survey-record digitized mapping technique is widely used in the digitized mapping working pattern.for its superiority over traditional plane-table mapping in accuracy and efficiency,the large scale digital mapping is becoming more and more popular.compared with traditional analogue mapping,digital mapping has more quality control pivotai points,and its contents and methods are more complex.with the appearance of new technology gps ,the coordinate of different levels controlling points may be surveyed in high precision and it has been applied widely in topographic survey.the operation process of gps electronic tachometer is introduced and its application in topographic survey is br
计算机应用论文,计算机论文, rtk ,全站仪,数字测图,地形测量, gps论文摘要:数字测图是在测量工作中利用电子计算机技术将野外数据采集系统与内业机助制图系统相结合,其目标是实现信息采集处理的数字化、自动化、信息化。数字测图可以缩短作业时间,减轻劳动强度,提高成果精度。数字测图系统主要由数据输入、数据处理和数据输出3部分组成,数字测图作业模式中测记式数字测图应用最为广泛。大比例尺数字测图正以其测图精度高,成图速度快等优势逐步的取代传统的,以平板仪为主的模拟测图。与传统的模拟测图相比,数字测图的质量控制关键点更多、内容与方法更为复杂。gps 新技术的出现,可以高精度并快速地测定各级控制点的坐标,在地形测量中已得到广泛地应用。本文介绍了gps 配合全站仪的作业流程,简要阐明了其在地形测量中的应用。在利用实测数据成图的过程中,解决一些常见的问题,并给出解决的办法及依据,同时给出一些有益的结论,以适应实际使用的需要。
-
In order to solve the important and basic problem of the petrogenesis of "Tiantangzhai migmatitic granite" in the core of Dabie orogenic belt, the detailed 1∶50000 regional geological surveying and the big scale dissection of important region (metamorphic rocks, granites and structure), were operated in about 900km〓 area near Tiantangzhai peak. On the bases of the petrology, mineral chemistry, geochemistry of rare earth element and microelement, isotope geochemistry and chronology, physicochemistry, magmatic dynamics, geodynamics, diagenetic simulation, and regional geophysical data, the theory of cooling age and historical geochemistry and the viewpoint of tectonic evolution are applied to study the petrogenesis of Yanshan epoch granites of this region. On the bases of above studies, the process of tectonomagmatic dynamics after indo-Chinese epoch in Dabie orogenic belt is discussed. The important conclusions are gotten
本文针对大别造山带核部&天堂寨混合花岗岩&成因这一重大基础地质问题,在天堂寨一带近900km〓的面积上进行了详细的1∶5万区域地质调查和大比例尺重点区解剖,通过对区内燕山期花岗岩进行岩石学、矿物化学、稀土微量元素地球化学、同位素地球化学和年代学、物理化学、岩浆动力学、地球动力学和成岩计算机模拟等研究的基础上,结合区域地球物理学资料,应用冷却年龄、历史地球化学理论和构造演化观,阐明区内燕山期花岗岩成因,并以此为基础进一步讨论了大别造山带自印支期以来的构造—岩浆动力学过程,取得了如下的重要认识
-
The results showed that:(1) some governing points, which were measured by submeter precision GPS, were utilized to correct the 1 m precision remote sensing image and it could satisfy the desired precision of geometrical correction, therefore, this method could be used as geometrical correction in the region where was short of the big scale relief map;(2) the density of the original data was the main factor to affect precision of the volume, and the precision of the calculated volume of earthwork could be improved to more than 90% when using the test points and feature points; the sparser the data density were, more significant could be improved; On the base that elevation of test points were measured by the submeter precision GPS, the error of the volume, which was produced by vectoring relief map to obtain DEM, could be calculated, and the calculation precision of the earthwork could be improved markedly.
结果表明:利用平面精度达亚米级的GPS测量控制点坐标对1米分辨率的遥感卫星影像进行几何校正,能够满足其几何校正的精度要求,可以解决缺乏大比例尺地形图地区的高分辨率遥感卫星影像的几何校正问题;通过对模型数据的分析,数据密度是影响体积精度的主要因素,利用检测点高程和特征点可以提高土方量计算的精度,使土方量计算的精度达到90%以上,数据密度越稀疏,精度提高越显著;采用高程精度达厘米级的RTK(Real Time Kinematic实时动态差分)测量检测点的高程,对用地形图扫描矢量化形成的DEM模型进行检测求出误差体积,可以大大提高土方量的计算精度。
-
Project construction is in the national spatial coordinate reference frame, based on the use of high-tech means of Geodesy, in Baotou city, the information on outcomes and quality of the original plane, gravity surveying and mapping information, etc. Based on the results, in accordance with unified planning and overall design principles, laid covering the city's domain sets plane, elevation, gravity field information based on the integrated control network formed by the geodetic datum, elevation and gravity reference base composed of high-precision, three-dimensional center of the earth and practical reference Baotou modern surveying and mapping system for the "Digital Baotou" construction and large-scale mapping projects such as surveying and mapping provides a unified spatial orientation reference.
项目建设是在国家空间坐标基准框架的基础上,利用大地测量的高新技术手段,在包头市原有平面成果资料和水准、重力资料等测绘成果的基础上,按照统一规划、整体设计的原则,布设覆盖全市域集平面、高程、重力场信息于一体的综合性基础控制网,形成由大地基准、高程基准和重力基准等组成的高精度、三维地心、实用的包头市现代测绘基准体系,为&数字包头&建设和大比例尺测图等测绘工程提供了统一的空间定位基准。
-
Here I reported new structural data to answer above question, including field section observations and geologic map with large scale in a key area, accompanying with detail microstructural observations, quartz C-axial fabric analyses, and tectono-thermogeochronology (40Ar/39Ar and zircon SHRIMP U-Pb method). Taking available previous data into account, following progression is achieved:1. Completely rebuilding the post late-Paleozoic deformation history of the Harlik MountainFive stages of deformation were identified:(1)pre-Permian compression deformation which may have resulted from pre-Permian subduction;(2) earlier Permian post-collision extension;(3) middle Permian west-east directed dextral slip shearing;(4) later Permian nearly N-S compression deformation; and (5) later Cenozoic intra-plate N-S compressional deformation.
本文选择新疆东部哈尔里克山为研究对象,通过详细的野外路线地质构造调查和关键地区大比例尺地质填图,以及室内显微结构观察、石英岩组分析和构造热年代学(Ar-Ar和锆石SHRIMP U-Pb定年)研究,结合前人研究成果,取得了如下新进展:1、系统重建了哈尔里克山晚古生代以来的变形历史识别和确定了该区板块俯冲碰撞阶段的二叠纪以前挤压变形,后碰撞阶段早二叠世伸展变形、中二叠世近东西向右行走滑变形和晚二叠世近南北向挤压变形,以及板内演化阶段的晚新生代南北向挤压变形等5期构造变形事件。
-
The paper introduces the latest development and application in the production of engineering survey technology. GPS allocation technology and the combination of GPS and total station have been widely used in plane surveying of control survey. Electron distance trigonometric leveling can replace third and fourth-order spirit leveling in vertical survey. Data collection, processing and drawing by total station has achieved automation and integration in topographic survey, etc.
随着工程测量技术的发展,控制测量中平面测量已广泛地采用了GPS定位技术、GPS与全站仪相结合的技术,高程测量中电子测距三角高程能代替三、四等几何水准测量;地形图测绘中,实现了全站仪从野外数据采集、处理到绘图过程的自动化和一体化;摄影测量和高分辨率遥感技术在大比例尺地形测图中的应用等。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?