英语人>网络例句>外砌的 相关的搜索结果
网络例句

外砌的

与 外砌的 相关的网络例句 [注:此内容来源于网络,仅供参考]

Besides the pyller, the tower check with the tower inscription become with the blue stone carving, all uses the levigation brickwork to make all over the body becomes, the pyller with the high relief technique, is decorating the flying apsaras, the imperial concubine gal and so on classical design.

除塔门、塔刹和塔铭用青石雕成外,通体皆用水磨砖砌造而成,塔门用高浮雕的手法,装饰着飞天、嫔伽等古典图案。

Wuliangshan Hall building is a brick structure, the Temple is inside a curiosity Amitostigma beamless,dian wai nolang yan, unique shapes, it is also known as the "Temple beamless" high artistic value, inside the corridor wall around , in the corridor at any one site may see the face of the entire Temple.

无量殿是一座砖砌结构建筑,该殿奇特之处在于殿内无梁无柱,殿外无廊檐,形制非常独特,因此又称为&无梁殿&,艺术价值很高,殿内壁上有走廊一圈,在走廊的任何一个部位均可看清全殿面貌。

Tall heat preservation is light the wallboard outside pledging with local farming, forestry discards the wood fibre such as straw, wheat straw, straw, sawdust is raw material, coefficient of thermal conductivity is less than 0.38, it is our country is in a technology at present of banner level outside wall insulation material, structural thermal resistance is as high as 2.55, thermal resistance effect is equivalent to thick the wall of bricky build by laying bricks or stones that amounts to 1.2 meters, country of energy-saving standard prep above is energy-saving 60% index.

高保温轻质外墙板以当地农、林业废弃秸秆、麦秸、稻草、锯末等木质纤维为原料,导热系数小于0.38,是我国目前处于技术领先水平的外墙保温材料,结构热阻高达2.55,热阻效果相当于厚达1.2米的砖砌墙,节能标准高于国家节能60%指标。

The aim are:lTo examine the proliferation ability and potential chondroblast differentiation ;2To find an ideal condition stimulated BMSC differentiate into chondroblast;3To examine the chondroblast proliferation in porous scaffolds and to explore the interaction between cells and materials;4To examine the release of cytokine in vitro.

取健康成人略后上棘处骨髓 5ml,经 percoll液分离后密度梯度离心,10'砌l密度接种培养,观察原代细胞的贴壁、增殖状况,细胞长满瓶底后进行传代培养;传至第三代细胞,重新消化后以500转/分钟轻度离心 5分钟,10V加 l接种,改用化学限定培养基代替完全培养基培养,倒置显微镜观察细胞生长情况及形态变化,甲苯胺蓝染色观察诱导细胞合成细胞外基质QCM)中的蛋白多糖,免疫细胞化学染色检测ECM中*胶原的蛋白合成,RT干CR鉴定诱导细胞*胶原mRNA的表达。

At the back was a small bricked house-yard, and beyond that a big square, gravelled fine and red, and having stables on two sides.

屋后是一个砖砌的小小庭院,庭院外有一大块空地,铺满了红色的砾石,两旁是马厩。

Practice of the high blast temperature in 300 m 3BF of Maanshan Iron and Steel Co.Ltd;2. Measures to high blast temperature operation;3. A series of measures for realizing high blast temperature and long campaign have been taken in the design of ex- ternal combustion type hot air stove provided by Nippon Steel for 4350m~3 blast furnace newly built in Taiyuan Iron and Steel Co.

在新建的太钢4350m~3高炉新日铁外燃式热风炉的设计中,围绕高风温长寿命采取了一系列措施:蓄热室、燃烧室、混风室内墙体与拱顶的拱角相接处,采用迷宫式结构,防止独立砌体间窜风;在开孔部位采用组合砖,以提高这些关键部位的气密性和结构稳定性;蓄热室内采用带凹凸槽的小孔径七孔高效格砖,提高加热面积;采用分离型余热回收装置预热助燃空气和煤气等。

A series of measures for realizing high blast temperature and long campaign have been taken in the design of ex- ternal combustion type hot air stove provided by Nippon Steel for 4350m~3 blast furnace newly built in Taiyuan Iron and Steel Co.

在新建的太钢4350m~3高炉新日铁外燃式热风炉的设计中,围绕高风温长寿命采取了一系列措施:蓄热室、燃烧室、混风室内墙体与拱顶的拱角相接处,采用迷宫式结构,防止独立砌体间窜风;在开孔部位采用组合砖,以提高这些关键部位的气密性和结构稳定性;蓄热室内采用带凹凸槽的小孔径七孔高效格砖,提高加热面积;采用分离型余热回收装置预热助燃空气和煤气等。

Decades, the system does not always produce pipes, tiles, cement products and other traditional rod, but the development should be high (high-strength, high pressure) and large, new (new building materials and products) as a key to develop new products In detail: to develop high-strength prestressed concrete pile; apply to set up more than 110 kilovolt high voltage transmission lines and electrified railway lines, etc. Catenary large t m poles; application of new high-speed heavy rail with pre-stressed concrete sleeper; high-pressure , large-diameter prestressed concrete cylinder pipe; steel concrete and prestressed steel-concrete composite pipe; new type of reinforced concrete pipes, such as the mouth and socket bearing steel reinforced concrete pipes, square pipes, short-shaped pipes, common drains ; reinforced concrete inspection and; urban and rural construction using a variety of hollow interior wall panels and composite wall panels, concrete hollow block.

不能几十年一贯制生产管、瓦、杆等传统水泥制品,更应把发展高、大、新作为重点开发新产品,具体讲:大力发展预应力高强混凝土桩;适用于架设110 千伏以上高压输电线路和电气化铁路接触网线路等的大吨米电杆;适用高速重载铁路用的新型预应力混凝土轨枕;高压、大口径预应力钢筒混凝土管;钢板混凝土和预应力钢板混凝土复合管件;新型钢筋混凝土排水管,如钢承口和承插式钢筋混凝土排水管、方型渠、短形渠、共同渠;钢筋混凝土检查并;城乡建设用的各种空心内墙板和复合外墙板、混凝土空心砌块。

A community of thirty-seven hermits living in various hermitages in Bavaria and the Tyrol having asked for aggregation, the General Chapter of the Discalced Carmelites of 1689 granted their wish under certain conditions, among others that not more than four or five should live in each hermitage, but the decree was rescinded in 1692, for what reason is not known, and all connection between these hermits and the order was severed.

一个社区的37隐士生活在各种修砌在巴伐利亚和蒂罗尔经询问,为聚集,一般章节的discalced carmelites的1689批,他们希望在一定的条件下,除其他外表示,不超过4个或5个应该活在每个冬宫,但该法令被废除,在1692年,原因是什麼,不知道,而所有连接这些隐士和命令切断。

A community of thirty-seven hermits living in various hermitages in Bavaria and the Tyrol having asked for aggregation, the General Chapter of the Discalced Carmelites of 1689 granted their wish under certain conditions, among others that not more than four or five should live in each hermitage, but the decree was rescinded in 1692, for what reason is not known, and all connection between these hermits and the order was severed.

一个社区的37隐士生活在各种修砌在巴伐利亚和蒂罗尔经询问,为聚集,一般章节的discalced carmelites的1689批,他们希望在一定的条件下,除其他外表示,不超过4个或5个应该活在每个冬宫,但该法令被废除,在1692年,原因是什么,不知道,而所有连接这些隐士和命令切断。

第1/2页 1 2 > 尾页
推荐网络例句

But we don't care about Battlegrounds.

但我们并不在乎沙场中的显露。

Ah! don't mention it, the butcher's shop is a horror.

啊!不用提了。提到肉,真是糟透了。

Tristan, I have nowhere to send this letter and no reason to believe you wish to receive it.

Tristan ,我不知道把这信寄到哪里,也不知道你是否想收到它。