处理顺序
- 与 处理顺序 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
To ensure close adhibition of connecting board, screwing should start from center to outside, that is, screwing from enlarged center to skirting area. To avoid coating's influence on tensile force, screwing work should be finished on one day. And to decrease prestress' difference of high-tension bolt, bolt screwing runs in two steps: primary screwing and final screwing. For large-scale joint with great amount of bolts demands a second screwing.
为使被连接板叠密贴紧,应从螺栓群中央顺序向外施拧,即从节点中刚变大的中央按顺序向下受约束的边缘施拧,为防止高强度螺栓连接副的表面处理涂层发生变化影响拉力,应在当天终拧完毕,为减少先拧后拧的高强度螺栓预拉力的差别,其拧紧必须分为初拧和终拧两步进行,对于大型节点,螺栓数量较多,则需要增加一道复拧工序。
-
Under soil water stress conditions, the photosynthesis rate, water useefficiency and light compensation point of Atriplex canescens obviouslyreduced, and its dark respiration rate weakened. In the treatments in July, theaccumulative and average value of daily Pn from high to low is: light soil water stress>no soil water stress>medium soil water stress>heavy soil water stress, the valueare 7.162μmolm~(-2)s~(-1)、6.106μmolm~(-2)s~(-1)、6.103μmolm~(-2)s~(-1) and 1.761μmolm~(-2)s~(-1), respectively. In the treatments in August, the accumulative and average value ofdaily Pn from high to low is: light soil water stress>medium soil water stress>heavy soil water stress>no soil water stress, the value are 7.378μmolm~(-2)s~(-1)、4.738μmolm~(-2)s~(-1)、1.794μmolm~(-2)s~(-1) and 1.705μmolm~(-2)s~(-1), respectively.
在土壤水分胁迫下四翅滨藜的净光合速率、水分利用效率、和光补偿点显著降低,暗呼吸速率减弱。7月份各处理Pn全天的累计值和平均值的大小顺序为:轻度土壤水分胁迫>无土壤水分胁迫>中度土壤水分胁迫>重度土壤水分胁迫,它们的值分别为:7.162μmolm~(-2)s~(-1)、6.106μmolm~(-2)s~(-1)、6.103μmolm~(-2)s~(-1)和1.761μmolm~(-2)s~(-1)。8月份各处理的Pn全天累计值和平均值的大小顺序为:轻度土壤水分胁迫>中度土壤水分胁迫>重度土壤水分胁迫>无土壤水分胁迫,它们的值分别为:7.378μmolm~(-2)s~(-1)、4.738μmolm~(-2)s~(-1)、1.794μmolm~(-2)s~(-1)和1.705μmolm~(-2)s~(-1)。9月份四翅滨藜的Pn变化趋势于8月份的变化曲线基本相似,唯一不同的变化就是各个处理的Pn比8月份的要高,这可能于9月份气温降低,湿度增大有关。
-
This invention discloses a multi-queue sequence buffer management circuit and a method based on a pipeline applying a pipeline structure including: an arbitration circuit selecting one for process from read, write and distribution buffer requests, a buffer slot state module designing state of the slot requiring operation and queue numbers and assigning idle slots, a buffer slot filter module filtering the slot, a buffer slot filter module filtering the slot states not belonging to the current operation queues nor idle aligned in terms of the head pointer, a queue slot selection module computing continuous idle slot numbers from the slot pointed by the head pointer and refreshing the head pointer and selecting preparing slots, a queue slot prior queuing module refreshing the read pointer and result numbers of the current operation queues with the pointer of the first prepare slots and their numbers which can support multi-queue to share one buffer space, queues can access the buffer in overlap.
本发明公开一种基于流水线的多队列顺序化缓冲管理电路及方法,本发明电路采用流水线结构,包括:仲裁电路,从读、写、分配缓冲请求中选取一路进行处理;缓冲槽口状态设置模块,设置请求操作的槽口状态和队列号,分配空闲槽口;缓冲槽口滤除模块,滤除不属于当前操作队列且非空闲态的槽口状态,按头指针对齐;队列槽口选择模块,计算头指针指向槽口起的连续空闲槽口数并更新头指针,选出预备态的槽口;队列槽口优先排队模块,用第一个预备态槽口的指针和预备态槽口数分别更新当前操作队列的读指针和结果数;本发明可以支持多个队列共享一个缓冲空间,各类指令队列能对缓冲进行交叉访问,并对指令结果的写入读出进行顺序化管理。
-
Similarly called a nondeterministic finite automaton, it is another simple model of computation, although its processing sequence is not uniquely determined.
同样所谓的非确定性有限自动机,它是另一种简单的模型计算,但其处理顺序不是唯一确定。
-
The measured object can be found within a few milliseconds in the raster-scan image. 4 . Two lines delay for the processed image is implemented using two 128×8 shift registers with the configurable logic block in FPGA. A new fully pipelined bit parallel hardware architecture for Sobel edge detection is implemented with FPGA. Furthermore, it takes no more than 2ms to complete the edge detection of an image with 128×128 pixels.
视觉检测信号的前端处理技术 1、系统地分析了视觉检测算法层次性特点和计算特点,提出了提高视觉检测信号处理速度的基本方案:采用前端处理系统,自动识别被测物体在获取图像中的位置,并将真正有用的被测物体的边缘坐标值,提供给计算机,作进一步的高精度处理; 2、系统研究了实时图像硬件处理的设计基本方法,提出了基于FPGA的视觉检测信号的低级处理算法硬件实现模块化模型; 3、提出了一种新的基于FPGA的模板匹配并行模块化结构,解决了二维图像处理高带宽要求,在几毫秒内就可以在按扫描顺序输入图像中找到检测目标物体的位置; 4、采用FPGA内部的可配置逻辑块实现了128×8移位寄存器的设计,解决了大容量移位寄存器与FPGA内部寄存器数量之间的矛盾,实现了两行图像的延迟。
-
The purpose of this thesis is to design a CMOS Image Sensor which can reduce the area of post-processing buffer memory, caused by pixel output order of raster scan and processing sequence of block-based image processing system does not match, to reduce cost and power consumption.
本论文的目的是设计一局部扫瞄式影像感测晶片,此晶片可以节省因为光栅式扫瞄的像素输出顺序与区块化影像处理系统的处理顺序不匹配而造成的后处理缓冲记忆体面积,以达到减少成本开销与降低功率消耗。
-
The optimal order of hot metal pretreatment is obtained by comparing different powder and order with thermodynamic computation, that is hot metal desulphurization→desiliconization and dephosphorization.
北京科技大学冶金与生态工程学院,北京100083)摘要:通过对不同三脱剂、不同处理顺序的热力学计算比较得出最佳铁水预处理顺序为:预处理脱硫-预处理脱硅、脱磷。
-
In the development of SRFM, through such image processing techniques as linear hue transformation, image liminal division and eliminating noises by adjacent field averaging and such data processing method as high speed data compression as well as arranging the procedure of eliminating noises after image division, the precision and performance of responding in real time are guaranteed.
在系统的研制中,通过综合运用线性灰度变换、图像阈值分割以及邻域平均法滤波等多种图像处理技术和高速数据压缩等数据处理算法,并采用了将滤波环节放在图像分割之后进行的图像处理顺序,保证了系统剔除的准确性和实时性。
-
A manufacturing method for a polarized light film is following: processing the material film (1) of the polyvinyl alcohol resin through the expanding sink (3) as a procedure, processing the material in the dipping sink (4) as a procedure, the dyeing procedure for the dyeing process in the dyeing sink (5) and continuous procedure for the boric acid process in the boric acid sink (6); and processing the single shaft extending for the polarized light film (9) in one procedure at least of the dyeing sink (5) and the boric acid sink (6), the invention processes the polyvinyl alcohol resin film in the direction of the mechanism in the dipping sink (4), which reaches the extending multiplying power above 1.0 fold and below 1.05 folds.
偏振光薄膜的制造方法,使聚乙烯醇系树脂的原料薄膜(1)按顺序通过在膨润槽(3)中的膨润处理工序、在水浸渍槽(4)中的水浸渍处理工序、在染色槽(5)中的染色处理工序以及在硼酸槽(6)中的硼酸处理工序连续进行处理,并且在染色槽(5)以及硼酸槽(6)中的至少一个工序中进行单轴拉伸制造偏振光薄膜(9)时,在水浸渍槽(4)中相对于机械方向处理聚乙烯醇系树脂薄膜,使拉伸倍率达到1倍以上并且在1.05倍以下。
-
A refreshable load module can be replaced by a new copy during execution by a recovery management routine without changing either the sequence or results of processing.
可刷新的装入模块在执行时可由恢复管理例行程序换上新拷贝,而不会改变处理顺序或处理结果。
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。