英语人>网络例句>墩基础 相关的搜索结果
网络例句

墩基础

与 墩基础 相关的网络例句 [注:此内容来源于网络,仅供参考]

At first, the basic theory and general process of the gravity abutment corresponding with definite solution are simply introduced.

然后在随机有限元的基础上进行拱坝的拱座——重力墩的强度和抗滑稳定可靠度分析,计算相应的可靠指标。

In clarifying orthodox Christology, the Council of Chalcedon (A.D. 451) laid the foundation of Western liberty.

在阐释正统基督教神学时,迦克墩会议(公元451年)奠定了西方自由的基础。

To resolve the design difficulties caused by small cross-section, low height of the bridge structure, the key technique problem to the bridge structure should be carried on research and analysis, such as whole calculation model, considering foundation combined action , the reasonable rigidity match to the joint of the girder and pier ,inner force redistribution caused by the system conversion ,the forecast to long-term deformation after building , stress analysis and tectonic steel bar of the anchored serration block , the influence of foundation settlement and anti- earthquake measures . To acquire feasible and reasonable technique parameters and provide the full design basis, according to analytical results adjust and optimize the bridge structure design.

为解决桥梁结构要求截面小,高度低等带来的设计困难,需对该结构的关键技术问题如考虑基础共同作用的整体计算模型、梁墩间的合理刚度匹配、体系转换产生的内力重分布、成桥后的长期变形预测、锚下锯齿块应力分析及配筋构造、基础沉降影响及抗震措施等进行研究分析,以获得技术可行、经济合理的技术参数,为设计提供充分的依据,根据分析结果调整优化桥梁结构设计。

The primary studying works and characteristics:1 To summarize reinforcing theory of cement mixing pile composite foundation2 To analyze the primary mechanics characters and changing rules of cement mixing pile, based on analysis of test data both indoor and outdoor.3 To discuss siding frictional resistance, ending resistance, ultimate bearing capacity of simple mixing pile and effectiveness factor of grouped piles, loading ratio of soil between piles under cushion cap of grouped piles and stress ratio of pile and soil and so on, and use many computation method and experimentation method to ensure bearing capacity of mixing piles composite foundation.4 To point out and analyze eight sides flaws and problems of the bearing capacity calculation method of mixing pile compositefoundation which ensured by national and normative method/ formula.5 To apply test results of loading tests and a few settlement observation data, use gray theory to predicate ultimate bearing capacity of deep mixing piles, actual example demonstrate engaging between theoretical predicted value and actual value.6 To apply groovy layerwise summation method to discuss entity piles method, double foundation method, equivalent layerwise summation method and consolidation theoretical method and so on, especially by combination of engineering example, use FEM to calculate or discuss the settlement and changing rules of composite foundation.7 To discuss problems of critical length of composite foundation by combination of engineering example and numerical analysis method, and analyze the contrast of critical length between simple pile load and most area load of composite foundation, not only critical length of composite foundation is relative to modulus ratio between piles and soil, but also upside load distribution area of composite foundation.

主要的研究工作与特色为:(1)总结了水泥搅拌桩复合地基的加固原理;(2)在对室内外试验资料进行统计分析的基础上,系统分析了搅拌桩水泥土的主要力学特性及其变化规律;(3)探讨了搅拌单桩的侧摩阻力、端阻力、极限承载力及群桩效率系数、群桩承台下桩间土荷载分担比及桩土应力比等,提出用多种计算方法并结合试验方法来综合确定搅拌桩复合地基的承载力;(4)明确指出和分析了按国家有关规范的方法确定搅拌桩复合地基承载力所存在的八个方面的缺陷与问题;(5)利用过去没有加载至破坏阶段的载荷试验成果和较少的沉降观测数据,尝试了用灰色理论预测深层搅拌桩的极限承载力,实例表明理论预测值与实测值吻合较好;(6)在常规分层总和法的基础上,探讨了复合地基沉降计算的实体墩基法、双层地基法、等效作用分层总和法、固结理论法等,特别是结合工程实例,用有限元数值计算等方法计算和讨论了搅拌桩复合地基的沉降及其变化规律;(7)结合工程实例,用数值分析方法探讨了复合地基临界桩长的问题,指出和分析了单桩荷载下的临界桩长与复合地基大面积荷载下的临界桩长存在很大的差别,复合地基的临界桩长不仅与桩土模量比有关,而且与复合地基上部荷载分布面积有关。

Based on the study achievements of some predecessors,bridge,pier and abutment were simulated by solid element,rail and sleeper were simulated by space beam element,the links of rail,sleeper,bridge,pier and abutment were simulated by spring element,a three-dimensional finite element spatial mechanics model for calculating the rupture force between continuously welded rail and high-speed railway bridge was established.

在吸收前人研究成果的基础上,采用实体单元模拟桥梁及桥梁墩台,采用空间梁单元模拟钢轨及轨枕,采用弹簧单元模拟钢轨、轨枕、桥梁与墩台之间的连接,建立了断轨三维有限元空间力学模型。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Also, big and deep foundations for the anchorages were constructed on reclaimed lands with various new technology.

两个主墩建在水深、潮急的设置沉箱基础之上,而两岸庞大的锚碇基础则分别使用了不同的新技术。

Based on the 70 axial force monitoring data on 64 manometers in south tower piles foundation of JiangYin Bridge, the force transferring mechanism of socketed pile group using friction ineffective treatment at the top 20 meters was analyzed.

实践证明,桩周摩擦失效嵌岩桩基础可有效地降低塔墩荷载的作用面,是一种值得在跨越工程中推广的基础方案。

To meet the market development, we manufacture various kinds of fasteners, like stainless steel, brass, aluminium fasteners, car, motorcycle fasteners of GB, ISO, DIN, ANSI, BS and JIS standards, non-standard fasteners are our advantages. We can also provide cold-forged, hot-forged fasteners, hardware stampings which are widely used in the areas of basic project, car fittings, machinery, electricity, furniture, consteuction decoration, traffic facilities and so on.

因市场发展而需求,专门针对网络销售市场,销售各种、ISO、DIN、ANST、BS、JIS所生产的紧固件类产品包括,不锈钢紧固件,铜铝紧固件,汽车紧固件,摩托车紧固件,异型紧固件,各种大型冷墩件,热墩件,各类小五金冲压件,适用于基础工程、汽摩配件,轻工、机械、电力、低压电器、家具,五金工具,建筑装潢,交通设施等。。

第2/4页 首页 < 1 2 3 4 > 尾页
推荐网络例句

As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.

每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。

Maybe they'll disappear into a pothole.

也许他们将在壶穴里消失

But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.

但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。