墙台
- 与 墙台 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
All equipments investments will be lower than old type equipments, truely attain efficiently and consume low a machines to use more, if reach a factory to need one set equipments and then can produce:The turf-grass brick, large road follows a stone, water mill brick, difference type road noodles azulejo, build brick wall brick, eight bore bricks and protect ascent brick, the farmland capital construction and highway two side 1 time's modeling one U type catchment dike, and Yan plank...etc.
6〉全部设备投资要低于老型设备,真正做到高效、低耗一机多用,如构件厂只需一台设备就能生产:草坪砖、大型路沿石、水磨砖、异型路面花砖、砌墙砖、八孔砖、护坡砖、农田基本建设及公路两侧一次性成型U型排水渠、檐板等多种水泥制品。
-
The frame, which is formed by buttress, breast wall and side wall bear the horizontal loads, and group pile cap bears the resultant force of vertical and horizontal loads.
由扶壁、墙、墙组成的框架抵抗水平荷载,而以承台、基抵抗垂直及水平荷载的共同作用力。
-
Over there towards the far end of the wall, are ten hemming machines .
莫罗:那边,在墙的那头,是十台包缝机。
-
The influence of the depth of diaphragm wall-pile cap, the soil properties at pile tip, the distance between diaphragm wall and pile, and the size of pile on the deformation and load transfer of diaphragm wall-pile system are investigated.
并分析了墙桩顶部承台厚度、桩持力层、墙桩净距以及桩截面积等的变化对墙桩荷载分担以及整体变形的影响。
-
Through the comparative analysis of the earth pressure calculated by the different calculation methods, it is known that when the earth pressure behind the abutment of the integral abutment bridge under the action of rising temperatures is calculated, it is not proper to use the m method to calculate the resistance coefficients of the abutment back wall and column earth while the resistance coefficient of the abutment back wall earth can be calculated by the Broms method. It is proper that the resistance coefficients of the earth of the abutment and pier piles should be considered by the p-y curve.
通过对不同方法计算的台后土压力的对比分析,得知:在计算升温引起的整体式桥台桥梁台后土压力时,桥台背墙及台柱土的水平抗力系数计算采用m法是不适合的;桥台背墙后填土的水平抗力系数可采用Broms法计算;土对台桩及墩桩侧的水平抗力系数按p-y曲线来考虑是适合的。
-
A basic panel is manufactured commonly in the size 12 x 2.85m (34.2 m2) on a casting table, which is the production unit for Rapid Wall, and in a large enough size to forman entire wall of a building structure.
一块基准墙板在浇铸台通常作成12 x 2.85m (34.2 m2)的尺寸,是速成墙的生产单位,尺寸大得足够成为一个建筑结构的一面墙。
-
We hope you pay more attention to jobs are as follows haven't been finished this week:(1) right and left side of upper water wall has been aligned and fixed;(2) Nine downcomers been pre-stored;(3) All the wall packing aligned and fixed, then install right and left side rigid beam;(4) Finishing welding counterpart of front wall packing;(5) Get two booster pump for turbine driven boiler feed water pump aligned and make inspection;(6) Electric Feed Water Pump Unit, Coupling and Motor Pump positioned;(7) Equipment in Start-up Boiler House aligned and make inspection;(8) Get three Reusing Water Pump aligned;(9) Equipment in Integrated Water Pump House aligned and make inspection.
本周,以下工作未完成,希望贵单位引起重视:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)2台汽动前置泵找平找正,并验收;(6)电动给水泵组,耦合器和电泵就位;(7)启动锅炉房内设备找平找正,并验收;(8)3台复用水泵就位;(9)综合水泵房内设备找平找正,并验收。
-
Job as follows shall be finished next week:(1) Get right and left side of upper water wall positioned and reinforced;(2) Finish Pre-store nine downcomers;(3) All the wall are positioned and reinforced, and then install right and left side rigid beam;(4) Finish front wall counterpart welding;(5) Hoisting two rare roofs, Middle-temperature RH, four high temperature RH headers, hoist headers of middle-temperature RH and high-temperature RH, it can't install lifting rod.
下周,锅炉以下工作需要完成:(1)上水左右侧找正完,且加固完;(2)下降管9根预存完;(3)包墙全部找正完,加固完,之后安装左右侧刚性梁;(4)前包墙对口焊接完毕;(5)后顶棚吊装2片、中温再热器、高温再热器集箱4个,吊挂中再和高再集箱时,不能安装吊杆。6)2台汽动前置泵找平找正,并验收;(7)电动给水泵组,耦合器和电泵就位;(8)启动锅炉房内设备找平找正,并验收;(9)3台复用水泵就位;(10)综合水泵房内设备找平找正,并验收。
-
Hardware control panel, wall panels, service lights, VOD Taiwan, the Taiwan concert.
硬件有控制面板,墙面板,服务灯,点歌台,演唱台。
-
The tests of shaking table for a building model and anti-shearing of 9 pieces of bearing wall of masonry have been carried out to investigate the effect on results of shaking table test.
通过组合墙片的拟静力试验和模型房屋的振动台试验,分析研究了人工质量模拟对砖混结构振动台试验的作用和影响。
- 推荐网络例句
-
However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.
然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。
-
Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.
镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。
-
A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.
付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。