基础螺栓
- 与 基础螺栓 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Axis positioning buildings, infrastructure and elevation axes, anchor bolt fastening should conform to the specifications and design requirements.
建筑物的定位轴线、基础轴线和标高、地脚螺栓的规格及其紧固应符合设计要求。
-
The casting foundation and the positioning of the anchor bolt should conform to the installation dimensions included in the assembly drawing and the instruction manual of the pump.
根据泵的总图和说明书所提供的安装尺寸浇注基础和确定地脚螺栓的位置。
-
Screw down the bolts, fixup the classis on the concrete foundation.
拧紧 螺栓,将底架固定在混凝土基础块上。
-
With this model, the effects of vertical dynamic resistance on the performance of sliding bearing are deeply explored.
在此基础上,应用这种滑动支座模型,对橡胶支座直接放置于墩顶,与墩顶和梁底的接触面没有螺栓连接,水平力的传递靠接触面的摩擦作用,这种比较常见的桥梁结构形式,做了结构分析,指出其动力性能特点。
-
The bracket and vertical column of cable tray will be installed by welding or expansion bolt of the basement . the welding place treatment will be done by painting .
桥架的立柱、托臂等支架可与基础预埋件焊接固定,也可采用膨胀螺栓固定,对于现场焊接处一定要做好防腐处理,通常由用户现场涂刷防腐漆。
-
Our company solemnly promises: The products provided by our company, such as the bearing plate, net-contact basic prop steel plate built-in fitting; steel plate built-in fitting in protecting the shed of the bridge; gudgeon, screw nut and the back up in protecting the shed of the bridge, all follow strict profession standard regulations in the process of production.
本公司郑重承诺:我方提供的支座板、接触网支柱基础预埋钢板、防落梁预埋钢板、螺栓、螺母及防落梁挡块均严格按照行业标准之规定进行生产,对所供物资的原料采购,生产制造检验、到货服务进行全过程的质量管理。
-
If there is any quality problem during the process of use or the engineering operations of the bearing plate, net-contact basic prop built-in fitting; steel plate built-in fitting in protecting the shed of the bridge; gudgeon, screw nut and the back up in protecting the shed of the bridge, we will send project manager and SP technologists within 48 hours to the spot and get out the sample after receiving your notice.
若使用过程或工程运营过程中发现我单位所供的支座板、接触网支柱基础预埋钢板、防落梁预埋钢板、螺栓、螺母及防落梁挡块存在质量问题,我单位将在收到贵方通知之时起,48小时内派项目负责人和专业技术人员到达现场了解情况并提取样品,经相关检验部门认定为我公司产品质量问题后,由我方承担由此造成的一切直接经济损失,并负相应的法律责任。
-
Research results: The proposals are offered that for ballastless track it should be given priority to lay open latch impressed rail with iron tie plate and spring having bolt, to equip with iron tie plate and single layer or double layers elastic bedding, and to equip with no bed retaining fastenings for sub -rail foundation.
研究结果:提出了无碴轨道宜优先采用带铁垫板的分开式、弹条有螺栓扣压钢轨和铁垫板、单层或双层弹性垫层、轨下基础不设挡肩扣件的建议。
-
Upon final closing movement of the bolt ejectors are cammed down to release fired case and to grip on the base of the fresh cartridge in the chamber.
螺栓后喷射最后结算运动是cammed下释放发射案,抓地力就在会议厅新墨盒的基础。
-
The cementitious grouts mainly applies to anchor bolt、equipment foundation and quadratic grouting of steel structure soleplate, reconstruct and consolidate of concrete structures and aperture grouting of prestressed concrete and concrete structure.
水泥基灌浆材料主要应用于地脚螺栓锚固、设备基础及钢结构柱脚底板的二次灌浆、混凝土结构改造、加固及后张预应力混凝土结构孔道灌浆。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。