坡
- 与 坡 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Superposition of geographic information of the digital elevation model and maps of landscape genres is weighed to mirror the spatial distribution of the plant communities at different slops, aspects and position.
利用数字化地形模型与景观类型图进行地理信息叠加,以定量化地反映主要群落在不同坡度、坡向以及坡位的空间分布,获得各群落的分布结构,数量化研究地形因素与植被分布的关系。
-
Combined with the excavation blasting work of the left-bank abutment slope of Jingping Hydro-power station cascade-Ⅰ, the dynamic properties of slope under blasting vibration is analyzed. The advantages and disadvantages of different excavation methods are compared, which offers a reference for the engineering practices.
结合锦屏一级水电站左岸坝肩槽高边坡爆破开挖,分析了该工程边坡在爆破震动荷载作用下的动力特性,并比较了不同爆破方案的优劣,为工程实践提供了参考和依据。
-
The selection of neutral-point earthing ways of the hydrogenerator of left-bank power station in the Three Gorges Project should be related to one-point earthing protection of the stator of its generator within one hundred percent framework.
三峡船闸高边坡,因地应力释放、渗流条件变化和岩石徐变,使岩坡产生缓慢位移,改变了人字门的支承条件,从而影响到人字门的正常工作。
-
Secondary stress field resulting from valley cutting is basically symmetric about the valley central line hut not of axial symmetry . From top to foot of valley wall , the tangent stress and the width of high tangent stress zone get gradually big , reaching maximum at the valley botton .
沟谷的下切形成的二次应力场除了关于沟谷中线基本对称外,不具备轴对称特征,从坡顶到坡角,切应力高值区内切应力量级和高值区的宽度逐渐增大,在沟谷正下方达到最大,甚至有可能突然增大。
-
The experts and scholars launched many-faceted and many-subjected research against the banpo relics on the base of archaeology survey and excavation work.
在半坡遗址的考古勘查与发掘工作基础上,专家学者展开了对半坡遗址多方面、多学科的研究工作。
-
On the basis of the analysis of the natural engineer characteristics in physical mechanics,the stability of the sections is computed,furthermore the mechanisms to deal with the marlstone slope geological disaster are established,to make out what administer projects for the slope should be taken.
在对高切坡的物理力学性质一般分析的基础上,确定稳定性分析有关模量,进行定量分析计算,并进一步确定高切坡的加固防护措施。
-
The length of expansive soils and rocks ditch part of the Mid-line Water transfer from South to North is 340 km, so the disposal technique, analysis methods and the long term stability of ditch slope are the key problems.
膨胀土具有胀缩性、裂隙性、超固结性,其工程性质特殊,即使很缓的边坡也可能失稳,南水北调中线工程膨胀岩土渠段长达340km,渠坡的处理技术、分析方法与长期稳定性是关键问题。
-
At the mean time, for P2 and P3 instrumentation points which located at the depth of 2.5 m below the mid-slope surface and at the depth of 3 m below the slope top respectively, the pressure head remain negative and this indicates both points are still situated at the unsaturated zone in between the soaking line and groundwater table.
在此同时,P2监测点(坡面中点下方2.5 m)及P3监测点(坡顶下方3 m)之压力水头则仍维持负值,此显示两监测点周围区域仍处於浸润线与地下水水位线间之未饱和区。
-
From 1998 to 2000, soil moistures were measured every April to October by using TDR sys...
沟坡则较差,但沿沟坡向下到沟底,土壤水分不断增加,分别为 6 。3%、6 。4 %和 10 。4 %。
-
In the rock-soil engineering, the soil pressure caused by slope excavation is very complicate .It not only withes pays to the reinforced structure displacement, stiffness and geological condition, but also related with the excavation method.
岩土工程中,边坡因开挖坡脚岩土体所产生的作用于支挡结构上的土压力情况复杂,它不仅与支护结构位移、刚度和岩土体地质条件相关,而且还在很大程度上取决于施工方法。
- 推荐网络例句
-
However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.
然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。
-
Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.
镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。
-
A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.
付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。