坝
- 与 坝 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
A brief discussion on seismic design of high arch dams is made through the following three aspects:interaction of arch dams-foundation-reservoir water,dynamic stability of high arch dam abutment ,effect of transverse slots on seismic design of high arch dam,and those aspects referred to above is not enough for seismic design of high arch dam.
对高拱坝的抗震设计进行了分析,包括拱坝坝体-地基-库水动力相互作用分析、高拱坝坝肩抗震稳定分析、横缝对高拱坝抗震设计的影响,仅对高拱坝抗震设计研究的几个方面进行了概括总结。
-
The unstable rock body with syncline structure on the right abutment of Danjiang arch dam are analyzed under the thrust from arch dam.
单江拱坝右坝肩存在一个向斜岩体结构,在拱坝推力作用下,有可能滑动破坏。
-
Arch dam, which is fastened to the base rock, is a high_order, hyperstatic, spacial body case structure. It has not only arch function but also girder function, but its main loads are passed to each dam abutment by means of arch function.
拱坝是固结于基岩的高次超静定空间壳体结构,既有拱作用又有梁作用,其主要荷载是通过拱的作用传到两岸坝端。
-
Arch dam, which is fastened to the base rock, is a high_order, hyperstatic, spacial body case structure. It has not only arch function but also girder function, but its main loads are passed to each dam abutment by means of arch function.
拱坝是固结于基岩的高次超静定空间壳体结构,既有拱作用又有梁作用,其主要荷载是通过拱的作用传到两岸坝肩。
-
The final solution will be to set two current blocking piers of 10 m and 18.5 m high respectively at stake 20+151m and 20+300m on the scour-resistant wall and an apron of 200m wide and 50m long starting from the dam toe and close to the cofferdam.
试验结果表明:护坦减轻了下游纵向围堰左侧坝趾处的回流淘刷,隔流墩明显减轻了防冲墙附近河床的冲刷,确保了坝基和下游纵向围堰的安全。
-
The numerical simulation of reservoir shows that the remaining oil was distributed in the middleupper point bar.
数值模拟结果显示,剩余油主要富集在点坝中上部。
-
The research area is delta front aggradation controlled by North-West headstream, There are three kinds of sedimentary microfacies in research area, including underwater distributive river course, estuarine bar and distributive bay.
研究区为东北物源控制下形成的三角洲前缘沉积,主要发育水下分流河道、河口坝、分流间湾等微相类型,骨架砂体以水下分流河道微相为主,它是研究区最主要的储集体。
-
The paper introduces new construction methods for mixed pond of red mud from Bayer process and red mud from Sintering process and compares it with"dry process"and "wet process"ponds.
介绍了一种将拜耳法赤泥与烧结法赤泥混合堆坝的新型筑坝方案,并将此筑坝方案与一般的&干法&和&湿法&筑坝方案进行比较,评价各种不同方案的特点。
-
The shaking table model tests of dam section of sand-draining section, power section, water retaining section and overflow section were described in the 4 chapter.The influences of hydrostatic pressure and rolled bedding fault were considered for the tests.
采用仿真混凝土,对金安桥碾压混凝土重力坝的排砂坝段、发电引水坝段、挡水坝段和溢流坝段进行动力模型破坏试验,试验中考虑了静水压力和碾压层的影响,对该坝的动力破坏位置和抗震性能进行了评价。
-
The relation among the sedimentary microfacies, the reservoir physical property, and the distribution of oil/gas are analysed, and it is shown that the favorable place for petroleum accumulation is the sandbody to submerged branch channel and distributary mouth bar in braided\|river delta front.
在此基础上,剖析了沉积微相与储层物性、油气分布的关系,指出水下分流河道和河口坝微相砂体为该区有利的油气聚集区。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力