坝
- 与 坝 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
As for the excavation of the sand-gravel zones,except the toe slab and its 1/9 bottom width down stream,the alluvial layers are excavated to the micro-weathered rocks,while the other sections remain unexcavated.
闸门利用水力和杠杆原理实现自控关闭;闸坝平时挡水发电,洪水期自动翻倒泄洪冲砂,有效地解决洪水对上游库区实物的淹没损失及水库泥沙淤积问题;闸坝采用地下混凝土连续墙进行地基防渗处理及面流消能,消能效果显著,工程投资少。
-
With the presented methods, the settlement and stability of an extended landfill in Hangzhou are analyzed systematically. Geomembranes and liner system between the extended landfill and the old one especially above the toe of the old dam are probable failure places due to ununiform settlement. Some suggestions about the design of liner systems are also put forward in this thesis.
本文利用上述方法,比较系统而全面地分析了杭州某填埋场扩建工程的沉降和稳定问题,指出原填埋场和扩建部分的交界面尤其是原垃圾坝坝底上方为土工膜及覆盖系统容易破坏的地方,并提出了关于衬垫等系统设计方面的建议。
-
Based on systematic analysis of various desilting methods by using existing reservoirs, the paper puts forward an overall thinking of desilting system of auto-suction pipe of the Xiaolangdi Reservoir, i.e. to automatically discharge the deposited fine sands within about 40 km area in foreside of the dam through dam tunnel or tunnel on the right bank of mountain by placing a removable and lengthable pipe equipped with a suction head in the near dam section of the reservoir area.It can discharge 300 million tons sediment each year by preliminary estimation.
在系统分析已建水库各种排沙方式的基础上,提出了小浪底水库自吸式管道排沙系统总体思路,即利用水库自然水头,在近坝段库区内铺设可移动并带有吸泥头、可逐渐加长的管道,自动地将坝前约40 km范围内淤积的细颗粒泥沙和通过过坝隧洞或右岸山体内的隧洞排出库外,初步估算每年可排出泥沙3亿t。
-
Based on core datum,logging informations,seismic datum and geological datum,the author constructs the sedimentary mode of Chang 61 in the area and compartmentalizes five microfacies including subaqueous distributary channel,interd...
以岩心资料、测井资料、地质资料为基础,结合沉积物粒度分析、岩心观察、取心井岩性和砂体分布特征,建立了吴旗地区长61储层的沉积相模式,并将沉积微相细分为水下分流河道、分流间、远砂坝、席状砂、河口坝5种微相类型。
-
The complex characteristics of velocity and water elevation changes at both banks of the curved sections, auto-reassignment of discharges and momentum as well as vortices and super-elevation near the corner of embranchment regions in the furcated channels are displayed. The effects of wetting bed and drying bed are discussed simultaneously.
首次针对180°强弯曲河道、90°双支以及45°三支分叉渠道,数值预报了溃坝波的演进过程,揭示了溃坝波在弯曲河道中内外两岸速度与水位变化,在分叉河道中自动进行流量与动量再分配,在叉点角区形成旋涡、壅高等复杂运动特征,同时反映了湿底与干底的影响。
-
The aims of this study are to investigate in depth the static and dynamic analytical methods for high rockfill dams on deep overburdens, especially the methods of how to dispose of the deep overburden and the interaction of the damreservoir-foundation system, of reasonable excitation means of the earthquake acting on the computational model, of artificial transmitting boundary in dynamic analysis, etc.
本课题研究的目的在于深入探讨深覆盖层上高土石坝的静、动力分析方法,特别是坝—地基相互作用中深覆盖层地基的考虑方式,以及针对深覆盖层上高土石坝的动力分析提出一种较为合理的地震动输入方式和在坝—地基系统的有限截断模型中引入恰当的人工边界等问题。
-
Dongpinghu Reservoir is located in the congregation of Dongping, Liangshan and Wenshang of Shangdong province or connected section of withed part to narrow part in yellow river down reach. The reservoir was built in 1958, it was expanded on the basis of the natural like. The reservoir consists of bounded bank, secondary lake bank, segregate intake gate. The perimeter of bank is 88. 3km, and it was constructed in later 1950's.
中文题名东平湖水库围坝东段渗流控制研究副题名外文题名 Study on controlling permeability of east dam in Dongpinghu reservoir 论文作者余强导师佴磊教授学科专业地质工程研究领域\研究方向工程地质学位级别博士学位授予单位吉林大学学位授予日期2002 论文页码总数97页关键词水库围坝渗流控制防渗处理馆藏号BSLW /2003 /TV697 /1 东平湖水库座落在山东省东平、梁山、汶上三个县的交界处,位于黄河下游宽河道与窄河道的过渡段上。
-
Moreover, based on routine research method on abutment stability, non-linear finite element iteration method is put forward in this paper, which is applied in the analysis of abutment stability of Shuanghe arch dam successfully at the same time.
此外,本文在前人研究的常规坝肩稳定分析方法的基础上,提出了非线性有限元迭代解法,并应用于双河拱坝坝肩稳定分析。
-
This paper investigates the favourable impact of the central dumping during high arch dam abutment excavation on river closure.
分析了高拱坝坝肩开挖施工过程中产生的集中堆渣对河道截流的有利影响,提出了坝肩附近集中堆渣能降低截流戗堤龙口水力参数需具备的水力控制条件。
-
In this paper rigid block limitting equilibrium method is used to calculated Xiluodu arch dam abutment stability and the abutment stability is analysed and assessed.
采用刚体极限平衡法对溪洛渡拱坝坝肩稳定进行了全面计算,对坝肩稳定进行了分析评价。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力