地下隧道
- 与 地下隧道 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
From the aeolotropy of hard rock of tunnel engineering region, the stress distribution of several kinds of fault to the water gushing of tunnel, the type of geology disaster involved in macrocharacter, main control factors, disaster mechanism and control strategy in tunnel excavating are studied systematically in this thesis. The purpose is to establish a theory and technology method for forecast and decrease disaster in tunnel excavating.
本文以硬岩隧道开挖工程区域岩体的各向异性研究为起点,从不同类型断层为主要构造形迹的应力分布特征出发,并结合隧道地下涌水灾害,系统研究隧道开挖的地质灾害类型,以宏观表象、主控因素、灾害机制及防治对策为主要研究内容,全面深入研究旨在为隧道开挖期间防灾、减灾提供理论基础与技术路线。
-
A reciprocal FEM analogue method is brought forward, by means of taking into account the interaction of tunneling, the peripheral soil and underground utilities. And the calculating program, DLFEA-TPR, is developed to calculate the tunneling-induced deformation and stress of adjacent utilities.
考虑隧道开挖与周围土体以及地下管线的相互作用,提出了相应有限元模拟方法,开发了隧道施工引起邻近地下管线变形及应力的计算程序DLFEA—TPR。
-
Took Chongqing Gong-he tunnel as an engineering example and studied the failure mechanism of surrounding rock and the correlation with bolt support system by using the methods of theoretical analysis, modeling test, numerical simulation and in situ test, some helpful conclusions were arrived as follows.Firstly, a new failure criterion for transversely isotropic rock mass was proposed with consideration of bedding plane orientation and major principal stress, and the corresponding algorithm, arrived through VC++6.0, can be easily embedded into the software FLAC3D for the geotechnical calculation.
论文在国家自然科学基金专项基金创新群体基金项目(No.50621403)以及国家自然科学基金重点项目"隧道与地下空间工程结构物的稳定性与可靠性(No.50334060)"的资助下,以共和隧道为示范工程,运用理论分析、物理模型实验、数值模拟和现场测试等手段,对共和隧道大埋深段层状岩体的围岩变形破坏机理、锚杆支护力学效应及围岩-支护结构的变形特征等内容进行了研究,其主要研究成果有:①在总结和探讨国内外学者提出的层状岩体经验型连续介质破坏准则基础上,结合层状岩体力学特性,考虑层面方向和最大主应力方向两个影响因素,提出了共和隧道层状岩体横观各向同性破坏准则;采用汇编语言VC++6.0实现了横观各向同性弹塑性本构关系的算法,并嵌入FLAC3D有限差分数值分析软件接口中实现数值运算。
-
In this paper we combining connecting tunnel project of Subway Line 4 at Xidan-lingjing bystreet in Beijing. To aim at the difficulties of building large-span connecting tunnels in the fine sand layer, through roads and underground pipelines, construction nearby buildings and other project difficulties. Using theoretical analysis, numerical simulation, field tests and other research methods to comprehensive and systemic research the stratum deformation mechanism and process control techniques of shallow excavation method, and a series of results were obtained. Firstly, use the stochastic media theory to analyze the stratum deformation mechanism, concretely analyze the analytic equation of surface horizontal displacement and deformation which were caused by the excavation of single-hole and double-hole tunnel, and further discussion on ground settlement, vertical deformation, surface horizontal displacement and horizontal deformation. Analyzing the main influence factors of surface displacement, and combined with practical work to proof the theory which was applied to shallow buried single-hole tunnel in fine sand layer was scientific.
本文结合北京地铁四号线西单~灵境胡同渡线隧道工程,针对在粉细砂地层中修建大跨渡线隧道,下穿道路和地下管线,临近建筑物施工等工程难点,利用理论分析、数值模拟、和现场监测等多种研究手段,对浅埋暗挖隧道地层变位机理及控制技术,深入地进行全面和系统的研究,并取得以下成果:(1)引入随机介质理论,对地层变位机理进行了分析,具体分析了单、双孔隧道开挖引起的地表位移及变形的解析方程,并深入探讨了地表沉降、垂直变形、地表水平位移和水平变形的特点,同时分析了影响地表位移的主要因素,并结合工程实例,佐证该理论应用于粉细砂地层浅埋暗挖单孔地铁隧道的科学性。
-
On the basis of the knowledge highway's ruin of the past, in high earthquake intensity area of highway, underground structure may be fall into ruin for the seismic motion, especially, the entrance of tunnel is the weakest of the tunnel. As based on the soil-structure interaction model, adopting the soft of FLAC3D and numerical analysis method, the tunnel entrance has been computed by the elastic and plastic method, the results obtained are discussed and the measures for design and solution are presented.
根据以往的受震破坏经验,在公路隧道的高烈度地震带,地下工程可能会遭受严重震害,尤其洞口段为抗震薄弱区,本文采用FLAC3D软件,从土-结构相互作用模型出发,运用数值分析方法对隧道洞口段进行了三维弹性和弹塑性分析,得出了相应结论,并对结果进行分析,指出隧道抗减震设计中应注意的事项,并提出相应解决措施。
-
Excavations as well as utilization of urban underground space put forward a higher demand for tunnel and underground engineering in quantity, quality and technology, along with the development of economy, science and technology.
21世纪是地下空间的世纪,随着科学技术和经济的发展,交通、水利、水电、采掘和城市地下空间的利用等对隧道和地下工程的数量、质量和难度上提出了更高的要求。
-
Set my factory product development, manufacturing and sale of products and services in one, through the introduction, absorption, development, innovation, use of professional and technical production of self-drilling hollow grouting anchor series products and dedicated supporting machinery (latent air drilling, rock drill , grouting machines, jet injection pump, bolt, etc.) are widely used in underground engineering (transport tunnels, hydraulic tunnels, mines and various uses of roadway anchor bolting) geotechnical engineering (slope, rock embankment , deep foundation pit of the anchor) to repair reinforcement works (tunnels, sea walls, dams, housing construction).
我厂集产品开发,生产制造及产品销售与服务于一体,通过引进,吸收,开发,创新,采用专业技术生产的自钻式中空注浆锚杆系列产品及专用配套机械(潜空钻,凿岩机,注浆机,喷射机,注浆泵,锚杆机等)广泛应用于地下工程(交通隧道,水工隧道,矿山巷道和各类用途的锚固支护)岩土工程(边坡,堤岩,深基坑的锚固支护)修复加固工程(隧道,海堤,大坝,房屋建筑)。
-
Shield Tunnelling Method is a way which uses the shield machine to perform driving,mucking,segment lining assembling and back grouting while controlling the excavation face and surrounding rock without occurence of collapsing,destabilization and disturbing.
1引言隧道盾构法施工,因其先进的施工工艺和不断完善的施工技术,使得其在城市地下空间的开发中取得了巨大成功,如城市地铁、公路隧道、跨海隧道的建设及城市市政管道的改造等。
-
On basis of the features of Yuanliangshan tunnel, jet ventilation technology has been successfully used in the construction of the tunnel and the calculation method for the air volumes of construction jet ventilations are improved. The calculation method for the air volumes of construction jet ventilations is not only suitable for gas tunnels consisting of twin tubes, but also suitable for long tunnels with ancillary adits and large-scale underground structures.
在圆梁山隧道的施工通风中,结合该隧道特点,成功实施了射流通风技术,并进一步完善形成了施工射流通风的风量方法,该方法不仅适用于有平行双孔的瓦斯隧道,同时也可在有辅助坑道的长大隧道或者大规模地下空间的施工通风中推广应用。
-
That means that we take maximum settlement value as an objective value, that is, to control surface settlement is to control pipeline deformation. Its research paths are to make decision of computational method of maximum surface settlement and settlement pattern firstly; then to establish the relationship between maximum surface settlement and ground pipeline deformation and strain, to get maximum surface settlement in term of th
研究思路是:首先要搞清楚地表沉降的规律以及地表最大沉降值的计算方法:然后研究地表最大沉降值W.x与地下管线的变形及应变的关系,从而可以根据管线与隧道的相对位置、地层条件、管线的允许变形情况求出w皿厂这样通过控制地表最大沉降值w删x就可以间接控制隧道工程对地下管线的影响。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力