英语人>网络例句>在下方的 相关的搜索结果
网络例句

在下方的

与 在下方的 相关的网络例句 [注:此内容来源于网络,仅供参考]

According to the Law of Biot-Savart, the author concludes that there is an electric current which can distort the diurnal variations of the geomagnetic vertical component beneath the boundary line of the geomagnetic low-point displacement within and in the vicinity of the day of the geomagnetic low-point displacement anomalous.

作者依据Biot-Savart定律推测,在低点位移异常期间,在低点位移线下方有一引起地磁垂直分量日变化畸变的电流通过,且该电流为线状分布,或仅在垂直面内有分布,埋深一般认为几十千米。

Top-secret tips: devil in the most general false bottom and the top of a two, about 50% of the chances to start the task after the NPC to the bottom of a test, if not false, then try to test the two.

绝密提示:一般假魔王在最下方两个和最顶上一个,大约50%的机率,开始任务之后,先试NPC下方一个,如果不是假的,那就尽量先试两头的。

ABSTRACT:OBJECTIVETo study the correlation between anatomic structure of the inferior alveolar nerve canal and dental implantation by measuring mandible innervation esemplarsMETHODSThe intramandibular course of mandibular canal and its dimendion were measured in 15 mandibles with teeth; the relationship between blood vessel and nerve was observed in 5 fresh samples in which the artery was filled; and then the data were analyzed by statisticsRESULTSThe mandibular canal was close to the lingual side and the inferior margin of the mandible, the mandibular canal and the 10mm underside of mandible were parallel in the region of the first and the second molars, it runned outboard to genal aperture when it was hereabout genal aperture, and the blood vessel lay above nerve in the mandibular canalCONCLUSIONIn implant operation performed according to normal anatomy, injury to inferior alveolar nerve may be avoided.

[目的]探讨下颌管的解剖结构与牙种植的关系[方法]选取15具牙列完整的成人离体下颌骨标本和5具经过动脉血管内灌注的新鲜标本,测量下颌骨在每个牙位截面上有关牙槽嵴及下颌管的相关数据,进行统计学分析[结果]牙槽嵴顶以及下方10mm宽度由前向后逐渐增宽;牙槽嵴由上向下逐渐增宽;下颌管位于下颌骨体内下方走行中偏舌侧,并近下颌骨下缘,在下颌第1,2磨牙区下颌管走行与下颌下缘成平行状,在近颏孔处转向外和向颊侧出颏孔;下颌管内血管位于下牙槽神经之上[结论]牙种植术中按正常解剖部位并且侧重颊侧骨板操作,可避免损伤下牙槽神经;如果术中下颌管内突然涌出大量新鲜血液,则提示若继续手术可能损伤下牙槽神经。

ABSTRACT:OBJECTIVETo study the correlation between anatomic structure of the inferior alveolar nerve canal and dental implantation by measuring mandible innervation esemplarsMETHODS The intramandibular course of mandibular canal and its dimendion were measured in 15 mandibles with teeth; the relationship between blood vessel and nerve was observed in 5 fresh samples in which the artery was filled; and then the data were analyzed by statisticsRESULTSThe mandibular canal was close to the lingual side and the inferior margin of the mandible, the mandibular canal and the 10mm underside of mandible were parallel in the region of the first and the second molars, it runned outboard to genal aperture when it was hereabout genal aperture, and the blood vessel lay above nerve in the mandibular canalCONCLUSIONIn implant operation performed according to normal anatomy, injury to inferior alveolar nerve may be avoided.

[目的]探讨下颌管的解剖结构与牙种植的关系[方法]选取15具牙列完整的成人离体下颌骨标本和5具经过动脉血管内灌注的新鲜标本,测量下颌骨在每个牙位截面上有关牙槽嵴及下颌管的相关数据,进行统计学分析[结果]牙槽嵴顶以及下方10mm宽度由前向后逐渐增宽;牙槽嵴由上向下逐渐增宽;下颌管位于下颌骨体内下方走行中偏舌侧,并近下颌骨下缘,在下颌第1,2磨牙区下颌管走行与下颌下缘成平行状,在近颏孔处转向外和向颊侧出颏孔;下颌管内血管位于下牙槽神经之上[结论]牙种植术中按正常解剖部位并且侧重颊侧骨板操作,可避免损伤下牙槽神经;如果术中下颌管内突然涌出大量新鲜血液,则提示若继续手术可能损伤下牙槽神经。

It can reach the submaxilla edge in part of old people; The bottom forms one curve following the eye lower eyelid; The medial terminal line is nasolabial; The lateral terminal line is from the junct of malar bone and malar arch to the angulus oris inferolateral or submaxilla edge.

皮下脂肪有一个近似三角形增厚的区域,三角形的尖位于口角外下方,约平下颌角平面,在部分老年人可达下颌缘;底部沿眶下缘呈一弧线;内侧界为鼻唇沟;外侧界从颧骨和颧弓交界到达口角外下方或下颌缘。

A machine component comprising: an elongated base plate with side edges, a linear actuator assembly having two parts which can move away from and toward each other, first mounting means on said base plate, said mounting means supporting one part of said assembly, a slide plate rectangular in cross-section and having parallel straight side edges, two elongated guide members each having a rectangular slot adapted to slidingly receive the edge of the slide plate, each elongated guide member including a lowerpart and an upper part and means for securing them together, the lower part having means for attachment to the base plate, said rectangular slot having (1) a first side wall adjacent to and parallel with the base plate, said first side wall being definedby a surface of said lower part,(2) a second side wall defined by a surface of said upper part, and (3) a bottom wall defined by a surface of one of said upper and lower parts, the upper and lower parts having oblique mating surfaces such thatlongitudinal meovement of one part with respect to the other causes the parts to separate from or approach each other in a manner to change the width of said slot, and second mounting means establishing a connection between the slide plate and the other part of said assembly.

有一长条形底座与身边的边缘,一个线性驱动器装配有两个部分,可以离开,彼此之间,首批意味着在说底座、说安装方式支持之一说总成,一个矩形截面板、平行直边棱、两种细长的引导会员都有一个矩形槽适应slidingly收到边缘的细长板,每一个lowerpart引导会员包括一个上方和手段,确保他们在一起,下方附件的方式,在底座,说矩形槽有(1)第一次侧墙毗邻,平行底座,一边说:definedby墙表面说下方,(2)第二次侧墙表面的定义,并说上方(3)底壁由一个表面的上部和下部零件,说上部和下部阀部件表面的thatlongitudinal拥有斜meovement这样的一部分的原因部分可以分离或接近对方的方式来改变宽度的槽,第二次安装方式,建立连接板之间,另一部分说总成。

Underneath the monster, he looks up to see two steel orbs hanging suggestively below and radios his location:"I am beneath the target's scrotum."

站在这个大怪物的下方,他抬头看了看大力神胯下那两个巨大的铁球,说道:&我正在这个怪物的阴囊下方&

During skeleton steel erection, a tightly planked temporary floor will be maintained within two stories or 30 feet (9.144 meters), whichever is less, below and directly under that portion of each tier of beams on which any work is being performed.

在主框架安装期间,在每层有人工作的梁下方或紧贴着梁的下方,两层或 30 英尺(9.144 米)之内,选低者,则要保持有一个密铺的临时平台。

The invention discloses an apparatus of high pressure collecting hardened concrete solution in hole which is consisted of a cylinder body, a piston moving up-and -down in the cylinder body, under the piston, sealing gasket cooperating hermetically with the cylinder body, a brace table under the cylinder body, and a endless displacement tank on the edge of the cylinder body formed by which and the brace table, which linking to solution in hole collecting device by tubing guide.

本发明公开了一种高压收集硬化混凝土孔溶液的装置,包括一个缸体和一个可在缸体内上下运动的活塞,在所述活塞下方设有与所述缸体密封配合的密封垫片,所述缸体下方设有一支撑台,所述缸体与所述支撑台在所述缸体内径边缘形成一环状排液槽,所述环状排液槽通过导流管与孔溶液收集装置相连。

In such cases, provision should be made to always vent above flood level or for a pit drain to ensure an adequate air gap below the relief port.

如果要在坑内更换,则应该采取措施保证排放总是在地面上。或者,对于坑内排放,确保在安全阀下方配置适当的气隙。

第21/44页 首页 < ... 17 18 19 20 21 22 23 24 25 ... > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力