英语人>网络例句>后平衡 相关的搜索结果
网络例句

后平衡

与 后平衡 相关的网络例句 [注:此内容来源于网络,仅供参考]

In case of rear wheel drive and four wheel drive vehicles drive train vibrations can be reduced by balancing the flange of the rear axle differential to give more driving comfort and an improved life of the vehicle .

如果能够平衡后轴法兰,就能减少后轮驱动以及四轮驱动车辆驱动部分的振动,并能不同程度增加驾驶舒适性,延长车辆寿命。

Methods:To study the changes of contour stresses acted on the rectangle of body system based on the evolution from four-footed animals standing to two-footed human body standing.

脊柱的结构与运动是按平行四边形的轮廓应力达到平衡的。根据Wloff定律,颈曲和腰曲是人类站立后,在平行四边形数学定律作用下形成。

This car with the most advanced physical testing equipment in domestic and abroad and the most effective and convenient method to examine nationals physical conditions. After the test of height, weight, quality of endurance, body composition, power quality, balance and bone density, a physical test report with "exercise prescription" are soon printed from a computer.

国民体质检测车配有目前国内外最先进的体质检测设备,以最有效、最便捷的检测方法对国民体质进行检测,经过身高、体重、耐力素质、身体成分、力量素质、平衡能力、骨密度测试后,一张体质检测结果报告很快就从电脑中打了出来,运动处方也一并开出,坐诊专家还根据每个人的实际情况,列出适合的运动项目。

In the reference, through its thermal balance test, the electric furnace production of heat loss part of yellow phosphorus (transformer, short nets, cover, shell) of the total energy consumption of 10 to 13, 8%, their number is not small.

在有关的参考文献中,通过对其热平衡进行测试后,电炉黄磷生产中热损失部分(变压器、短网、炉盖、炉壳)占总能耗的10~13 、 8 %,其数量不小。

In the reference, through its thermal balance test, the furnace heat loss part of yellow phosphorus production (transformer, short nets, cover, shell) of the total energy consumption of 10 to 13, 8%, their number is not small.

在有关的参考文献中,通过对其热平衡进行测试后,电炉黄磷生产中热损失部分(变压器、短网、炉盖、炉壳)占总能耗的 10~13 、 8 %,其数量不小。

In the references, through its thermal balance test, the furnace heat loss part of yellow phosphorus production (transformer, short nets, cover, shell) in the total energy consumption of 10 to 13, 8%, their number is not small.

在有关的参考文献中,通过对其热平衡进行测试后,电炉黄磷生产中热损失部分(变压器、短网、炉盖、炉壳)占总能耗的10~13 、 8 %,其数量不小。

Introduced the analysis and processing of a transformer with three-phase winding of DC resistance imbalanced defect,through further analysis of the after processed DC resistance,believed the transformer still existing the polarity selector"-" side contact deficiency,further on finding out the method of comparing corresponding DC resistance difference rate at each tap has the advantage to detect the polarity selector defect more accurately more sensitively and more directly.

对一台变压器出现三相绕组直流电阻不平衡缺陷的分析和处理情况做了介绍;通过对处理后直流电阻的进一步分析认为,该变压器还存在极性选择开关&-&向侧仍有接触不良方面的缺陷,遂进一步提出,如采用比较各对应分接位置下直流电阻差率的方法能够有更准确、灵敏、直接地发现极性选择器方面缺陷的优点;还提出了测试变压器绕组直流电阻时的几点注意事项。

The exact solution for unlimited long strip plane membrane is obtained by analytical method,and discussed with the approximate solution by energy method.

在垂直于板的载荷作用下,平衡方程为σx2wx2+σy2wy2+2τ2wxy=qh[2]。这个方程虽然是在变形后建立的,但载荷的大小和方向是不变的。

The simulating models about the change of soil water content under plastic mulch were established by analysing the changes of soil water balance after mulching.

通过分析地膜覆盖后土壤水分平衡的变化特点,建立了地膜覆盖前后农田土壤湿度变化的模拟方程。

Then after closure, taking steel perimeter beam and perimeter beam rail as slip base, in order of symmetrical balance, hoisting each steel "leaf" respectively up to the installation platforming of steel leaf, again by utilizing the steel perimeter beam, perimeter beam rail and hydraulic thrusting slip equipment, performing the installation for the eight steel leaves until they are closed together.

施工中采用了&一点吊装、平面滑移&的技术进行安装,即采取同一固定点吊装,先将分段钢环梁利用环梁轨道和液压顶推设备滑移,分段逐步滑移和顶推、逐步拼接,直至钢环梁合拢。将合拢后的钢环梁和环梁轨道作为滑移底座,按对称、平衡的顺序将每片钢叶瓣分别吊装至安装平台上,再次利用钢环梁、环梁轨道和液压顶推滑移设备,将8片钢叶瓣逐步安装到位。

第38/40页 首页 < ... 32 33 34 35 36 37 38 39 40 > 尾页
推荐网络例句

John Robbins lives with his family in Santa Cruz, California.

约翰罗宾和家人居住在加利福尼亚州的圣克鲁斯县。

The international background is mainly the economic ties among different nations tented to be widen and deepen at the peace and development times.

国际背景主要是和平与发展时代条件下的世界各国经济贸易联系的日益加深。

Brian:Ever since I met you, I've been undercover. I'm a cop.

布莱恩:自从我遇见你开始,我就是卧底,我是警察。