后坡
- 与 后坡 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Simulation results verify that insulated board can effectively protect the heat from transferring into the foundations, and the frozen table is always around the lower bottom of the boards; the position of the frozen table with insulated boards is higher than that of without; the embank- ment formation has a better effect on the center of embankment, the shoulder and toe of the roads than others; after consideration of the construction effect, the best lay out of the insulated boards is higher than the position of natural ground surface to 0.3-0.6 m; this formation of the embankments is the right effective constructer to be used in the permafrost on the Qinghai-Tibet railway.
通过数值模拟可知:保温板能够有效地阻止热量由路基面向下传入地基中,使0℃等温线始终在保温板底层;复合路基多年冻土上限的位置要比无保温板时的高;该结构形式对路基中心、路肩和坡脚下的多年冻土上限抬升的综合效果更好;考虑施工条件后,复合路基在保温板铺设距离天然地面之上0.3~0.6 m对于路基稳定性最为有利;该路基结构形式为青藏铁路多年冻土区路基的理想结构形式,有利于克服全球变暖的影响。
-
Irenaeus, an Apostolic Father and the Bishop of Leon, was the student of Polycarp and also died for the Lord.
爱任纽,教父和里昂主教,是坡旅甲的学生,后为主殉道。
-
Interrupting a fireball being cast by the Ymirjar Flamebearers in normal and heroic Pit of Saron will no longer make them instantly cast Hellfire.
普通/英雄难度的萨隆之渊中Ymirjar Flamebearers(2王3王之间坡上的怪物)的火球术被打断后不再导致他们立刻施放地狱烈焰。
-
At 2 a.m., after a five-hour flight from Taupo, the Squirrel soared over the southern tip of the New Zealand mainland and out into the darkness.
凌晨两点,松鼠直升机从塔坡出发飞行五小时后,到达新西兰大陆的最南端,进入了黑暗。
-
The DTM for automatic-design of thruway was put forward by Prof. Miller in 1956. Since then , the DEM is used for design of various circuit diagram, and for account of area, cubage, gradient of various project, and for estimating visibility from point to point; for rendering contour, grade-graph, aspect-graph, solid model; for making orthographic image and repair map in the Topography; for assistant data to classify in the Remote Sensing; as basic data in the GIS, for analysis and layout actuality of using soil, for disaster prediction; for navigation, guiding missile in the military affairs.
美国麻省理工学院Miller教授为了高速公路的自动设计于1956年提出了数字地面模型的概念后,DEM被用于各种线路的设计及各种工程的面积、体积、坡度的计算,任意两点间可视性判断及绘制任意断面图;在测绘中被用于绘制等高线、坡度坡向图、立体透视图,制作正射影像图与地图的修测;在遥感中可作为分类的辅助数据;它是地理信息系统的基础数据,可用于土地利用现状的分析、合理规划及洪水险情预报等;在军事上可用于导航及导弹制导;在工业上可利用数字表面模型DSM或数字物体模型绘制出表面结构复杂的物体的形状[2]。
-
We slowly bounced up a severely rutted dirt road, the drop-offs just to our right growing ever more precipitous as we ascended impossibly steep switchbacks.
我们缓慢地在一条尘土飞扬、辙很深的路上蹒跚而行。转过又一个陡峭的急转弯后,我们右边的坡似乎更陡。
-
When three gorge sluiced,bank slide between 135m and 175m must be instable,namely reservoir bank collapse.so the department concerning order to carry out special reaserch about bank collapse geological investigate, bank collapse prognosticate.bank collapse prevention and bank prevention information manage system and decision system.
三峡蓄水后,必然引起沿江两岸135m~175m范围库岸边坡的不稳定,即水库塌岸或边岸再造。鉴于此,国家相关部门下达对三峡库区两岸进行塌岸地质调查、塌岸预测、塌岸防治的工程技术以及塌岸防治信息管理系统与决策支持系统等专题研究。
-
The data from stress box indicate that the observed values usually are smaller than the theoretical ones, and the relationship between the vertical or lateral stress and the fill soil thickness can be described in a power function curve: a- a hb. The fact that the soil stress is bigger in the portion adjacent to the central part of gully and becomes smaller in the portion close to the side illustrates that the gully has an apparent unburdening effect. From the monitoring results of the settlement deformation during and after constructingperiod, the study conducts statistical system analysis and evaluation on the change of settlement with time.
根据压力盒测试结果表明,测量值往往比实际的理论计算值小,填土的竖向和侧向土压力与填土厚度可以用幂次型曲线表示:σ=ah~b愈向沟谷中心部位,土压力值愈小,愈向沟谷边缘,土压力数值越大,说明沟谷边坡具有明显的卸荷作用;根据施工期和工后期的沉降变形监测数据,对路堤内各测点的竖向沉降随时间的变化规律进行了数理统计系统分析和总结,工后期路面沉降和时间关系可用对数曲线表示:S=aln+b,并根据此沉降规律对高填方加筋土路堤的工后沉降进行了预测。
-
The data from stress box indicate that the observed values usually are smaller than the theoretical ones, and the relationship between the vertical or lateral stress and the fill soil thickness can be described in a power function curve: cr= ahb. The fact that the soil stress is bigger in the portion adjacent to the central part of gully and becomes smaller in the portion close to the side illustrates that the gully has an apparent unburdening effect. From the monitoring results of the settlement deformation during and after constructingperiod, the study conducts statistical system analysis and evaluation on the change of settlement with time.
根据压力盒测试结果表明,测量值往往比实际的理论计算值小,填土的竖向和侧向土压力与填土厚度可以用幂次型曲线表示:σ=αh~b,愈向沟谷中心部位,土压力值愈小,愈向沟谷边缘,土压力数值越大,说明沟谷边坡具有明显的卸荷作用;根据施工期和工后期的沉降变形监测数据,对路堤内各测点的竖向沉降随时间的变化规律进行了数理统计系统分析和总结,工后期路面沉降和时间关系可用对数曲线表示:S=aln+b,并根据此沉降规律对高填方加筋土路堤的工后沉降进行了预测。
-
Wanning, I eat is in Liuzhou, a tongue slope best to eat, the soup is boiled bones, there are my favorite pepper.
万宁后安粉,我吃过的就是在龙舌坡的一家最好吃,汤底是骨头熬的,还有我最爱的胡椒粉。
- 推荐网络例句
-
I didn't watch TV last night, because it .
昨晚我没有看电视,因为电视机坏了。
-
Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.
今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。
-
I'm running my simile to an extreme.
我比喻得过头了。