吊车
- 与 吊车 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
He said:"you don't worry, I'm a crane and the ambulance."
他又说:"你别急,我叫了吊车和急救车了。"
-
Do not need to set the crane, or hoist, or other auxiliary equipment.
不需要设置天车,或吊车,或其它辅助设备。
-
Raised, lowered, or positioned equipment, tools, and materials for installation or use using hoist, handline, or block and tackle.
用吊车、手线或滑轮组及辘轳,将要装置或使用的设备、工具,及材料,升高、降低或放好位置。
-
Cranes for containers, 53 folk lifts for goods,500 meters railway by-line; 24.97 million RMB for mechanical equipment assets
正面吊车4台,叉车53台,500延长米铁路专用线,机械设备总资产为2497万元
-
The last time I went, I was afraid to leave the chair lift.
上次去滑雪我根本不敢下吊车
-
Owing to the limit of crane hoisting capacity, positional interference between balance beam and crane arm will happen under certain conditions during hoisting the petrochemical equipment with large length and big diameter, so that the operation has to being stopped.
在大长度、大直径石化设备的吊装中,受吊车吊装能力的限制,平衡梁与吊车臂杆在某些情况下发生位置干扰,使吊装工作无法进行。
-
Aiming at mid-column with crane beam in gabled frames,three projects are compared to prove that it is most economic to take advantage of the crane beam to setup knee bracing as the reliable lateral support,thereby to minimize the out-plane effective length.
文中针对设有吊车梁的门式刚架中柱,对3种设计方案进行比较,证明利用吊车梁设置隅撑,为中柱提供可靠侧向支承点,从而减小其平面外计算长度,该方法最经济实用。
-
This paper introduces the anchor design principle and calculation method of the crane girder on cliff wall in Huizhou pump and storage water power station,especially analyses the prototype observation and discusses the relating questions for the anchor design.
简要介绍惠州抽水蓄能电站工程岩壁吊车梁的锚杆设计原则和计算方法,重点对原形观测资料进行分析,并对岩壁吊车梁锚杆设计的有关问题作了探讨。
-
About 300T road repairing, we will continue perform. TIMAS can use the 300T crane to hoist coal mill for about 1 or 2 days, which needs acceleration. Before plate girder lifting, cranes need to be changed the lifting condition and check.
关于300t 路面修整,我方会继续修复。300t 吊车 Timas 还可使用1-2天吊装磨煤机,但需要抓紧时间,大板梁吊装前,吊车需要改工况及检修。
-
Small amount of land fill in Victoria Harbour, you will
吊车轨道或吊车站如果需要作小规模填海,你会
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。