吊装
- 与 吊装 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Aiming at the situation of unable installation directly with crane of overloaded, overheight equipment in the equipment installation of 100t converter , equipment divided shifting craning installation and on-site integrate compound welding process are adopted and special installation working apparatus are designed, which assure the installation accuracy and realize one-time absolute installation.
针对100吨转炉设备安装过程中设备重量超载,超高,无法直接采用行车安装的情况,采用了设备分体移位吊装,现场整体组合焊接的施工工艺方案,设计专用安装工装,确保了设备安装精度并一次安装到位。
-
Tai'an City hongyun Ropemaker township enterprises located in the National Demonstration Zone - Fan Town Industrial Park, one exit south of Taylor Road West 100m, is a new type of private enterprises, professional production of industrial, marine, sports, leisure, agriculture, used in horticulture, such as a variety of rope, line, nets, plastic products, such as chuck, and products are mainly polypropylene has, nylon, polyester and other multi-filament braided rope cotton braided rope, PE round wire braided rope, Diamond playing rope, rope start , PE, PP three rope, mesh tearing rope, polypropylene line, PE wire, thread, thread, safety nets, lifting net, fishing nets, all kinds of plastic chuck, chuck, such as wood.
泰安市鸿运制绳厂座落在全国乡镇企业示范区-范镇工业园,泰莱一级公路出口向南100m路西,是一家新型民营企业,专业生产工业、船舶、体育、休闲、农业、园艺等所用的各种绳、线、网、卡盘等塑料制品,产品主要有丙纶、锦纶、涤纶等各种复丝编织绳、棉编织绳、PE圆丝编织绳、金刚打绳、启动绳、PE、 PP三股绳、网状撕裂绳、丙纶线、PE线、棉线、麻线、安全网、吊装网、捕鱼网、各种塑料卡盘、木卡盘等。
-
Prestressed Subassemblage concrete frame is assembled by precast prestressed beams and columns with tendons in the joints of the frames. These beams and columns are hoisted in site and the tendons are passed through the moire pipes. So prestressing force is brought to the joints of the frame.
预压装配式预应力混凝土框架是采用工厂化生产的预制柱和预制预应力梁,运至现场直接吊装,梁柱就位后,将后张预应力筋穿过梁柱预留孔道,对节点实施预应力张拉预压。
-
Subassemblage and Prestressed concrete frames are assembled by precast prestessed beams and columns with tendons in the joints of the frames. These beams and columns are hoisted in site and the tendons are passed through the moire pipes.
预压装配式预应力混凝土框架是采用工厂化生产的预制柱和预制预应力梁,运至现场直接吊装,梁柱就位后,将后张预应力筋穿过梁柱预留孔道,对节点实施预应力张拉预压。
-
They are effective in reducing noises of solid transaudient,are applicable for different types of large and small suspending equipment and pipelines.
该产品具有阻尼比大、自振频率低、安装方便、对固体传声有明显的降噪效果,对于各种大小设备及管道的吊装普遍适用。
-
It only took 38 months from construction preparation at the end of October, 2001 to the first unit operating on December 20, 2004, which antedated the construction time limit by 7 months. During the period, 5-month-construction period delayed was saved because of the karst geological problems of dam's partial foundation. 3 units were put into operation in 2005, especially it only took 23 days from the runner of 4# unit hoisted to put into operation. It created the wonder of installing large axial-flow feathering unit.
乐滩电站从2001年10月底开始施工准备到2004年12月20日首台机组投产发电,仅用38个月的时间,比合理工期提前了7个月,并在此期间,抢回因厂坝部份地基岩溶地质问题延误的5个月工期。2005年又实现了年内3台机组投产发电,尤其4号机组从转轮吊装到机组并网发电,仅用23天,创造了大型轴流转桨机组安装奇迹。
-
In this paper, basted on the sum-up and investigation of simulation calculation of long-span bridge construction in nation and international, the detailed approach of imitated calculation of long-span CFST arch bridge is given out, and the reason why the general backward analysis is not suitable for the application of the rib-hoisting of CFST arch bridge is analyzed. And an applied method for forward analysis based on iterative theory is put forward.
本论文通过对国内外桥梁施工仿真计算成果的总结和研究,给出了大跨度钢管混凝土拱桥仿真计算的具体步骤,分析了一般的倒退仿真计算方法不适合应用于钢管混凝土拱桥吊装的原因,并为此提出了基于迭代理论的前进分析实用方法。
-
Moreover, the reasons of many kinds of construction question have also analyzed and the measure has been proposed.4, Discuss the background of the projectCombined the latticed shell of the stadium in Chongqing Olympic Sports Centre, the security of the structure elements lifted segment by segment is discussed, and the technological difficulty of project is analyzed, such as compartmentalizing grid-frame segment.
工程背景的讨论基于上述基本理论,结合重庆奥林匹克体育中心体育场的网壳工程,讨论了该工程分段吊装的安全性,并分析了结构分段划分的具体技术难点。
-
There, it will be hoisted atop the Delta II rocket that is to send it into space.
在那里,它将会被吊装在将送它送入空间的Delta II 型火箭。
-
It is appropriate for hoisting, mounting and material handling tasks. This machine has very good performance with its PC controlled moment limier and hydraulic slavery devices which make it a low noise, high productivity and smooth running.
它适合吊装、安装和matreialtasks.this处理与机器性能已经很好了微机控制液压时刻limier和奴役装置,使低噪音、高生产力和顺利运作。
- 推荐网络例句
-
The split between the two groups can hardly be papered over.
这两个团体间的分歧难以掩饰。
-
This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.
这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。
-
The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.
聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力