英语人>网络例句>各 相关的搜索结果
网络例句

与 各 相关的网络例句 [注:此内容来源于网络,仅供参考]

Some indexes, such as SO2 emission, investment, running expenses, desulfurization cost and capacity of dealing pollutant etc., were estimated to evaluate the schemes.

并对预案条件下的SO_2排放量、投资运行费用、脱硫成本、污染物处理能力等项性能指标进行估算量化,初步分析了预案的优劣势。

When can a year's sabbatical, Ms. Han's approach has changed, Zijia You and friends Quliao Tang Shanghai is no longer the opening of the vehicles, but several fight a van; lived Aspects of Intellectual Property when the hotel does not provide a one-time items.

可今年休假时,韩女士的做法变了,自驾游和朋友一起去了趟上海,不再的车,而是几家拼一个面包车;住的时候专挑不提供一次性用品的酒店。

The high priest from Golgotha was there, splendidly robed in his sacerdotal garments.

他回来的大祭司,披著华丽的圣袍也在那里。

A* J T b/ c two runs in the fourth off Perez as Shelley Duncan and Cano singled, moved up on an Andy Phillips sacrifice bunt, then scored on a Jose Molina sacrifice fly -- his first RBI as a Yankee -- and a booming Johnny Damon double to center field.

在Andy Philips的牺牲打下进一个垒包,最后在Jose Molina的高飞牺牲打和目前火热的Jonny Damon中间方向的二垒打获一分,这也是Molina来洋基后的第一分打点。

Two runs in the fourth off Perez as Shelley Duncan and Cano singled, moved up on an Andy Phillips sacrifice bunt, then scored on a Jose Molina sacrifice fly -- his first RBI as a Yankee -- and a booming Johnny Damon double to center field.* '2 j, '2 w# J9 C l

在Andy Philips的牺牲打下进一个垒包,最后在Jose Molina的高飞牺牲打和目前火热的Jonny Damon中间方向的二垒打获一分,这也是Molina来洋基后的第一分打点。

Then, leaving the mill of the Gobelins and its four white walls on the left, there was the Faubourg Saint-Jacques with the beautiful carved cross in its square; the church of Saint-Jacques du Haut-Pas, which was then Gothic, pointed, charming

然后,左边越过戈伯兰家②的磨坊和四道白墙,就到了圣雅镇,那里交叉路口有座精雕细刻的美丽十字架,那里有一座上隘口圣雅教堂,当时是峨特式的,尖顶十分可爱

When arranging installation positions,besides considering the self mechanical installation space of the equipment,the surrounding site of dyeing machine shall also be considered so as to ensure the cylinder lilling ,cylineer discharging and sarong layort,etc work wioo be favorable to the furure maintenance.

检查气动阀和电气位置,确使它们在装设置与控制柜上按钮开关一一对应,并合泵的转向正确。

The program was written in C, the parameters were set according to the stability and transient response requirement and the experimental results showed that parameters were chosen satisfyingly.

软件用单片机C语言进行编写,控制环节的取值都考虑到系统稳定性和动态响应的要求,经过反复调试和试验,控制环节的取值都能满足设计要求。

A display technique of surface rendering was developed in order to display the numerical simulation results of 3-D scalar field physical quantity of the whole casting during solidification process visually and precisely.

为了更直观和准确地显示整个铸件部位在凝固过程中时刻的三维标量场物理量的数值模拟结果,设计了一种称之为表面绘制的显示技术。

Pressure each parts of machine design Mainly is to the scaleboard module, ascend plank module, small car module and sign pillar each parts of etc.

压力机部件设计主要是对底板组件、上板组件、小车组件、立柱等部件的尺寸设计及其装配设计。

第86/100页 首页 < ... 82 83 84 85 86 87 88 89 90 ... > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。