变压器油
- 与 变压器油 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Power transformer and reactor fittings - Part 2: gas and oil actuated relay for liquid immersed transformers and reactors with conservator.
电力变压器和电抗器配件。第2部分:带储油箱的液浸式变压器和电抗器用气动和油动继电器。
-
Through high-performance oil-pipe, in the proposed system the vacuum oil filter, pressuring oil filter, oil tank are combined with transformer or reactor; by means of switching over of oil circuit different oil-filtering functions can be implemented, thus the difficult problems such as the request for high quality of insulating-oil by large-scale oil immersed equipments of UHV substations and the difficulty to disposal large amount of insulating-oil are solved.
该系统把真空滤油机、压力式滤油机、油罐和变压器或高抗等通过高性能油管组合在一起,通过油路的切换实现各种滤油功能,解决了特高压变电站大型油浸设备对绝缘油品质要求高、油量大不易处理的问题。
-
Here after called Foredawn is a new company which registered in Tianjin China with a business focus in developing importing and exporting new technologies and products in power generation industry.
由于这台变压器运行还不到一年,遂请安装单位和厂家前来处理。3月20日,沈阳变压器厂家人员来到现场,在商定工作方案时,厂家的意见是先放油再换阀。
-
Among several neutral oils, transformer oil shows the best agglomeration effect. For the complex tailings, in which over 90% of molybdenum distributed in the range of -0.038 mm, the optimal dosage of transformer oil and frother was about 12 kg/t and 0.5 kg/t respectively, and the least agitation time and rate should above 3 min and 400 r/min, respectively.
结果表明,在众多中性油中,变压器油表现出了较好的油团聚浮选效果,对于钼金属分布率高于90%的-0.038mm粒级的浮选尾矿,其合适用量需达到12kg/t左右,与之配合的起泡剂用量在0.5kg/t左右,油团聚时间及搅拌强度分别需达到3min和400r/min以上。
-
The long-term unbalance of the three-phase direct-current electric resistance of the coal mine substation host transformer,has led to grave product of tap changer charcoal,insulation oil flash point reduces,threatens the safe operation.
煤矿变电所主变压器由于长期三相直流电阻不平衡,导致分接开关严重积炭,绝缘油闪点降低,危胁主变压器安全运行。
-
I plant main products are: 1, GB1235-76 series O-ring, GB34521-82 series O-ring, with other hydro-rubber O-ring; 2, U-shaped ring, Y-shaped ring, Yx - Seal, X-ring, J-ring, drum-shaped ring, Lei-ring, ring various geometric shapes electrical transformer ring; 3, HG4-692-67 series skeleton SEAL, JB2600-80 Series skeleton SEAL, China imported machinery supporting oil seal; 4, various models of standard high-pressure hose Telegraph textile, 5, all kinds of plastic strips, Jiaobang, anti-tip circle, JB982-77 series combined seal gaskets, shock absorption pad , Standards and non-standard items, Zapin production; 6, users can also be designed in accordance with the specific product design, I plant to design, test and manufacture a product.
GB1235-76系列O型密封圈、GB34521-82系列O型密封圈、其它液压气动用O形橡胶密封圈;2、U形密封圈、Y形密封圈、Yx形密封圈、X形密封圈、J形密封圈、鼓形密封圈、蕾形密封圈、各种几何图形电器密封圈、变压器密封圈;3、HG4-692-67系列骨架油封、JB2600-80系列骨架油封、国产进口机械配套油封;4、各种型号规格高压钢线纺织胶管;5、各种胶条、胶棒、防尖圈、JB982-77系列组合密封垫圈、减震垫,标准与非标准件、杂品的生产;6、还可根据用户自行设计的特异性产品图样,我厂给予设计、试验并加工制作成产品。
-
The authors present the features of on-line monitoring of oil-dissolved gas; in three aspects, i.e., the approach to collect gas, the detector and the monitored object, the on-line monitoring technology of oil-dissolved gas home and abroad, the developing trend of this technology and practical application examples are summarized in the hope of providing theoretical basis and reference for the implementation of on-line monitoring of oil-dissolved gas for transformer tap changing switch.
介绍油中溶解气体在线监测的特点,从取气法、检测器及监测对象三方面总结了国内外油中溶解气体在线监测技术的发展动向及应用实例,以期为日后实施变压器分接开关油中溶解气体的在线监测提供理论依据和参考。
-
This paper combines the movement of the qu-zhou electric Power bureaus actual with the three phase oil immersed transformer as example, thorough analysis the fault regulation of electrical transformer, putting for...
本文结合衢州电力局的运行实际,以油浸式变压器为例,深入分析变压器的故障规律,提出了变压器状态检修策略,并依此制定状态检修应用导则,在实际中得到很好的应用,指导了状态检修工作的开展。
-
The research aim of this thesis is the winding end insulating structure of oil immersed power transformer 110kV . Beause of the very asymmetric electric field, the higher electric field would apeared in the oil-gap and partial charge will easily engendered in the wedge oil-gap between static ring and head block of winding end.The two-dimensional isoparametric and finite element method is used for analyzing and calculating the electric field distribution in high voltage winding end insulating structure.
本文以110kV油浸电力变压器绕组端部绝缘结构为研究对象,针对绕组端部绝缘结构中静电屏与垫块之间存在楔形油隙区,致使电场分布很不均匀,油隙区中的电场强度较高,容易产生局部放电的特点,采用二维等参元有限元法及有限元软件ANSYS电磁场分析功能对高压绕组端部绝缘结构进行电场计算分析。
-
The conclusion that dissolved gases in gas composition and content of transformer could embody the inside of the transformer"s situation about "the insulation fault effectively is concluded.In the research of power equipment fault diagnosis based dissolved gases in transformer oil, the fault type increase clearly with the fault development. Traditional way is inability to faults diagnose of electrical equipment such as transformer that the fault reason, phenomenon and principle are indeterminacy etc.
在以油中溶解气体分析电气设备故障的模式识别研究中,当故障进一步发展,待判别的类型将显著增加,由于传统的诊断方法缺乏对样本数据的科学分析,不能够真实体现特征量数据的规律,将不可避免的面临准确率下降的问题,且不可能提供类间相互关系或演变过程的信息,因此用新的诊断方法来解决此类问题十分必要;本文在对目前变压器内部绝缘故障常用诊断方法总结分析的基础上,利用模糊数学的思想,提出以油中溶解气体为特征量,采用模糊聚类的方法对变压器内部绝缘故障进行诊断。
- 推荐网络例句
-
With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.
随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。
-
But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.
不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。
-
Closes the eye, the deep breathing, all no longer are the dreams as if......
关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。