取土坑
- 与 取土坑 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The paper introduces the way to calculate the pit elevation of borrow pit s by computer.
介绍一种运用计算机程序预求大堤所对应取土坑坑底高程的方法。
-
During winter construction, the distance of the inner side of a borrow pit to the fill insulation toe shall not be 1.5 times less than normal construction slope way.
冬季施工取土坑内侧到填方坡脚的距离不得小于正常施工护坡道的1.5倍。
- 推荐网络例句
-
Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).
呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。
-
The cost of moving grain food products was unchanged from May, but year over year are up 8%.
粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。
-
However, to get a true quote, you will need to provide detailed personal and financial information.
然而,要让一个真正的引用,你需要提供详细的个人和财务信息。