发电的
- 与 发电的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Solar energy in photovoltaic system is a mode of electric power generation directly which use solar cell of electronic device of semiconductor to generate power by absorbing solar radiation energy effectively and make it to change electrical energy,it is a principal way of dealing with energy shortage and protecting the environment against pollution to exploit and make use of solar energy which is regenerative and clean to generate electrical energy.
太阳能光伏发电是利用太阳能电池这种半导体电子器件有效地吸收太阳光辐射能,并使之转换成电能的直接发电方式。开发利用太阳能这种可再生的清洁能源发电是解决能源短缺、保护环境的重要途径。
-
CFB clean coal power generation technology is a kind of combustion technology for power generation, it is the internal combustion in circulating fluidized bed boiler with coal particles, and at low-temperature combustion furnace conditions add to the amount of limestone achieve desulfurization, denitration cleanliness coal power generation technology.
CFB发电技术是煤清洁燃烧发电技术的一种,它是在循环流化床锅炉内燃用颗粒煤,并在低温燃烧状况下向炉内加入适量石灰石实现脱硫、脱硝的洁净煤发电技术。
-
Wind energy is a conversional form of solar energy, which can't be used up, and it doesn't pollute circumstance.
变速恒频风力发电是近年发展起来的一种新型发电技术,发电质量能否达到国家标准是此项技术能否实用化的关键。
-
For organization management system, it pays emphasis on researching existing issues on stockholders promotion and headquarters strategy, put forward improvement thoughts by introducing operator holding, employee holding plan and establishing the valuable relationship between management holding headquarter and subcompany.
本文就发电企业总部战略定位模糊问题,提出建立发电企业总部与子企业管理型控股模式的改进思路,就发电企业员工工作动力不足问题提出新的员工绩效激励的模式。
-
The VSCF DFIG wind power generation is transient response proceeding, which is influenced by operation characteristics of generator before and after grid connected. A novel S-Function is adopted to describe the mathematic model of DFIG based on state equation. A complete simulation model of VSCF DFIG wind power generation system based on MATLAB/Simulink and SimPowerSystems is established, which can be used to not only simulate subsystems of no-load operation and generation operation, as well as can be used to but also accurate control parameters of DFIG in simulation. The simulation model have excellent transportability, and can be used DFIG of different power rated if only design relevant controller.
变速恒频双馈电机风力发电是一个受并网前后发电机运行状况影响的暂态过程,利用MATLAB的S-Function编写DFIG的仿真程序,然后结合Simulink和SimPowerSystems工具箱,开发了基于S-Function的空载运行和发电运行的变速恒频双馈电机风力发电子系统模型,在仿真过程中可对双馈电机进行精确控制,然后对其进行了系统整合,本文开发的模型具有可移植性,只要再设计相应的控制器,就可应用于不同功率等级的双馈电机风力发电系统。
-
Firstly, the flood control regulation of TGP in Sep is computed based on the analyses on the inflow in Sep and Oct, and the risk and loss on the ahead impounding scheme is calculated and analyzed. Then, the storage level, power production and releasing discharge are achieved by computing on the electricity generation model through reservoir regulation graph. Thirdly, obstruction in channel is analyzed and the problem in the Chongqing reach is more serious in 175-145-155m scheme. The sediment aggrading process and distribution on different schemes is calculated by 1-D reservoir mathematical model. The navigation benefit is computed by navigation model. Based on above calculations, the impounding time is decided by the multi-purpose decision model, and evaluate by analytical hierarchy and balance layout model. A best impounding scheme is achieved to match the requirement of flood control electricity generation and navigation et al.
首先,在对宜昌站9、10月份来水分析的基础上,采用第2章建立的防洪优化调度子模型进行了三峡水库9月份防洪调度,分析了汛末提前不同天蓄水对防洪的影响,计算了汛末不同蓄水方案水库9月份的洪灾风险率和风险损失;接着,根据第2章建立的发电调度子模型进行了三峡水库发电调度计算,得出了不同蓄水方案下水库的坝前水位、发电量及下泄流量过程;然后,分析了175-145-155m方案下三峡水库的碍航问题,指出175-145-155m方案下重庆河段的碍航问题最为严重,通过进行不同蓄水方案下水库一维泥沙冲淤计算,得出了不同蓄水方案下库区淤积过程及分布,并通过航运调度子模型,计算了不同蓄水方案下水库的航运效益;最后,根据以上防洪、发电及航运调度计算的结果,运用第3章水沙多目标决策模型对水库的蓄水时间进行了多目标决策,并采用层次加权均衡规划模型对计算结果进行评价,得到一个能满足水库防洪、发电及航运各方面要求的最佳蓄水方案。
-
When microgrid is operated in islanded mode, VSGs can be divided into non-frequency regulation units and frequency regulation units, the former can generate power and participates in primary frequency control according to dispatching to mitigate system frequency deviation due to disturbances; the latter can offer referential voltage of microgrid and use secondary frequency regulation to implement no-error frequency control.
微电网孤岛运行时,将虚拟同步发电机分为非调频发电单元和调频发电单元,前者既能按照功率调度指令发电,又能参与一次调频,缓解扰动情况下系统频率的波动,后者提供微电网参考电压,并利用二次调频实现频率的无差控制。
-
According to analysis of current situation to electricity power enterprise, This text combine...
本文通过对发电企业绩效管理现状的分析,结合发电企业的特点,提出了一套适合我国发电企业特点的绩效管理体系。
-
According to analysis of current situation to electricity power enterprise, This text combines the characteristic of it, put forward a set of system of performance management suitable for electricity power enterprise of our country.
本文通过对发电企业绩效管理现状的分析,结合发电企业的特点,提出了一套适合我国发电企业特点的绩效管理体系。
-
The gasturbine own electricity generation efficiency does not calculate veryhigh, generally between 30%~ 35%, but produces the waste heat hazetemperature reaches as high as 450 ~ 550 ℃, may recycle the heatenergy transformation steam once more through the afterheat boiler,the actuation steam turbine sends time of electricity again, forms thegas turbine -- steam turbine union circulation electricity generation,the electricity generation efficiency may achieve 45%~50%, somelarge-scale units even may surpass 55%.
燃气轮机自身的发电效率不算很高,一般在30%~35%之间,但是产生的废热烟气温度高达450~550℃,可以通过余热锅炉再次回收热能转换蒸汽,驱动蒸汽轮机再发一次电,形成燃气轮机--蒸汽轮机联合循环发电,发电效率可以达到45%~50%,一些大型机组甚至可以超过55%。
- 推荐网络例句
-
This one mode pays close attention to network credence foundation of the businessman very much.
这一模式非常关注商人的网络信用基础。
-
Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.
扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。
-
There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.
双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。