发电厂
- 与 发电厂 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Products widely used in thermal power plant boiler coal pulverizing system, piping, fan blades, shell, cement separator, drain shafts and other machinery and equipment wear and tear more serious parts.
产品广泛应用在火力发电厂锅炉制粉系统、管道、风机叶片、壳体、水泥选粉机、漏槽及其它机械设备磨损较严重部位。
-
Finally, this paper studies thoroughly a novel approach to detect rotor bar breaking fault, which is based on the perfect combination of the Hilbert Transform and digital f
在上述研究的基础上,针对山西娘子关发电厂7#给水泵(YK2300-2/990笼型异步电动机),研制大型异步电动机状态监测与故障诊断系统,目前已完成安装调试,试运行阶段效果良好。
-
When bus bar fault occurs,all components connected on the faulty bus bar will be in outage until power restores by repairing the faulty bus bar or switching them over to another bus bar.
发电厂的母线是电厂中的一个重要组成元件,当母线上发生故障时,将使连接在故障母线上的所有元件在修复故障母线期间,或转换到另一组母线上运行以前遭到停电。
-
In order to increase the stability and reliability as well as the accuracy of water level control system of high pressure feed water heater,the digital intelligent transtucer regulator has been utilized to replace the traditional base type pneumatically operated float regulator.
摘 要]为了提高火力发电厂高加水位控制的稳定性和可靠性,提高控制精度,采用数字式智能变送调节器代替传统的基地式气动浮筒调节器的控制模式,方法简单、实用。
-
Entrusted by China ShenHua Energy Company Ltd (hereafter called "Tenderer"), Shenhua International Ltd.(hereafter called "Tendering Agent") invites sealed bids from eligible bidders for the supply for the project of Shenhua Shengli Power Plant material procurement for China ShenHua Energy Company Ltd — Turbine By-pass System Turbine By-pass System. By-pass Feed Valve . Electric Gate Valve for Shengli Power Plant 8×660MW project .
神华国际贸易有限责任公司受中国神华能源股份有限公司的委托,就中国神华能源股份有限公司神华胜利发电厂工程进口设备采购—胜利电厂8×660MW 旁路系统、给水旁路阀、电动闸阀采购项目进行国际公开招标,现邀请合格的投标者进行密封投标。
-
Entrusted by China ShenHua Energy Company Ltd (hereafter called "Tenderer"), Shenhua International Ltd.(hereafter called "Tendering Agent") invites sealed bids from eligible bidders fthe supply fthe project of Shenhua Shengli Power Plant material procurement fChina ShenHua Energy Company Ltd — Turbine By-pass System Turbine By-pass System. By-pass Feed Valve. Electric Gate Valve fShengli Power Plant 8×660MW project.
神华国际贸易有限责任公司受中国神华能源股份有限公司的委托,就中国神华能源股份有限公司神华胜利发电厂工程进口设备采购—胜利电厂8×660MW旁路系统、给水旁路阀、电动闸阀采购项目进行国际公开招标,现邀请合格的投标者进行密封投标。
-
So it is regarded as research benchmark for the development of new ferritic heat-resistant steels with higher application temperature.
T91(9Cr-1Mo-V-Nb-N)钢是高Cr铁素体耐热钢的代表钢种,广泛用于超临界发电厂锅炉管道上;同时也是开发更高使用温度的铁素体耐热钢材的研究基准。
-
Industrial building is one important architectural style, fire power plant building is one deputy of industrial building .
工业建筑是现代建筑的一个重要类型,火力发电厂作为现代工业建筑的代表之一,其建筑形式受到工艺流程的严格制约。
-
The consuming water in a fire power plant, circulating cooling water accounts for absolute proportion, about more than 90% of the total.
而在火力发电厂耗水中,循环冷却水量占了绝大比例,约占全厂用水量的90%以上。
-
This paper has studied the issue of electricityprice forecasting for fire power plant bidding for accessing to power networks inEast China electricity market.
论文研究了华东电力市场环境中的火力发电厂在参与竞价上网时的电价预测问题。
- 推荐网络例句
-
This one mode pays close attention to network credence foundation of the businessman very much.
这一模式非常关注商人的网络信用基础。
-
Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.
扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。
-
There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.
双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。