英语人>网络例句>加固 相关的搜索结果
网络例句

加固

与 加固 相关的网络例句 [注:此内容来源于网络,仅供参考]

It is shown that beams of reinforced average strain distributing accord with flat section assume; The method of strengthening intension of concrete structure with reinforced materials is a feasible way. The strength of beam can be increased with the number of reinforcement materials be added; The strength of beam is affected by percentage of flexural reinforcement and the compound proportion and fashion of reinforcement materials and the number of reinforcement materials; The capability of bend and stretch and price of inner hybrid fiber is better than sole fiber and exterior hybrid fiber.

通过分析可知:加固后的梁,其平均应变的分布符合平截面假定;使用加固材料来提高混凝土受弯构件承载力的补强加固方法是有效的;构件受弯承载力随加固材料用量的增加而提高;纵筋配筋率、加固材料混杂比例及混杂方式、加固材料用量均对受弯承载力有一定的影响;层内混杂纤维的抗弯性能、延伸性能以及经济性均优于单一纤维和层间混杂纤维。

On summarizing the common methods of reinforcement and reconstruction,bring forward a series new methods of reinforcement and reconstruction -from extrados reinforcing Two-way Curved Arch Bridge,including mostly reinforcing vault and skewback critical sections,at the same time optimizing deck structure reinforcement method;only reinforcing skewbackreinforcement method;altering arched arch construction for beam-arched arch reinforcement method.and combining condition of health rating with reinforcement method,as for different quality grade to select different reinforcement method.

在总结常用加固改造方法的基础上,提出了系列新的加固改造方法—从拱背加固双曲拱桥,包括主要加强拱顶和拱脚两控制截面,同时优化桥面结构的加固方法;仅加强拱脚截面的加固方法;改拱式拱上建筑为梁拱式拱上建筑的加固方法。并把技术状况评定等级与加固方法结合起来,根据不同的质量等级选择不同的加固方法。

It was necessary that the frontispiece of face was pre-supported in the especial stratum. Fourthly, by the model analytic value and the FEM numerical simulation, the advance reinforcement parameters were analyzed roundly, and its results explained that the parameters had optimal values. A series of formulations conforming loads born up for pre-reinforcement structure were given, and five rules for its design and choice were put forward.

全面分析了影响工作面超前预加固参数的因素;揭示了拱部超前预加固参数与地层参数、隧道开挖与支护参数等的内在联系;论证了地层预加固参数的最佳值概念;给出了确定超前预加固结构作用荷载的半拱法、全拱法和全土柱法理论计算公式;建立了隧道工作面上覆地层稳定性判别的准则;提出了工作面地层预加固参数设计与选择的5个指导原则;最后给出了一整套确定浅埋暗挖法隧道工作面地层预加固参数的动态设计方法。

Based on the low cyclic loading experiments on one brick masonry wall with ordinary pilaster and eight specimens of masonry walls with pilaster strengthened by GFRP, the failure characteristics of the walls are explained; seismic performance characteristics, such as resilience, rigidity and its degeneration, deformation, and energy dissipation are studied; and influence of the measures including strengthening means, reinforcement area proportion between GFRP and wall surface,"through-wall" anchorage reinforcement effects are studied.

通过1片未加固带壁柱砖墙和8片GFRP加固带壁柱砖墙在低周往复荷载作用下的抗震性能试验,阐述了各试件的破坏特征;研究CFRP加固前后墙体的滞回特性、刚度及退化特性、变形性能、耗能性能等变化规律,以及加固方式、加固量和"对拉"锚固措施对加固效果的影响。

At the same time,it designed the project of construction supervision and measure aimed at the strengthening bridge by external presttessing,through the contrast between the result in theory and fact,we can see that it is feasible to use predigestion's computing based on elasticity to analyse continuous rigid frame briges reinforced by external presttessing ,and it can ignore the effect of the second stress. So, it can be capable of the analyses in the strengthening bridge by external presttessing using the method of controlling by flexibility and stress to set up the model of scathe,and,the method of external presttessing can ensure stress reserve of the main beam, to reduce effectively PrinciPal tensile stress, to renew line state of bridge structure and gradient. The effect of strengthenment was obvious and the reinforcement scheme was successful.

同时,进行了该桥体外预应力加固监测方案设计,并通过理论计算结果与实际监测成果的比较,验证了在施工阶段及正常使用阶段,大跨连续刚构体系的体外预应力加固计算中忽略二次应力增量的影响,采用弹性分析方法进行简化计算的可行性,进而说明采用双控拟合方法建立的结构损伤模型能够满足体外预应力加固计算的要求,并且体外预应力加固法能够显著增大主梁的应力储备、有效地减少了主拉应力、恢复了桥面线形和坡度,加固效果明显,加固方式成功。

According to the features of southern Fujian,and combined with the reinforcement principles of ancient architecture,it discusses the reinforcement strategies of ancient architecture in southern Fujian from the wooden structure reinforcement and block stone structure reinforcement.

根据闽南地区的特点,结合古建筑的加固原则,从木结构的加固和砖石结构的加固两方面深入探讨了闽南古建筑加固修复的对策,并对与闽南古建筑加固的其他相关问题进行了分析,强调了古建筑加固"整旧如新"的问题应该得到有效的控制和解决。

The results show that the displacement of rock body may change direction in regulative distortion phase, the displacement presents periodicity according to the storing and the destroy of the energy of rock distortion, the quantity of displacement of the top is more than that of the bottom, the quantity of displacement and the destroy periodicity of the reinforced terrane infused plasm are less than that of the irreinforced terrane infused plasm, the convergence of bordroom is the displacement of certain thickness wall rock of surface layer.

得出:岩体在调整变形阶段可能改变位移方向,岩石破坏呈现周期性,洞室边墙上部比边墙脚位移大;注浆加固后的岩层比未加固岩层的位移小,破坏周期短;洞室的收敛只是表层一定厚度的围岩位移的外在表现,收敛层外岩体向山体方向移动;加固破碎围岩的关键技术是按照工程所处应力场,充分考虑加固层周围地质构造影响,设计加固层的厚度和加固闭合拱。

1 Contrast unstrengthened square reinforced concrete column and 10 reinforced concrete columns strengthened by circular steel jacket were tested under axial loading .

为研究圆形钢套管加固混凝土柱的基本力学性能,进行了1根未加固的普通钢筋混凝土柱和10根圆形钢套管加固的混凝土短柱在不同加固钢套管厚度及初始轴压比下轴心受压试验,初始轴力通过对未加固试件施加后张预应力来进行模拟;在试验研究的基础上,根据应变协调原则对加固后构件轴压承载力进行了数值分析。

The result indicates that three groups of concrete beams strengthened by anchor-bolted steel plate can be loaded as far as they were destroyed; compared with unstrengthened beams ,these beams strengthened by steel plate using adhesive or anchor all can achieve a seventy percent higher loading capacity and thirty percent higher stiffness. On the condition that with the same steel plate ,concrete beams strengthened by bolting steel plate can work as good as those beams strengthened by using adhesive.

试验结果表明:三种锚固布置方式加固梁都能保证钢板与混凝土联合工作直至梁破坏;与未加固梁比较,锚固钢板加固梁和外粘钢板加固梁一样,都能有效提高梁的承载力和刚度,其中承载力提高幅度约为70%;刚度提高约为30%,这说明在钢板量相同的情况下,锚固钢板加固梁能够达到与粘结加固基本相同的加固效果。

The major content of this thesis are as follows:1 Performed FEM analysis before strengthening, and to find out the reason for the cracking and present a strengthening scheme;2 Performed nonlinear FEM analysis before and after strengthening, and to get the varying rule of the relative displacement between the on-site cast concrete side wall and that between the precast concrete arch and the floor, as well as the stress distribution of the gallery;3 Performed on-site observation experiments on the 7~th gallery, and to get the varying rule of the relative displacement between the on-site cast concrete side wall, as well as that between the precast concrete arch and the floor.4 The results of the computation were compared with those of experiments, which verified the effect of the strengthening.

本文的主要工作有: 1 对加固之前的廊道结构进行有限元计算,找出廊道底板开裂的原因,提出加固方案; 2 对加固前后廊道结构进行非线性有限元计算,得到加固前后廊道两现浇边墙相对位移、拱顶与底板相对位移随水库水位变化的规律和廊道结构的应力分布情况; 3 进行廊道加固前后现场观测试验,得到廊道两现浇边墙相对位移以及拱顶与底板相对位移随水库水位变化的规律; 4 对比分析加固前后现场观测试验与非线性有限元计算所得结果,论证加固方案的合理性,验证加固效果。

第1/80页 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

It has been put forward that there exists single Ball point and double Ball points on the symmetrical connecting-rod curves of equilateral mechanisms.

从鲍尔点的形成原理出发,分析对称连杆曲线上鲍尔点的产生条件,提出等边机构的对称连杆曲线上有单鲍尔点和双鲍尔点。

The factory affiliated to the Group primarily manufactures multiple-purpose pincers, baking kits, knives, scissors, kitchenware, gardening tools and beauty care kits as well as other hardware tools, the annual production value of which reaches US$ 30 million dollars.

集团所属工厂主要生产多用钳、烤具、刀具、剪刀、厨具、花园工具、美容套等五金产品,年生产总值3000万美元,产品价廉物美、选料上乘、质量保证,深受国内外客户的青睐

The eˉtiology of hemospermia is complicate,but almost of hemospermia are benign.

血精的原因很,以良性病变为主。