英语人>网络例句>剪下 相关的搜索结果
网络例句

剪下

与 剪下 相关的网络例句 [注:此内容来源于网络,仅供参考]

The failure process and its cause are analyzed and the response of the short-leg shear wall under the combination loading of the axial compressive force and progressive lateral forces.

比较真实的反映了短肢剪力墙在轴压力和逐步加载侧向力共同作用下的响应。

My daughter is now 19 months, just born when the doctor said to cut, but do not come out she is not stretching, but stretching is not long, and now, she can speak a lot, I she look pretty articulate clearly, but do not know after retroflex pronunciation whether there will be problems?

宝宝现在19个月,刚生下来时医生说要剪,不过她不是伸不出来,只是伸不长,现在话,她会讲很多话,我看她口齿还算清楚,不过不知道以后对卷舌音的发音是否会有问题?

This product works on the principle that the inertial vibrating riddler almost reaches resonance. It had a high rate of screening and big swing of the screening machine that it does not jam the screen sieve. It is also of great adaptability to materials. The main vibrating spring uses cutting rubber spring which has low noise, and a long life. It is sealed to prevent environmental pollution. The working efficiency is 3 times than that of the original frequency. It has a good anti-vibrating effect.

该机采用惯性共振系统在近共振状态下工作,单位面积筛分效率高,筛机振幅大不堵筛,对物料适应性强,主振动弹簧选用剪切橡胶弹簧,设备噪音低,寿命长,机壳密闭性好,环境污染小,工作效率为阁振系统固有频率的三倍,有良好的隔振效果。

The maximum run-out distance is 3200m. The three cases are studied from the Niuquangou rockslide-debris flow at the south west segment of the main seismic fault, the Chengxi rockslide at the middle segment of the main seismic fault and the Donghekou rockslide-debris flow at the north east segment of the main seismic fault.The three cases illustrates following common characteristics:(1)parent rockmass is broken under long geologic processing and weathered;(2) Rockmass was separately expanded and thrown under long-period strong ground vibration in which the vertical motion was predominant along the main seismic fault;(3)sliding mass was crashed at the exiting zone and transferred to fragment material;(4) The secondary landslide was triggered underneath the exiting zone due to the powerful crashing and shaving processes that provides more mass to debris body and cushion shape;(5) The a long run-out distance fragment flow is occurred under air layer lubrication. The air layer was pressed and turbulently flowed in the narrow-shaped valley, or laminarly flowed in the extensive flatland.

本文重点解剖了位于地震破裂带南西段的汶川映秀牛圈沟滑坡-碎屑流、位于地震破裂带中段的北川城西滑坡和位于地震破裂带北东段青川东河口滑坡-碎屑流3个典型实例,认为具有如下特征:1)岩性条件:母岩遭受长期构造动力作用,呈碎裂岩体,后期被强烈风化,岩体极为破碎;(2)抛掷效应:位于汶川地震主断裂带或附近,垂直加速度大于水平加速度,强地面运动持时长,岩体发生振胀和抛掷;3)碰撞效应:上部滑坡体发生高位剪出和高位撞击,致使岩体碎屑化;(4)铲刮效应:撞击作用导致下部山体被铲刮,形成次级滑坡,为碎屑流体提供了足够展翼和抛洒物源体积;5)气垫效应:碎屑化岩体快速抛掷导致下部沟谷空气迅速谷状圈闭和向下紊流,形成气垫效应,或者,在下部地形开阔地带压缩空气呈层流状态致使滑体凌空飞行。

ANSYS software was used to analyze the two models. Results When Couette flow was loaded, the stereocilia had a larger angular displacement in non-coupled manner, Von Mises stress were higher on tip link and rootlet, and the characteristics of natural frequency were quite similar on two models.

结果 模拟Corti器振动过程,在相同剪切流的压力作用下,静纤毛在不接触盖膜时表现偏移度较大;两种模型均表现在静纤毛顶连接及小根基部应力较高、固有频率近似。

The steel structure of the main body forms the whole giant spatial saddle-shaped steel truss knitting type "the bird nest", the steel structure totally uses the steel quantity is 42,000 tons ,the concretes stand divides into upper, middle and lower three, the stand concrete structure is underground 1 ,on the ground 7 floor of reinforced concrete frame - shear wall structural system.

主体钢结构形成整体的巨型空间马鞍形钢桁架编织式"鸟巢"结构,钢结构总用钢量为4.2万吨,混凝土看台分为上、中、下三层,看台混凝土结构为地下1层,地上7层的钢筋混凝土框架-剪力墙结构体系。

Under the inspiration of this great and moving ideal, Ebony Scissortail, passed through many years and reached us.

黑剪尾,正是在这种催人奋进的伟大理想的感召下,穿越漫漫岁月,抵达我们面前。

METHODS: The rib trabeculae were resected and broken, trypsinizated and washed completely by PBS. Bone surface and non-adhesive floating cells in cleaning fluid were observed with inverted microscope. Rib trabeculae was washed by DMEM culture medium once, and cultured in culture bottle. The culture liquid was replaced by new one once a week. The osteoblast was moved from the sclerite a week later. The cells were fused monolayer and could be subcultured 4 to 6 weeks later.

切下人肋骨骨小梁剪碎,胰酶消化后以PBS彻底冲洗直至于倒置显微镜下观察骨片表面及清洗液中无粘着及漂浮的细胞,以DMEM完全培养液清洗骨小梁1次,移入培养瓶内培养,每周更换培养液1次,1周后可见成骨细胞自骨片移出,4~6周细胞融合成单层可作传代培养。

In some flying shears the running performance of the top and bottom selsyn roller usually can be improved by using main-second gear on the gear of the driven shaft.It can make the gear working at no lateral gap and eliminate shock load.

在某些飞剪机上,为了改善上下滚筒同步齿轮的工作性能,被动轴上的齿轮往往采用主副齿轮结构,以便齿轮在无侧隙情况下工作,减少和消除冲击负荷。

After incising serosa of bladder and rectum a suture was made for closure the vaginal summit and pelvic cavity .

自穴道牵出游离的前后片,缝合于阴道口的前庭粘膜于腹腔镜下剪开直肠和膀胱表面的浆膜,缝合关闭阴道顶端及盆腔。

第39/57页 首页 < ... 35 36 37 38 39 40 41 42 43 ... > 尾页
推荐网络例句

I didn't watch TV last night, because it .

昨晚我没有看电视,因为电视机坏了。

Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.

今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。

I'm running my simile to an extreme.

我比喻得过头了。