前炉
- 与 前炉 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Most chemical occupational-disease hazards were low to the limit of GBZ2-2002 except lead smoke and carbon monoxide in front of the furnace. The noise of most workplaces was classified as 0 except those above Ⅰ at some workplaces like grinding, granule-making, etc. The hot working environment of the furnace was classified as Ⅵ, other hot working environments were classified asⅠ.
除炼铁厂炉前铅烟、一氧化碳个别点超标外,其他化学性职业病危害皆未超过接触限值;除个别岗位如破碎、制粒等噪声作业分级为Ⅰ级以上外,大部分作业点噪声作业分级为0级;炼铁厂炉前高温作业为Ⅵ级,其他热源岗位为Ⅰ级。
-
The system is fitted with a cupola with self-charged system and two rows of big distance water-cooled devices and with medium frequency electric furnace duplex alloy smelting system in front and in the rear of the furnace there are well-equipped with high precision BARID spectrometer, SABULANCE NSP6000 melted iron quality controller, DM3 type nondestructive flaw detection device for production procednres monitoring of physical, chemical, metallographic, mechanical properties.
冲天炉电炉双联熔炼,有炉前炉后配套齐全的高精度贝尔德光谱分析仪,碳硅当量仪及物理、化学、金相、机械性能检测仪器,确保产品质量稳定。
-
The raw materials of spherulitic complete adopt world famous "GINSENG Iron". The iron melt makes use of new technology before furnace such as duplex smelting and shaking foundry ladle to cast.
球墨铸件全部选用驰名中外的&人参铁&为原料,铁水经过双联熔炼及摇包脱硫等炉前铸造新工艺,采用瑞士 ARL 直读光谱仪进行炉前快速分析。
-
Combined with investigation results of the furnace body erosion before relining, this paper analyzes the cause of production problems appeared in the first campaign life of the blast furnaces. Because of the existence of design shortcomings in large cooling block and bosh cooling stave, it resulted in poor furnace performance, such as stronger peripheral gas flow and irregular profile. The quick rise of bottom temperature of No.7 BF was caused by the penetration of molten iron into the joint of bottom carbon block, wheresas the quick rise of bottom temperature of No.6 BF was due to gas fleeing through the furnace bottom.
结合大修前炉体破损情况,对这两座高炉第一代炉役生产中出现的问题进行了调查研究。7号高炉大型模块和炉腰冷却壁设计上存在不足,引起高炉边缘气流发展,操作炉型不合理,炉况不顺;7号高炉炉底温度偏高是炉底炭砖渗铁造成的,6号高炉炉底温度偏高是炉底串煤气所致;7号高炉铁口失常的主要原因是铁口组合砖损坏严重和该部位炉壳开裂。
-
In different melting processes and equipment, which applies to paragraph A size with the flow of hot metal steel by carbon and completed post-furnace carbon; B above apply to normal size electric induction furnace by Carbon; C segment size can be applied only in cupola melting furnace by carbon.
于不同的熔炼工艺和设备,其中 A 粒度段适用于炉前铁水随流增碳和炉内后期补碳; B 粒度段适用于正常感应电炉炉内增碳; C 粒度段仅可以适用于大型转炉炼钢熔炼增碳。3.12 由客户直接提出粒度规格要求,或与春秋铸材技术人员联系。
-
In different melting processes and equipment, which applies to paragraph A size with the flow of hot metal steel by carbon and completed post-furnace carbon; B above apply to normal size electric induction furnace by Carbon; C segment size can be applied only in cupola melting furnace by carbon.
于不同的熔炼工艺和设备,其中 A粒度段适用于炉前铁水随流增碳和炉内后期补碳; B粒度段适用于正常感应电炉炉内增碳; C粒度段仅可以适用于冲天炉炉内熔炼增碳。3.12 由客户直接提出粒度规格要求,或与春秋铸材技术人员联系。
-
Melting equipment used cupola - IF double-smelting furnace process, with German imports Front of direct-reading spectrometer Front carbon and sulfur and high-speed analyzer to ensure that the hot metal on-line quality control, can produce HT150 ~ HT300, QT400-10 ~ QT700-3 made of grey pieces of iron and ductile iron pieces.
熔化设备采用冲天炉—中频电炉双联熔炼工艺,炉前配有德国进口的直读式光谱仪和炉前碳硫高速分析仪,保证铁水的在线质量控制,可生产HT150~HT300,QT400-10~QT700-3材质的灰铁件和球墨铸铁件。
-
Induction Furnace Carburizing Furnace;■ cupola furnace by carbon;■ process by double-carbon;■ steel package with the flow of hot metal by carbon.
感应电炉炉内增碳;■冲天炉炉内增碳;■双联工艺增碳;■炉前铁水包随流增碳。
-
I.S.P is the typical complex and continuous production process. Based on the peculiarity of I.S.P: physical chemistry reaction is quite complex, operation condition is comparatively rigid, the charging ration needs to be exactitude. Temperature variety of zones in furnace including: warm-up charging zone, re-oxidation zone, revivification zone, slag smelting zone, The soft point and soft zone are the key factors, which have an effect on the smelting of ISP and it is a comprehensive parameter appraising the quality of sintered aggregate.
基于密闭鼓风炉铅锌冶炼生产过程特点:物理化学反应十分复杂,操作条件比较严格,入炉物料的配比要求也非常精确,是典型的复杂连续生产过程;论文分析了炉内各带的温度变化:料预热带、再氧化带、还原带、炉渣熔化带;分析、总结了影响鼓风炉生产的因素:鼓风制度(富氧熔炼、预热鼓风熔炼)、炉料的性质对熔炼过程的影响(烧结块、焦炭的性质及消耗)、鼓风炉操作的影响因素(鼓风炉系统、鼓风量与风温调节、炉前操作、冷凝分离系统、煤气洗涤系统、电热前床)。
-
With 54# half-refined paraffin as raw material,the technology of the second injecting steam of ethane cracking is used for reference in the paraffin cracking process which avoides the coke produced in cracking furnace.
采用优质的54#半精炼石蜡,将乙烯裂解二次注汽技术融合在石蜡裂解技术中,避免了裂解炉结焦;考察了单程裂解、炉前甩残蜡循环裂解、炉后甩残蜡循环裂解在相同的工艺条件下的产品质量、产品收率及存在的问题;验证了新的炉后甩残蜡循环裂解是较好的工艺路线,在较高的水蜡比15%,高温600℃、低烃分压和短停留时间(2s左右)条件下,能生产出高质量的α-烯烃产品(总烯烃质量分数在97%以上,α-烯烃含量为88%)。
- 推荐网络例句
-
They weren't aggressive, but I yelled and threw a rock in their direction to get them off the trail and away from me, just in case.
他们没有侵略性,但我大喊,并在他们的方向扔石头让他们过的线索,远离我,以防万一。
-
In slot 2 in your bag put wrapping paper, quantity does not matter in this case.
在你的书包里槽2把包装纸、数量无关紧要。
-
Store this product in a sealed, lightproof, dry and cool place.
密封,遮光,置阴凉干燥处。