前桥
- 与 前桥 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Focusing on the normal inverter's dynamic characteristics which can not satisfy the requirement of reducing current quickly before the time of rupturing of the bridge, a new current wave controlling method for short circuit transfer CO 2 welding using satiable inductor is put forward in this paper.
本文针对普通CO2焊逆变电源的动态性能不能满足短路过渡CO2焊波控方法的要求,焊接电源难以实现在液桥爆断前迅速减小电流的问题,提出了一种在波控方法中采用可饱和电感作为CO2逆变焊机续流电感的方案。
-
5S-111GPA has 9 forward speeds, 4 forward speeds of main case shift by ZF-BK short travel synchronizer, auxiliary case shift by lock ring synchronizer, the reverse and crawler shift by joint sleeve. The differential drives front axle and rear axle simultaneously. The output shaft and input shaft swivel in the same direction.
变速器具有九前一倒档,主变速器4个前进档采用ZF-BK型短行程同步器换档,副变速器采用锁环式同步器换档,爬档和倒档采用接合套换档,差速器同时驱动前后桥,其输出轴与输入轴旋向相同。
-
5S-111GPA has 9 forward speeds, 4 forward speeds of main case shift by ZF-BK short travel synchronizer, auxiliary case shift by lock ring synchronizer, the reverse and crawler shift by joint sleeve.
变速器具有九前一倒档,主变速器4个前进档采用ZF-BK型短行程同步器换档,副变速器采用锁环式同步器换档,爬档和倒档采用接合套换档,差速器同时驱动前后桥,其输出轴与输入轴旋向相同。
-
Driving Route:Head for the east at Shuangjing Bridge in east third ring road;turn around at second traffice lights seeing a Carrefour ahead and drive to the sideroad after 50 meters;Vehicle entrance will be on your right side after 50 meters driving.
开车:东三环双井桥向东转直行,第二个红绿灯掉头后行驶50米进辅路,直行50米右侧为九龙花园车辆入口,进门领卡时问一下门卫9号楼在哪里即可,楼前有停车位。
-
Then brief the basic situation of the finite element analysis method and the spectrum tube design situation.
接着介绍了有限元分析方法的基本情况和光谱简的设计情况;论述了如何用有限元方法对系统进行静力分析,如何进行前处理和定义作业参数,如何用计算出的结果对设计进行评估:并对光谱筒系统中的导轨板、桥和下平台进行了有限元分析。
-
A Some environmentalists are against the project on biological grounds.D They're what will keep the bridge from going anywhere.F They will tip up the scales at 166, 500 tons more than half the bridge's total mass.It is not just their length totally 5.3 kilometers but their weight.
F。 分析:思路特点:注意空格后句中的词语使用特点:空格前出现了their length, their weight,因此判断their可能指"桥",剩下的选项中:F中提到了有关重量的数据166, 500 tons,因此F是答案。
-
A some environmentalists are against the project on biological grounds.d they're what will keep the bridge from going anywhere.f they will tip up the scales at 166, 500 tons – more than half the bridge's total mass.it is not just their length –totally 5.3 kilometers – but their weight.
f。 分析:思路特点:注重空格后句中的词语使用特点:空格前出现了their length, their weight,因此判定their可能指"桥",剩下的选项中:f中提到了有关重量的数据166, 500 tons,因此f是答案。
-
The evaluation method is applied to assess the remaining fatigue life of highway existing continuous steel truss bridge which includes primary and strengthening structure.
将论文建立的剩余寿命评估方法应用于既有公路连续钢桁梁桥加固前、后的剩余寿命评估,获得了一些有益的结论。
-
The static loads were simulated according to the restored and unrestored situation. The stress distribution and stress level of the second molar was recorded.
并在修复前对两个基牙加载,修复后对固定桥进行加载,观察第二磨牙牙槽骨的应力分布变化情况。
-
Their synchronized waddle could have caused the bridge to oscillate, leading even more of them to tread in tandem.
他们步调一致的来回走动可能导致了前禧桥的振荡,这又使得这些行人的步伐更加的一致。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。