英语人>网络例句>分层的 相关的搜索结果
网络例句

分层的

与 分层的 相关的网络例句 [注:此内容来源于网络,仅供参考]

Such as port-wine stain can be layered vascular laser will be removed, usually the effect of 1,2 times the most significant, up to 50-60%, followed by more deep residue of blood vessels, treatment effects will be reduced, usually takes up to Treatment of 7-10 times.

如葡萄酒色斑可以用激光光将血管分层去除,通常第1、2次效果最显著,可达50-60%,之后因残留的血管愈来愈深,治疗效果会递减,通常需要高达7-10次治疗。

Layered canopy above the main entrance of the Department of mountain flowers made of overlapping circles and triangles, using both sides of the door leaning columns and flat pilasters.

正门上面分层檐部和山花做成重叠的弧形和三角形,大门两侧采用了倚柱和扁壁柱。

Quoting in the fast formation technology in the lamination principle, has solved this problem that the carves-milling machine processes insufficient depth, and remedied the carves-milling machines shortcomings in processing, expanded the application scope in profiling manufacture of the carves-milling machine.

引用快速成型技术中分层制造原理,解决了雕铣机在压型制造中加工深度浅这一问题,弥补雕铣机加工缺点,扩大了雕铣机在压型制造中的应用范围。

In order to prevent stratification of concrete, concrete did not dare to die after the full vibration, a large number of bubbles do not come out schedule would lead to hardening the surface of concrete structure surface cellular Ma.

为了防止混凝土分层,混凝土入模后不敢充分振捣,大量的气泡排不出来,也会导致硬化混凝土结构表面出现蜂窝麻面。

One cycle of operation to take Silo body construction, the construction procedure as follows: steel banding to Silo body gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after Silo body pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

One cycle of operation to take construction, the construction procedure as follows: steel banding to gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

Otherwise, we use GPM to compute the reflection and transmission coefficient of loss anisotropic media.

另外,用广义传播矩阵法计算了分层有耗各向异性介质的反射和透射系数。

Concerning with the selection of the ways of calculation the thesis indicates all of them including layerwise summation method, double curve method and logarithm curve method can meet the demands of the projects.

在研究课题对于计算方法的选择,认为分层总和法、双曲线法和对数曲线法均能满足工程需要。

This split-level house is for rent.

这幢房子是分层出租的。

This split-level house is for rent.

这所分层平房是出租的。

第48/100页 首页 < ... 44 45 46 47 48 49 50 51 52 ... > 尾页
推荐网络例句

I didn't watch TV last night, because it .

昨晚我没有看电视,因为电视机坏了。

Since this year, in a lot of villages of Beijing, TV of elevator liquid crystal was removed.

今年以来,在北京的很多小区里,电梯液晶电视被撤了下来。

I'm running my simile to an extreme.

我比喻得过头了。