冶炼厂
- 与 冶炼厂 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Other concentrates will be taken to Chambishi Copper Smelter, a joint venture between China Non-ferrous Metal Mining and Yunnan Copper Industry.
剩余的铜精矿将运往由中国有色金属矿业公司和云南铜业公司合资成立的Chambishi铜冶炼厂进行加工。
-
This paper introduces in detail the application of S1200-16 type air-blower in Northern Copper Smelter, expounds the structure and technical parameters of S1200-16 type air-blower , and puts forward some treating measures for guaranteeing the normal operation of the air-blower .
详细介绍了S1200—16型鼓风机在北方铜业冶炼厂的使用情况,以及S1200—16型鼓风机的结构、技术参数,提出了为确保风机的正常运行所采取的处理措施。
-
Therefore, starting in November, the China's third largest copper prices started the largest early-warning mechanisms, Yang Chao-yun led rushed major copper smelter and mines, take three measures to tide over the severe winter.
因此,从11月起,在中国第三大铜价格开始最大的预警机制,杨照云领导赶到主要铜冶炼厂和矿山,接管严冬三项措施,渡过难关。
-
Minister of the Propaganda Department of Yunnan Copper Group Gong Xuchun told reporters, in order to halt falling profits, cloud of copper from copper smelter strike decision.
宣传部部长部云南铜业集团龚需醇告诉记者,为了制止利润下降,从铜冶炼厂罢工的决定云铜。
-
The process design, equipment level and commissioning of technical modification project for acid-making with copper converter gas from the smelter of Daye Nonfer-rous Metal Corporation are highlighted in this paper.
介绍了大冶有色金属公司冶炼厂铜转炉烟气制酸技改项目的工艺设计、装备水平,以及试车投产情况。
-
The copper anode slime produced in one copper smelter domestically was pre-treated with pressure acid leaching method and the leaching behavior of copper,tellurium and selenium in copper anode slime was studied.
以国内某铜冶炼厂所产的铜阳极泥为原料,采用加压酸浸的方法对该铜阳极泥进行预处理,对铜阳极泥中铜、碲、硒等元素的浸出行为进行了研究。
-
The copper slag of smelter was treated, that is, changed its particle shape and particle size distributi- on, to replace river sand compounding liquid concrete.
将冶炼厂的废弃铜渣经过加工处理,改变粒径形态和颗粒级配,以替代河砂配制流态混凝土,不但可以缓解混凝土细骨料资源日趋紧缺的矛盾,降低支护成本,而且可以消除铜渣堆积造成的环境危害。
-
According to environmental situations in construction site of ISA furnace in Chambishi copper smelter of Zambia the composite foundation combined with manual hole digging pile and root pile is adopted.
根据赞比亚谦比希铜冶炼厂艾萨炉施工现场环境的实际情况,综合考虑多方面因素后采用了人工挖孔桩结合树根桩的复合式基础,并详细介绍了该种复合式基础的设计过程及施工工艺,可供同类型工程借鉴。
-
Yunnan Copper Group, the Propaganda Department of the Minister Gong Xuchun told reporters, in order to halt falling profits, cloud of copper from copper smelter decision to gain the upper hand.
云铜集团宣传部部长龚续春告诉记者,为止住利润下滑,云铜决定先从铜冶炼厂下手。
-
Guixi Smelter, Jiangxi Copper Corp., Guixi 335424, China
江西铜业公司贵溪冶炼厂,贵溪 335424
- 推荐网络例句
-
They weren't aggressive, but I yelled and threw a rock in their direction to get them off the trail and away from me, just in case.
他们没有侵略性,但我大喊,并在他们的方向扔石头让他们过的线索,远离我,以防万一。
-
In slot 2 in your bag put wrapping paper, quantity does not matter in this case.
在你的书包里槽2把包装纸、数量无关紧要。
-
Store this product in a sealed, lightproof, dry and cool place.
密封,遮光,置阴凉干燥处。