英语人>网络例句>全长 相关的搜索结果
网络例句

全长

与 全长 相关的网络例句 [注:此内容来源于网络,仅供参考]

But suddenly he gave a shudder, staggered from the tree, and like a scythed thistle fell full length on his face and moved no more.

但是他突然作了发抖,交错的树木、而像scythed蓟下跌全长脸上并没有提出更多。

She sprinted the length of the road.

她全速跑完了那条路的全长

For instance, stonewalls can either can either be parallel to the driveway along its full length, or meet it perpendicularly at the entrance.

比如,可以蒙蔽人可以平行沿全长行车、它垂直或站在门口迎接。

It stretches on 360 kilometers (225 miles).

全长360公里,225英里。

Length of 2,700 km, many tributaries, is a large river system.

全长2700公里,支流很多,是一庞大的水系。

In addition, the sections of the bridge had to be winched into position over expanses of quicksand-like mudflats.

耗资达118亿元人民币的这座大桥全长36公里,南起宁波,北至浙江嘉兴,它把上海和宁波之间的车程从4个小时缩短到2个半小时。

It is 8,346 metres long.

全长8,346米。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The 918-metre Magdeburg Water Bridge, is a navigable aqueduct water bridge in Germany, completed in October 2003. It bridges the River Elbe to connect two important German shipping canals; the

该桥全长918米,建成于2003年10月,是一座跨越易北河的渠道桥,它连接了易北-哈维尔运河与米特兰德运河这两大航道。

By Nothern blot, this gene band located between 1383-1908bp maker, length of which was same with different gene obtained by subtractive hybridization. The results showed that the obtained wnt6 gene was a cDNA fragment with full open reading frame, which could be useful for further studies.

提取样本总RNA,与地高辛标记的Wnt6探针进行杂Northernblot杂交,结果阳性杂交带位于1383-1908bp处,与差异片段大小一致,验证了该基因确为全长cDNA片段,具有完整的开放读框,可以用于进一步研究。

第37/51页 首页 < ... 33 34 35 36 37 38 39 40 41 ... > 尾页
推荐网络例句

Do you know, i need you to come back

你知道吗,我需要你回来

Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.

1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。

Chapter Three: Type classification of DE structure in Sino-Tibetan languages.

第三章汉藏语&的&字结构的类型划分。