保护设备
- 与 保护设备 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .
如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
B A branch circuit to which the equipment is intended to be connected supplies the receptacle or cord connector in the equipment and is provided with overcurrent protection greater than the current rating associated with the slot or pin configuration of the receptacle or cord connector.
a 插座或接线端子是二级变压器的一部份元件 b 连接插座或接线端子分支电路设备,在设备中用于连接插座或接线端子必须有过流保护,电流等级关联线槽及针脚式插座或接线端子。
-
It also discusses the choice of main wiring, high pressure equipment and all kinds of the protection of relay, the calculation of load, short current and so on in detail, especially, the choice of main wiring, transformer and some electric equipment such as circuit breaker, current and Voltage sensor.
文中对主接线的选择、高压设备的选择、负荷计算、短路电流计算,各种继电保护选择和整定计算皆有详细的说明。特别对主接线的选择,变压器的选择,还有一些电气设备如断路器、电流互感器、电压互感器等的选择校验作了详细的说明和分析。
-
It discusses the choice of main wiring, high pressure equipment and all kinds of the protection of relay, the calculation of load, short current and so on in detail, especially, the choice of main wiring, transformer and some electric equipment such as circuit breaker, current and Voltage sensor.
文中对主接线的选择、高压设备的选择、负荷计算、短路电流计算,各种继电保护选择和整定计算皆有详细的说明。特别对主接线的选择,变压器的选择,还有一些电气设备如断路器、电流互感器、电压互感器等的选择校验作了详细的说明和分析。
-
My company can provide users with the U.S. sewage machinery, Pai sand, mud, charge-offs charge-offs residue oil machinery, centrifugal blowers, mechanical aeration to the brush, sludge treatment machinery, super-efficiency flotation equipment, bag filter , Electrostatic precipitators, wet dust collector, cyclone, etc. more than 80 varieties, more than 600 kinds of models of the Environmental Protection complete sets of equipment.
我公司可为用户提供拦污机械、排砂、排泥、撇渣撇油机械、离心鼓风机、转刷曝气机械、污泥处理机械、超效气浮设备、袋式除尘器、静电除尘器、湿式除尘器、旋风除尘器等八十多个品种、六百多种型号的环境保护成套设备。
-
The protection grounding for electrostatic grounding and electrical equipment of the process equipment adopt bolts to connect earth grounding wire with parallel lines but not series lines.
工艺设备的静电接地和电气设备的保护接地采用螺栓与接地干线并联,严禁串联。
-
Surge arresters are used to protect input and output modules in IT systems from being destroyed.
为了保护信息技术设备的输入和输出端设备,防止其被过压损毁,也要使用电涌避雷器。
- 推荐网络例句
-
This one mode pays close attention to network credence foundation of the businessman very much.
这一模式非常关注商人的网络信用基础。
-
Cell morphology of bacterial ghost of Pasteurella multocida was observed by scanning electron microscopy and inactivation ratio was estimated by CFU analysi.
扫描电镜观察多杀性巴氏杆菌细菌幽灵和菌落形成单位评价遗传灭活率。
-
There is no differences of cell proliferation vitality between labeled and unlabeled NSCs.
双标记神经干细胞的增殖、分化活力与未标记神经干细胞相比无改变。