主梁
- 与 主梁 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In order to guarantee main beam scabbed bridge long-term secure use, I systemly research stress instance of new and old bridge joint face.
为了保证主梁拼接的桥梁长期安全的使用,对拓宽后桥梁的主梁及新旧主梁连接面的受力情况进行系统的研究。
-
The structural design is carries on the design calculation after the plan comparison and appraisal recommendation plan, this stage design primary mission is: The design material analysis and the structure arrangement, the king post endogenic force computation, the pre-stressed steel ties the estimate and the arrangement, the computation king post section geometry characteristic, the steel tie the loss of prestress computation, the king post section intensity checking calculation, the king post nose partial bearing strength checking calculation, the king post distortion checking calculation and part compositions and so on lane board computation.
结构设计是根据方案评比后的推荐方案进行设计计算,这一阶段的设计主要任务是:设计资料分析及构造布置、主梁内力计算、预应力钢束的估算及其布置、计算主梁截面几何特性、钢束预应力损失计算、主梁截面强度验算、主梁端部的局部承压强度验算、主梁变形验算和行车道板计算等部分组成。
-
Fault condition includes the descent of cable force, sinkage of bridge tower and structure change of the main girder. Data recorded are cable force, girder stress, girder linetype, frequency response function, mode shape and etc.
其中损伤的形式有索力下降、主梁局部刚度变化以及桥塔不均匀沉降等,监测的参数主要有拉索索力、桥面线型、主梁应变等静态参数以及主梁固有频率、频响函数和振型等动态参数。
-
For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.
对于钢桁梁,用国外的"桥面吊机杆件拼装法",由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥"自行式跨缆吊机荡移"架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。
-
In this paper, according to the construction technique features of the main girder of Yamen Bridge, the process of construction with the guyed traveler is established and the issues regarding the selection of the guy construction schemes and de...
根据崖门大桥主梁施工工艺的特点,建立了牵索挂篮施工模拟计算的流程,并对牵索方案的选择以及主梁立模标高的确定等问题进行了探讨。在此基础上,给出了崖门大桥主梁的施工流程及其计算结果。
-
Proceeded for beam strength and stress; analysis and checking calculations are made of Traverse beam and surface plate.
将所推荐桥梁进行了全面的计算分析,利用横向分布系数确定活载分布,求得上部结构主梁的内力,从而确定主梁配筋,然后进行主梁强度和应力验算,并分析验算了横梁和桥面板。
-
The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.
在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。
-
For partially prestressed concrete I or T girder bridge,there is no sufficient stiffness owing to damage like prestress loss and cracks etc. The experiments of original and reinforced girders have been proved that the effect is remarkable to apply steel and concrete composite reinforcement method.
部分预应力混凝土I型或T型梁桥,由于预应力损失、裂缝损伤等造成主梁正常使用状态下刚度不足,采用钢-混凝土组合加固主梁,通过原梁及加固梁的加载试验,表明加固效果十分显著。
-
The tower plate utilizes stainless steel double bottom plates welded main beam ,by which welding deformation can be reduced,straight linear degree can be guaranteed, main beam rigidity as well as entire beam stability can be strengthened to resist horizontal orientation live load,and tower height can be lowered as well.
塔盘用不锈钢双腹板焊接主梁,能够减小焊接变形、保证主梁的直线度、增强主梁抗水平方向动载荷的刚性和主梁的整体稳定性、降低塔体高度。
-
Aiming at calculation of the equivalent rigidity of truss stiffening girder in an aeroelastic model design of a long-span suspension bridge with truss stiffening girder,Aizhai bridge,a super-long -span suspension bridge across deep valley with single span,was taken as an example for investigation.
针对大跨度桁架加劲梁悬索桥气弹模型设计中主梁等效刚度计算问题,以矮寨大桥为实例,建立不同长度空间桁架加劲梁节段模型有限元模型,通过悬臂梁位移法反算得到主梁的等效刚度特性,研究了不同荷载施加方式以及不同梁段长度对等效刚度特性的影响。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?