主应力
- 与 主应力 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
During the peak stage of the deformation under high stress environment, mass medium fracture and sticky slip will appear in cracks, and they are represented as solid tides anomalies in the records of clinometer.
大地震在主破裂前往往行成地壳变形,高应力作用下进入峰值后的变形阶段,常有大量介质破裂及裂隙间的粘滑产生,反映到地倾斜记录仪上,表现为固体潮形变异常。
-
In this paper, the analytical expressions of seismic input for homogeneous elastic half-space are first derived in oblique incidence of plane SV-wave, and then a finite element model for a real hydropower cavern group composed of main powerhouse- transformer chamber- tailrace surge tank cavern is created. Characteristics of seismic responses such as displacement, acceleration and stress are studied in detail at different incidence angles and some results are compared with those given by the literature.
本文首先推导了平面SV波斜入射下均质弹性半无限空间的地震动输入表达式,然后建立了某水电站主厂房室-主变室-尾水调压室等构成的地下洞室群有限元模型,详细研究了不同入射角度下各洞室的位移、加速度、动应力等地震反应特点,并与文献进行了对比。
-
The direction of the principal compressive strain obtained in the paper is well consistent with the principal compressive stress axes derived by the geological and seismological methods.
用本文方法得到的主压应变方向与地质学方法和测震学方法得到的主压应力轴方向具有很好的一致性。
-
To validate the FEM calculations of the cylinder block of a six-cylinder in-line diesel engine,the dynamic strain-stress and temperatures of the main bearing wall s and caps were measured on engine testbed with strain-gauge and resistance thermometer.
为评估某直列6缸柴油机缸体有限元强度分析结果,采用应变电测法实测了该发动机缸体上可能的危险部位主轴承座、主轴承盖动态应力以及这些部位的温度。
-
It calculates the main cable, suspender and other components in unstressed length, and initial installation location of the main cable and cable clamps.
计算主缆、吊索等部件的无应力长度和主缆、索夹的初始安装位置。
-
Such as: how to better play to high-performance concrete properties; how to avoid temperature changes, shrinkage and creep of concrete, foundation, uneven settlement and so on; how to ensure that close up before the end of the vertical deflection of the cantilever 2 and the main beam axis deviation of the lateral shift does not exceed the permissible range; how to ensure that folded after the bridge linear positive; how to avoid the construction of the main beam and so there have been a big stress.
如何更好地发挥高性能混凝土性能;如何避免温度变化、混凝土收缩徐变、地基不均匀沉降等的影响;如何保证合拢前两悬臂端竖向挠度的偏差和主梁轴线的横向偏移不超过容许范围;如何保证合拢后的桥面线形良好;如何避免施工中主梁截面出现过大的应力等。
-
The main beam of car dumper roller is made a important transformation using tensile bar, using the other method auxiliary, we solve thorough the problem of main beam break due to stress focus , Operation practice shows that after transformation, the item is a great success.
介绍秦皇岛港煤码头四期工程翻车机系统的技术改造项目,其中翻车机钢结构的主梁部分采用拉杆结构,辅之以其他方法,彻底解决了应力集中导致的主梁断裂问题,实践表明,改造获得了成
-
The entire Superstructure cross-section, except for traffic barrier, shall be considered to be placed at one time for purposes of determining support requirements and designing falsework girders for their stresses and deflections, except as follows: For concrete box girder bridges, the girder stems, diaphrams, crossbeams, and connected bottom slabs, if the stem wall is placed more than 5 days prior to the top slab, may be considered to be self supporting between falsework bents at the time the top slab is placed, provided that the distance between falsework bents does not exceed 4 times the depth of the portion of the girder placed in the preceding concrete placements.
整个上部结构截面除交通障碍,应被视为在一个确定的要求和支持他们的设计应力和挠度除,脚手架时间放在梁的目的如下:对于混凝土箱形梁桥,主梁茎,diaphrams,横梁,和连接底板,如果干墙放置超过5天前向顶板,可能被认为是自我支持之间的脚手架本茨当时顶端板放置,只要脚手架茨之间的距离不超过4倍,在前面的混凝土主梁部分存款放在深度。
-
Constraint of the middle truss on the crossbeams approximates to absolute rigidity and the distance between the stringer and the middle low chord are small in the four-line through truss bridge with three main trusses, which produces much larger horizontal bending stresses of the crossbeams as compared with two-truss bridges.
在四线铁路三主桁下承式钢桁梁桥中,中桁对横梁的约束近于绝对刚性,纵梁离中桁下弦杆的距离较小,使横梁的面外弯曲应力较二主桁桥梁大得多。
-
The paper describes how the local force of the main web is considered as the force caused by the Contact pressure among the trolley wheel, rail and top flange, and how the contact analysis model for the local force is built by means of both Hertz theory and finite element software ANSYS combined. Also, it analyzes the variation of the local stress under the different conditions and comes to a conclusion, and compares the results derived from the experimental formula with the result from ANSYS.
本论文的主要内容:将Hertz接触理论和有限元软件ANSYS结合起来,把主腹板的局部受力问题视为小车轮与轨道及轨道与上翼缘板之间发生接触行为作用下的受力问题,建立了小车轮压作用处偏轨箱形梁主腹板局部受力的接触分析模型,研究不同情况(小车轮压、箱形梁几何参数和轨道截面惯性矩)下局部应力的变化规律,得出相关结论;最后将经验公式解与ANSYS数值解进行对比分析论证。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?