为...装甲
- 与 为...装甲 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The thickness of the glacis plate was 120 mm, and the turret was 290 mm thick.
倾斜车体的装甲厚度为120mm,炮塔装甲厚度为290mm。
-
Panzer Elite Jager Kommand and Support Kommand costs increased from 220mp/20fuel to 220mp/30fuel.
装甲精英的装甲歼击指挥部和装甲支援指挥部造价由220人力/20油料增加为220人力/30油料。
-
The front and back of the composite plate is made of armor steel and in the middle is ceramic.
其中层合板的面板和背板均为装甲钢,中间为3层氧化铝陶瓷。
-
The front armor was 150mm thick and sloped at an angle of 50 degrees.
正面的装甲厚150毫米倾角为50度,侧面的装甲厚80毫米倾角为25度。
-
Armour rods (to be installed in suspension clamps) Parallel clamps Sub-Total, items 4.1-4.7 OTHER HARDWARE Counterweights for jumper or suspension insulator strings, including necessary device for attachement 50 kg 100 kg Sub-total, item 5.1 – 5.3 SPARES Insulator Units Type U160 Type U210BS Hardware for Conductor ACSR-BISON Complete set of hardware and fittings for suspension string Complete set of hardware and fittings for tension string Complete set of hardware and fittings for jumper string Complete set of hardware and fittings for transposition string Extra suspension clamps Extra tension clamps Extra tension joints Extra repair sleeves Extra vibration dampers Extra armour rods Extra spacers: for span for jumper alternatively spacer dampers Hardware for Earthwire 7 No. 6 AWG Complete suspension set Complete tension set Vibration dampers, Stockbridge type Extra tension clamps Extra tension joints Extra vibration dampers Extra parallel clamps Extra armour rods Hardware for Earthwire 7 No. 6 AWG Complete suspension set Complete tension set Vibration dampers, Stockbridge type Extra tension clamps Extra tension joints Extra vibration dampers Extra parallel clamps Extra armour rods Sub-Total, items 6.1-6.4 Sub-total, Items 1.4, 2.7, 3.8, 4.8, 5.4 and 6.5 Transfer to Summary, Schedule AS-1
装甲棒 平行夹具小计,项目4月1号至4月7号其他硬件重物跳线或中止绝缘子串,包括必要的设备attachement 50公斤 100公斤小计,项目5月1号至5月3号备件绝缘子单位型U160 类型U210BS 硬件导体钢芯铝绞线,拜森一套完整的硬件和配件的暂停字符串一套完整的硬件和配件的紧张字符串一套完整的硬件和配件的跳投字符串一套完整的硬件和配件的转字符串额外的悬浮夹额外的紧张局势夹额外的紧张关节额外的修理袖子额外的振动阻尼器额外的装甲棒额外的间隔:为跨度跳线或者间隔减震器硬件Earthwire 7特设工作组第6号完整的悬挂设定一套完整的紧张局势振动阻尼器,斯托克型额外的紧张局势夹额外的紧张关节额外的振动阻尼器额外的平行夹具额外的装甲棒硬件Earthwire 7特设工作组第6号完整的悬挂设定一套完整的紧张局势振动阻尼器,斯托克型额外的紧张局势夹额外的紧张关节额外的振动阻尼器额外的平行夹具额外的装甲棒小计,项目6月1号至6月4号小计,项目1.4 , 2.7 , 3.8 , 4.8 , 5.4和6.5 (换乘摘要,附表1 仅供参考
-
At this time the USSR was forced to take extreme measures to accelerate the development of its own defense industry, to re-equip the Armed Forces and for subsequent improvement of their combat capability.
此时苏联开始加速发展自己的国防工业,为装甲部队换装以提高自身的战斗能力。
-
Based on characteristic of evaluation, the multi-level fuzzy evaluation method is used and the mathematical model is described in brief. All these lay the foundation for study and improve on tank driver cabin...
根据其特点,选用并简要介绍了评价数学模型,为装甲车辆驾驶舱人机界面匹配综合评价研究奠定了基础,为分析改进装甲车辆驾驶舱人机界面的设计质量提供了一种可操作的定量化方法。
-
Virtually destroyed at the Battle of Stalingrad late in 1942, the 1st Armoured Division was re-formed during 1943 and returned to the field early in 1944, only to be eventually destroyed once more, this time while serving on the side of the Allies in Eastern and Central Europe at the end of the war (a 2nd Armoured Division, scheduled to be created from the elements of the 8th Cavalry Division in the summer of 1944 was never formed, while two divisions raised by the Soviets from re-educated Romanian prisoners of war were also rebuilt into armoured and motorised formations after the war but as such fall outside the scope of this report).
在1942年后期在斯大林格勒战役中被摧毁的第一装甲师于1943年重新组建,并于羿年重返战场,不过这次仍未能免除被消灭的命运,所不同的是这次是在苏联人的领导下(于1944年夏天以第八骑兵师的班底组建的第二装甲师的计划泡汤了,但苏联人在战后却建立了2个由受过&再教育&的罗马尼亚战俘组成的师,并将他们改编为装甲和摩托化单位)。
-
We rested until 7.8.41, and were assigned to "Panzergruppe Hoth", who apart from us, consisted of 20. and 18.Panzer-Grenadier-Division (actually, both were still motorizied infantry divisions at this point, they both became Panzer-Grenadier units in 1943 - JP) and 12.Panzer-Division. On 19.8.41 we moved northwards, Smolensk - Vitebsk - Opotska - Nikolajewo - Nowgorodtowards Leningrad, and we stopped about 20km from Leningrad, in the Nevaarea, with the task to form a bridge-head.
一直整休到1941年8月7日,此后我们隶属&Hoth装甲集群&,除了我们之外,还包括第18,20装甲掷弹兵师(事实上当时这两支部队还都只是摩托化步兵师,要等到1943年才整编为装甲掷弹兵师)和第12装甲师。1941年8月19日,我们一路朝北,沿着Smolensk -维捷布斯克- Opotska - Nikolajewo -诺夫哥罗德一线向列宁格勒进发。
-
For the IS-2 the discrepancies are even greater: both Jentz and Red Steel have a maximum armour of 160mm (Jentz provides a breakdown of the armour which agrees with the Russian Military Zone everywhere but the mantle) while the Russian Military Zone and actual measurements of an IS-2 show a maximum armour of 120mm and 127mm, respectively.
这个网站对IS-2的装甲厚度参考了四个来源,其中两个来源称IS-2的最大装甲厚度为160mm,Jentz甚至提供了实际的装甲破片,但Russian Military Zone否定了他们对炮盾的说法。
- 推荐网络例句
-
Do you know, i need you to come back
你知道吗,我需要你回来
-
Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.
1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。
-
Chapter Three: Type classification of DE structure in Sino-Tibetan languages.
第三章汉藏语&的&字结构的类型划分。