不合格
- 与 不合格 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Results The morbidity of oculopathy in different arm of the service all stepped up, the main diseases included the sight feel unqualified, conjunctivitis,retinal optimum denaturation, lattice degeneration of peripheral retina, dried slit pores of retina,traumatic oculopathy, et al. But the morbidity of xerophthalmia, oculi hypertonia or glaucoma decreased; the morbidity of traumatic oculopathy in infantry, strain arm and ground artilleryman was higher than other arms, the morbidity of xerophthalmia and occaecatio was higher, the morbidity of sight feel unqualified, conjunctivitis, xerophthalmia and occaecatio was higher too.
结果 所有兵种在视力不合格、结膜炎、沙眼、视网膜良性变性、周边视网膜格子样变性、视网膜干性裂孔以及外伤性眼病等方面均有不同程度的升高,而在干眼症、高眼压或青光眼方面均有不同程度的降低;步兵、特种兵以及地炮兵中外伤性眼病的发病率较高,装甲兵、坦克兵中干眼症以及眩光的患病率较高,驾驶兵中视力不合格、结膜炎、干眼症以及眩光等疾病患病率较高。
-
As required by the automobile and motorcycle industry for enhance the quality of parts manufacturing, especially the "zero defect" was proposed, the sample testing by traditional technique has been unable to meet the requirement, to be instead of the entireness testing which testing the quality of parts manufacturing one by one. That means can check the quality after the parts manufacturing finished, removing the defect parts in time to avoid go to the next working procedure.
随着汽摩制造业对零件加工质量要求的提高,特别是零件加工质量"零缺陷"的提出,传统的零件抽样检测方式已不能满足要求,取而代之的是对每个零件的加工质量逐个进行检测的完全检测方式,即在零件加工完毕后能对其加工质量合格与否进行快速判别,及时将不合格零件剔除,避免其流入下道工序。
-
Issuing quarantine certificates or tagging the quarantine label to animals or animal products which have not been quarantined on the spot or fail to pass quarantine inspections, or refusing to issue such certificates or tag such label to animals or animal products which have passed quarantine inspections
对未经现场检疫或者检疫不合格的动物、动物产品出具检疫证明、加施检疫标志,或者对检疫合格的动物、动物产品拒不出具检疫证明、加施检疫标志的
-
The optimized formula was gained by orthogonal test as follows: 80 g/L of meta-nitrobenzine sodium sulfonate,37.5 g/L of monoethanolamine,30 g/L of glycine,4.5 g/L of sodium thiosulfate and 0.03 g/L of lauryl sodium sulfate.
1前言尽管电镀技术愈来愈先进,但是出现不合格镀层总是难免的,因此,不合格镀层的退除和重新施镀,对资源的再生与合理应用具有重要意义。
-
The organization shall take action to eliminate the cause of nonconformities in order to prevent recurrence.
组织应采取措施,消除不合格的原因,防止不合格的再发生。
-
Top management should empower people in the organization with the authority and responsibility to report nonconformities at any stage of a process in order to ensure timely detection and disposition of nonconformities.
最高管理者应当赋予组织内人员相应的权限和职责,以使其报告在过程的任何阶段出现的不合格,从而确保及时地查明和处置不合格。
-
The production examination management function of the system may promptly warn the workers of the uncertified product to prevent the uncertified product to inflow into the next working procedure or to leave the plant.
系统的生产检验管理功能可以及时地对不合格产品作出报警,防止不合格产品流入下一道工序或出厂。
-
B. the seller looks for the professional shipping company , handles the transportation of goods on behalf of the buyer and tranport the goods to the designated ports (the buyer is responsible for sea freight, insurance premium, file charges, etc),inspection should be carried out within the date of the lading,the acceptance criteria.is that: the tolerance of ±1.5cm of (waist ,thigh,hips,knee,foot ,outseam)and ±0.5cm of front rise and back rise in accordance with the the size of the table in Annex I, II, III.
b。乙方代甲方寻找专业海运公司办理货物运输,将货物运到指定口岸(海运费、保险费、文件费等甲方负责)。提货当日内进行检验,以附件尺寸表一、二、三的大围(腰、脾、坐、膝、脚、外长)±1.5公分和前、后浪±0.5公分接受之误差作验收标准,必须达到全部合格方视为合格;如甲方检验不合格则于次日起2 个工作日之内以书面形式提出异议并附加对不合格货品的处理建议,乙方收到甲方书面异议后必须在两日内回复,否则视乙方默认甲方的处理建议,双方按该建议执行。
-
When one item is unqualified, the sample is not qualified. If type inspection is not qualified, additional sampling can be done in the same batch, if unqualification still exists, this batch samples are not qualified.
6.8 检验项目一项不合格,判定样品不合格,若型式检验不合格,允许在同一批次中加倍抽样,仍不合格,判定该批次控制器为不合格。
-
2 Removal of 39.1 Improper Work, Materials or Plant The Engineer shall have authority to issue instructions from time to time, for: the removal from the Site, within such time or times as may be specified in the instruction, of any materials or Plant which, in the opinion of the Engineer, are not in accordance with the Contract, the substitution of proper and suitable materials or Plant, and the removal and proper re-execution, notwithstanding any previous test thereof of interim payment therefore, of any work which, in respect of materials, Plant or workmanship, or design by the Contractor or for which he is responsible, is not, in the opinion of the Engineer, in accordance with the Contract.
工程师有权随时发出指令:在指令规定的时间内一次或分几次从现场运走工程师认为不符合合同规定的任何 34 不合格工 39.1 程,材料或设备的拆除和运走材料或设备;用适用合格的材料或设备取代原来的材料或设备;对尽管先前已进行过检验或中间支付,但工程师认为材料,设备或施工工艺,或由承包人本身进行的或由其负责设计的不符合合同规定的工程拆除并重新施工。
- 推荐网络例句
-
In the negative and interrogative forms, of course, this is identical to the non-emphatic forms.
。但是,在否定句或疑问句里,这种带有"do"的方法表达的效果却没有什么强调的意思。
-
Go down on one's knees;kneel down
屈膝跪下。。。下跪祈祷
-
Nusa lembongan : Bali's sister island, coral and sand beaches, crystal clear water, surfing.
Nusa Dua :豪华度假村,冲浪和潜水,沙滩,水晶般晶莹剔透的水,网络冲浪。