英语人>网络例句>下部结构 相关的搜索结果
网络例句

下部结构

与 下部结构 相关的网络例句 [注:此内容来源于网络,仅供参考]

The molding is concinnity and the structure system is definite. Through the research of the problems about the structure system, static and dynamic character, and the bear rigidity of the under structure, this paper presents t...

本文通过对该屋盖结构的受力体系、静力和动力特性以及下部结构的支承刚度等问题进行研究与分析,提出此类大跨大悬挑结构在分析与设计过程中应注意的问题,并对部分关键节点设计进行介绍。

Vibration-isolated structure is such a new type structural system which can satisfy above demand by dividing the structure into three parts: upper structure, vibration-isolated layer and subjacent structure.

隔震结构正是一种能满足上述要求的新型结构体系,它通过设置隔震层,将结构分为上部结构、隔震层和下部结构三部分,地震能量经由下部结构传到隔震层,由隔震层的隔震装置吸收并消耗主要能量后,仅有少部分能量传到上部结构。

Substructure substructure of the bridge structure is set ...

下部结构下部结构是指桥梁结构中设置。。。

Setting isolation layer is a new technology between superstructure and substructure of project, which can reduce earthquake damage.

摘要] 在工程的上部结构与下部结构之间设置隔震层是减轻工程结构地震破坏的新技术。

The main content originally designed includes hydrology to calculate, Liang Qiao calculates in top structural design, the underpart structural design is calculated.

本设计的主要内容包括水文计算,梁桥上部结构设计计算,下部结构设计计算。

From the function needing of the building, the top needs small axis dimension which has to be assigned, the next function part hopes that there is as big as possible free space, it is heavy for network to take post, for satisfying building the requests of function, the structure must be by fixing up contrary to routine way, in order to realize that this kind fixes up, must set up a special floor between the underpart in structure forms are different, make it bear top the internal force of structure and transmit and give underpart structure to play structure change the floors of function reliable. It is called transfer floor.

从建筑功能的要求上讲,上部需要小开间的轴线布置,下部公用部分则希望有尽可能大的自由灵活空间,柱网要大,为了满足建筑功能的要求,结构必须以与常规方式相反进行布置,为了实现这种布置,就必须在结构形式不同的上下部之间设置一个特殊的楼层,使其能承受上部结构的各种内力,并将其可靠的传递给下部结构,这一能起结构转换作用的楼层,称为转换层。

Bottom structure The plant structure includes lower volute, tail pipes and tail water pier wall structure.

下部结构厂房的下部结构包括蜗壳、尾水管和尾水墩墙等结构。

The numerical results show that serious errors exist in the substructural analysis for the hybrid structure,and the global analysis is necessary for the hybrid structure under the excitation of static loads and seismic loads.

需对其进行较精确的分析。在以往传统结构的计算分析中,为了简化计算,实际工程中往往将结构分开进行分析,如分为上部结构与下部结构,屋盖结构与梁柱体系等。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

第1/7页 1 2 3 4 5 6 7 > 尾页
推荐网络例句

As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.

每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。

Maybe they'll disappear into a pothole.

也许他们将在壶穴里消失

But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.

但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。