英语人>网络例句>下底板 相关的搜索结果
网络例句

下底板

与 下底板 相关的网络例句 [注:此内容来源于网络,仅供参考]

The next thing he found out was that if he put his hand between the rays and a photographic plate,the rays could print a shadow of a bony framework of his hand on the plate.

他发现的下一件事是,如果他把他的手放在这种射线和照相的底板之间,这种射线可以把他手的骨架在照相底板上印出一个影子。

Based on modeling test in water tank, this paper employed three different iron blocks to model water-bearing bodies and enclosed plastic pipes or rounded wood strips to model roadways. It gave physical modeling of water-bearing bodies in the working face floor with parallel Bipole-Dipole method, made analysis on the character of electrical field and the law of apparent resistivity changing when the low resistivity abnormity bodies were placed flatly close to water level under semi-space condition and were placed flatly, vertically or aslope to the water level under whole-space condition.

本文以三种不同规格的铁块模拟含水体,以密闭的塑料管或木块条模拟巷道,通过水槽模拟实验,采用平行双极—偶极法进行了对工作面底板含水体的物理模拟,分析了低阻异常体铁块在半空间条件下近水面水平放置以及全空间条件下水平、垂直和倾斜放置时的电场特征和视电阻率变化规律。

To install the fixed filler on the corner cabinet, use a ф4.2MM drill to drill a hole on the bottom panel at a place near the fixed filler. Use pneumatic screwdriver to turn at the hole positions to form countersink holes. Use 4*50 self-tapping screws to secure the fixed filler on the bottom panel. Keep

转角柜固定封板的安装,先用ф4.2MM的直钻在柜底板靠近固定封板处打孔,/然后用风批头在打孔处转动几下形成螺钉沉孔,再用4*50的自功钉把封板固定在柜底板上/安装可调脚将柜底保持朝上,然后正面进入50MM画线并装好柜脚座。

Properties of nonlinear buckling deformation of round soleplate with slot structure under concentrated load are studied.

运用MSC.Nastran求解器计算了薄壁圆柱壳在轴向压力作用下的临界载荷、屈曲模态及薄底板在集中载荷作用下的非线性屈曲问题。

The soleplate has been designed to improve agility and acceleration by grading the density of the soleplate, making the heel lighter, minimising the downward force when taking off.

在底板的设计改进分级的底板密度的灵活性和加速,使脚后跟轻,减少了向下的力时起飞。

Based on bond-slip theory, nonlinear contact theory and fluid-structure coupling theory, coupling three dimensional finite element model about plunge pool slabs, water, bedrock and anchor bar is established, limiting dynamic displacement considering phases of stability failure is studied in this paper, the response characteristic of dynamic displacement is analyzed in virtue of prototype observation results, and stability of plunge pool slabs are predicted.

基于粘结滑移、非线性接触及流固耦合理论,建立水垫塘底板、水体、基岩、锚固钢筋的耦合有限元模型,计算不同破坏状态下底板块的极限动位移,结合原型观测结果进行动位移响应特性的分析,从而对水垫塘底板的稳定性进行识别。

Single-needle lockstitch flat bed machine with bottom feed, needle feed and alternating feet and a maximum stitch length of 12 mm. The 867-190020 ECO is equipped with a large vertical hook. With the M-TYPE series a vision has become reality - a platform for medium heavy duty machines creating a new dimension of functionality and flexibility for all kinds of medium -weight applications. The lockstitch flat bed machine class 867, the first model of M-TYPE series, will set new standards.

该机型为采用下送布、针送布和交替压脚上送布的单针锁式线迹平底板缝纫机,最大针距长度为12mm,867-190020 经济型配置了垂直大旋梭。M-系列的推出使得以前的愿景变成了现实一个适用于中厚料加工应用领域集多功能和灵活性于一体的中厚料缝纫机通用平台诞生了。867型锁式线迹平底板缝纫机作为M-系列推出的首款机型,将为缝纫业界设定新的标准。

1 Laid on the observation points, the next gate in the first paragraph and the chamber are in side-dock-type pier and construction of a wide bottom seam laid 8 to each end of the settlement within 24 observation points nails; chamber 14 Fu wall segments are in lock wall at both ends of the floor laid four nails into account the settlement of 56 observation points; settlement nail making use of 40cmФ18 rebar welded copper top round hat hemisphere processed, buried, when coupled with oblique bars welded to the end of plate surface layer and vertical reinforcement, the top highlight the concrete surface, about 1.5 ~ 2.0cm in order to guarantee points are solid.

3.2.1观测点的布设上、下闸首及闸室坞式段均在边墩底板及施工宽缝的两端各布设8个沉降钉计24个观测点;闸室14节扶壁段均在闸墙底板两端各布设4个沉降钉计56个观测点;沉降钉的制作采用40cmФ18螺纹钢顶端焊接镀铜半球圆帽加工而成,埋设时配以斜筋焊接在底板面层及竖向钢筋上,顶端突出砼表面1.5~2.0cm左右,以保证点位稳固。

A software for aided designing bolt of tunnel named ANSYSBOLT was designed on the basis of ANSYS finite element software. In the software environment, bolt supporting model of physical tunnel in tectonic stress field was structured according to physical parameters of coal and rock seam of some working face, and in conditions of different buried depth, bolt supporting structure and pre-tightening force, distributions of stress of surrounding rock of physical tunnel and its displacement were analyzed and calculated by ANSYSBOLT software. Then influence of different buried depth, bolt supporting structure and pre-tightening force on stability of roof and floor of tunnel was analyzed and finally feasible scheme of bolt supporting was gotten according to the analysis result.

在ANSYS大型有限元软件基础上开发了巷道锚杆辅助设计软件ANSYSBOLT;在该软件环境下,根据某工作面煤岩层的物理参数,建立了构造应力场条件下的实体巷道锚杆支护模型,并按照不同的埋藏深度、锚杆支护结构和预紧力条件,经软件分析计算,得出了实体巷道围岩应力及位移分布情况,进而分析了不同埋藏深度、锚杆支护和预紧力条件对巷道顶底板稳定性的影响,最终根据分析结果得出了可行的锚杆支护方案。

It was shown that coal seam floor failure depth of working face 2121 was 32.5 to 5 m, approximately three times as deep as that of shallow working face(in genera l,9.15 to 12.0 m). Coal seam floor failure depth increased with mining depth. Potential risk of water inrush through coal seam floor of working face 2121 is much higher for deep mining than for shallow mining.

试验结果表明:该工作面底板破坏深度为32.5~35 m,比300 m采深以内的工作面实测深度(9.15~ 12.0 m)增加2倍以上,说明随着开采深度的增加,煤层底板采动破坏深度呈明显增大的趋势,因此,在水压和破坏深度二者同时增加的条件下,2121工作面深部煤层开采的突水危险性远远大于浅部煤层。

第2/5页 首页 < 1 2 3 4 5 > 尾页
推荐网络例句

The split between the two groups can hardly be papered over.

这两个团体间的分歧难以掩饰。

This approach not only encourages a greater number of responses, but minimizes the likelihood of stale groupthink.

这种做法不仅鼓励了更多的反应,而且减少跟风的可能性。

The new PS20 solar power tower collected sunlight through mirrors known as "heliostats" to produce steam that is converted into electricity by a turbine in Sanlucar la Mayor, Spain, Wednesday.

聚光:照片上是建在西班牙桑路卡拉马尤城的一座新型PS20塔式太阳能电站。被称为&日光反射装置&的镜子将太阳光反射到主塔,然后用聚集的热量产生蒸汽进而通过涡轮机转化为电力