上部结构的
- 与 上部结构的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
They feature a cappuccino / silver upper constructed from suede along with textured material on the side panels and toe box
他们具有卡布奇诺/银上部结构绒面质料与质感的侧面板和脚趾盒
-
Three of the four levels of the composite deckhouse were in assembly and workers had begun fabrication of the exterior decks and side shelves of the hangar unit.
复合材料舱面船室的四层上部结构有三层已在组装,工作人员已开始建造外部甲板及飞机库侧架。
-
The construction of a reinforced concrete deck box arch bridge was carried out by segment precasting, cable crane installation and cantilever erection by the aid of stayed cables with the cables fixed by the anchors embedded in rocks.
采用ALGOR大型有限元计算软件建模计算,设计2×653m双跨70t 缆索吊机,缆索吊机按单组主索可横移式设计,经试吊各主要参数与计算基本相符,满足了主桥上部结构预制构件不同位置吊装的需要。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The design of the main tasks was based on the new norms on the catenary arch bridge upper box structure design.
本设计的主要任务是依据新规范对悬链线箱形拱桥上部结构进行设计计算。
-
1 INTRODUCTION The superstructure consists mainly of walls, door, windows and lintels.
问题补充:我的中文翻译: 3.1。简介上部结构主要包括墙、窗、门和过梁。
-
Superstructure design, first determine the type of bridge, structural design, the choice of beam layout and positioning, the bridge is used in assembly-prestressed concrete simple hollow plate girder bridge, followed has been set in accordance with the structural design and calculation with Tendons.
上部结构设计中,首先确定桥的类型,构造的设计,梁板布置的选择和定位,本桥采用的是装配式预应力混凝土简支空心板梁桥,其次根据已定的结构设计和计算配筋。
-
The main way of the method of beam grid is to simulate the top structure with a equivalent beam grid, and concentrates the scattered bending rigid and tension rigid in slab or box beam into the close equivalent beam grid, and the longitudinal rigid of the real structure is concentrated in longitudinal beam rigid, and the lateral rigid is concentrated in lateral beam rigid.
梁格法的主要思路是将上部结构用一个等效梁格来模拟,将分散在板式或箱梁每一区段内的弯曲刚度和抗扭刚度集中于最邻近的等效梁格内,实际结构的纵向刚度集中于纵向梁格构件内,而横向刚度则集中于横向梁格构件内。
-
However, a vast amount of research demonstrates that dynamic interaction has a great influence on the dynamic characteristics of superstructures, and interaction system seismic response may greatly change.
然而,大量的理论分析和研究表明,在地基土质较差的情况下,地基-基础-上部结构动力相互作用对结构物的动力特性具有十分重要的影响,其地震响应将发生显著的变化。
- 推荐网络例句
-
Plunder melds and run with this jewel!
掠夺melds和运行与此宝石!
-
My dream is to be a crazy growing tree and extend at the edge between the city and the forest.
此刻,也许正是在通往天国的路上,我体验着这白色的晕旋。
-
When you click Save, you save the file to the host′s hard disk or server, not to your own machine.
单击"保存"会将文件保存到主持人的硬盘或服务器上,而不是您自己的计算机上。