上部的
- 与 上部的 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
SK,Na and SCl,Na in the aerial parts were higher than those in the root of wheat but lower than or equal to those in the root of sugar beet. These results indicated that ion transport from root to aerial parts of wheat was much different from that of sugar beet.
小麦地上部各器官的SK, Na;SCl, Na都大于根;而甜菜叶的SK, Na大于根, SCl , Na在二者之中的差异不大,由于K+的再转移和分配,甜菜枯叶的Na/K大于叶。
-
Macrophanerophytes such as pine and cedar are more and occupie greater percentage to from bottom to top, which are affected by clime and geography and human avtivity. Because people pay more attention to Macrophanerophytes and less to shrub and herbge plants, ecology of the forest is unbalance and benefit is low.
在整个沉积物柱的孢粉组合中,松、杉等大型乔木始终占有很高的比例,而且越到上部比例越大,这除了受滇中地区气候地理因素的影响外,可能还有人为的原因,人们在保护森林资源和植树造林过程中往往只是注重了大型的乔木而忽视了灌木和草本植物,从而使森林生态失衡,生态效益低下。
-
The waterfall grille has a subdued, black chrome appearance, while a chrome accent strip divides the upper portion of the front fascia from the lower section, adding solidity to the vehicle's appearance.
瀑布格栅有制服,黑色镀铬的外观,而铬口音地带划分从下游的前仪表板的上部,增加坚固的车辆的外观。
-
ZSM two-drum pulse low net work of the screen, pulp pressure from the top of the screen to cut into the screen, the two fall in the middle drum sieve, sieve in the drum inside and outside of the pressure difference and the dual-rotor rotary-wing together, qualified fiber Through the inside and outside the drum screen after screen to the body at the bottom of the pool, and then by the good plasma discharge tube machine, the screen remained in the dark between the flow of rough slurry residue by the rotor and driven together to drum sieve under the tailings from the slot after the Slag discharge pipe.
ZSM双鼓式低脉冲网前筛工作时,纸浆从压力筛的上部切向进入筛体,流到两个筛鼓中间,在筛鼓内外的压力差及双旋翼转子的共同作用下,合格纤维通过内、外筛鼓后汇集到筛体底部,然后经良浆管排出机外,留在筛鼓之间的粗渣受到浆流和旋翼的推动,汇聚到筛鼓下的尾渣槽后从排渣管排出。
-
The entire Superstructure cross-section, except for traffic barrier, shall be considered to be placed at one time for purposes of determining support requirements and designing falsework girders for their stresses and deflections, except as follows: For concrete box girder bridges, the girder stems, diaphrams, crossbeams, and connected bottom slabs, if the stem wall is placed more than 5 days prior to the top slab, may be considered to be self supporting between falsework bents at the time the top slab is placed, provided that the distance between falsework bents does not exceed 4 times the depth of the portion of the girder placed in the preceding concrete placements.
整个上部结构截面除交通障碍,应被视为在一个确定的要求和支持他们的设计应力和挠度除,脚手架时间放在梁的目的如下:对于混凝土箱形梁桥,主梁茎,diaphrams,横梁,和连接底板,如果干墙放置超过5天前向顶板,可能被认为是自我支持之间的脚手架本茨当时顶端板放置,只要脚手架茨之间的距离不超过4倍,在前面的混凝土主梁部分存款放在深度。
-
The results show that the mud flats is obviously wave characteristics in plane, the erosion variation from low tidal flats to the top of the slope under water is great in cross section, the relative stable tide currents and wave strength keep the mud flats stableness in dynamic, and the key of the flat er...
本区岸滩纵向上由东向西存在着明显的波状变化特征,在横向冲淤变幅上以低潮滩至水下斜坡上部最为明显;相对稳定的沿岸潮流和波浪作用强度是岸滩稳定的动力保证,沿岸泥沙供应量的变化则是局部岸滩冲淤变化的关键所在。
-
The research results found that due to the energy characteristic of the hybrid welding, the lap welding joint of magnesium alloy appeared "pin shapes " and the microstructure characteristics can be divided into two parts: The top of bead was the zone acted by laser and TIG together, while the bottom of bead was acted by laser alone.
研究发现:复合热源搭接的能量特点导致接头宏观呈&图钉&形状,复合热源搭接焊的热循环特点导致了接头微观组织的特殊性:接头上部呈现激光焊与TIG焊共同作用下的组织特征;接头下部呈现明显的激光焊组织特征。
-
With rapid development of express way and city traffic and the type for city bridges, interchanges and viaducts such as continuous curved girder bridges are widely used. To get beautiful linetype, the top structure of bridge is required to apply cast-in-place technology. Therefore scaffold construction technology for beams are greatly applied.
随着桥梁结构型式的发展,以及近年来高速公路及城市交通的迅猛发展,变宽桥、弯桥等复杂的预应力混凝土结构得到了广泛的应用,因线型限制,桥梁上部结构一般采用现浇,这样有支架现浇技术得到了广泛的应用,同时应用中的技术、安全问题也日益突现出来。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。