上部
- 与 上部 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Xiaozhongdian Basin is a NNW-directed fault depression basin which was shaped while the Qinghai-Tibet Plateau intensely upheaved since the end of the Pliocene epoch, where the lacustrine clay of the middle and late Pleistocene is well distributed from the Xiaozhongdian River section.
滇西北小中甸盆地是上新世末期以来在青藏高原强烈隆起过程中形成的NNW向第四纪断陷湖盆地,从深切的小中甸河谷剖面可见盆地上部发育中晚更新世湖相粘土。
-
According to the vagaries of the fluids' pathways.
不433。规则地将上部地幔的某些部分予以改变。
-
The show feature d flying acrobats and a giant 16- tonne globe rising from the ground - although not a single panda - in what might best be described as a breathtaking and brilliantly choreographed irrelevance which came to a jaw-dropping climax when Li Ning was winched high above the crowd to run around the vertical upper wall of the stadium before lighting the flame.
这场秀的特色是飞舞的杂技演员和从体育场升起的16吨重的地球仪--尽管不是一只熊猫--可以被描述成令人屏息的光辉灿烂的舞蹈节目的开幕式,在李宁点燃主火炬前被高高吊到人群之上,并沿着体育场上部垂直的围墙奔跑时达到了令人掉下巴的高潮。
-
At each wheel, upper and lower A-shaped wishbone links carry suspension loads directly to the subframes.
在每个车轮,上部和下部A形叉骨悬挂载荷进行联系,直接向副车架。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.
内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。
-
Strode said the work is focused on modifications to the upper and lower decks, and relocation of several systems in the forward section of the aircraft.
史卓德表示:「改装工程主要包括机身上部与下部机舱的改造,以及飞机前舱几个系统的重新配置。
-
During operation, an intranasal and marginal combining incision was made to expl ore the alar cartilages and to from a mucosal-cartilage flap in the nasal vest ibule. After the deformity of septal cartilage and the abnormalities of the alar base on the cleft side were repaired, the total alar cartilage was repositioned and rotated with suspension and V-Y advancement to correct the nasal deformiti es. Results Since 1993, a total of 92 cases were treated by the above p rocedure and satisfactory results were obtained.
手术经鼻端和患侧前庭联合切口,解剖、显露双侧鼻翼软骨,同时形成患侧前庭粘膜软骨瓣;在纠正鼻中隔软骨偏曲,松解患侧鼻肌复合体起点,使鼻翼脚无张力抬高后,再通过悬吊技术和粘膜软骨瓣的V-Y推进,将患侧鼻翼软骨进行整体旋转复位;最后,应用口轮匝肌上部纤维内收抬高鼻翼脚,用鼻肌复合体起点复位调整鼻孔形态,完成鼻畸形的矫正。
-
Manufacturers of the early 1900s were using steel pipe, angle or channel for the greenhouse superstructure s
二十世纪初期制造商们就已用钢管、角铁以及槽钢之类的材料建造温室的上部结构。
-
Manufacturers of the early 1900s were using steel pipe, angle or channel for the greenhouse superstructures.
二十世纪初期制造商们就已用钢管、角铁以及槽钢之类的材料建造温室的上部结构。
- 推荐网络例句
-
I am accused of being overreligious," she said in her quiet, frank manner,"but that does not prevent me thinking the children very cruel who obstinately commit such suicide.""
客人们在卡罗利娜·埃凯家里,举止就文雅一些,因为卡罗利娜的母亲治家很严厉。
-
Designed by French fashion house Herm è s, this elegant uniform was manufactured in our home, Hong Kong, and was the first without a hat.
由著名品牌 Herm è s 设计,这件高贵的制服是香港本土制造,是我们第一套不配帽子的制服。
-
Do not 'inflate' your achievements and/or qualifications or skills .
不要 '夸大' 你的业绩或成果,条件或者技能。