查询词典 work station
- 与 work station 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
First according to the hydraulic pressure elevator system diagram, use the machine design and hydraulic transmission knowledge calculates the diameter of the plunger, cylinder tube wall thickness as well as cylinder bottom thickness; second, through the examination confirmation to the obtained result to complete the work of cylinder design; Simultaneously has carried on the component choice and the computation; Through to the system calorific capacity computation the and the volume of cooling water while the fuel tank cools when needs to complete the hydraulic pressure elevator fuel tank design; Based on the system oil stream condition to calculated the tube internal pressure lose, the local pressure loss as well as the all of the pressure lose to carried on the system checking calculation; Finally through the consult correlation design handbook to calculation and examines the belt, the band pulley, the axis, as well as the key, has completed the hydraulic pressure elevator pumping station transmission system design.
首先根据液压电梯系统原理图,利用机械设计与液压传动等方面的知识计算出柱塞的直径、缸筒的壁厚以及缸底厚度,并对所得结果进行校核验证完成了工作油缸的设计;同时进行了元件的选择和计算;其次,通过系统发热量的计算和油箱冷却时需要的冷却水量的计算完成了液压电梯油箱的设计;依据系统油流状态计算出管内压力损失、局部压力损失以及总压力损失进行了系统的验算;最后通过查阅相关设计手册对带、带轮、轴、以及键进行设计计算和校核,完成了液压电梯的泵站传动系统的设计。
-
Firstaccording to the hydraulic pressure elevator system diagram, usethe machine design and hydraulic transmission knowledge calculatesthe diameter of the plunger, cylinder tube wall thickness as wellas cylinder bottom thickness; second, through the examinationconfirmation to the obtained result to complete the work ofcylinder design; Simultaneously has carried on the component choiceand the computation; Through to the system calorific capacitycomputation the and the volume of cooling water while the fuel tankcools when needs to complete the hydraulic pressure elevator fueltank design; Based on the system oil stream condition to calculatedthe tube internal pressure lose, the local pressure loss as well asthe all ofthe pressure lose to carried on the system checking calculation;Finally through the consult correlation design handbook tocalculation and examines the belt, the band pulley, the axis, aswell as the key, has completed the hydraulic pressure elevatorpumping station transmission system design.
首先根据液压电梯系统原理图,利用机械设计与液压传动等方面的知识计算出柱塞的直径、缸筒的壁厚以及缸底厚度,并对所得结果进行校核验证完成了工作油缸的设计;同时进行了元件的选择和计算;其次,通过系统发热量的计算和油箱冷却时需要的冷却水量的计算完成了液压电梯油箱的设计;依据系统油流状态计算出管内压力损失、局部压力损失以及总压力损失进行了系统的验算;最后通过查阅相关设计手册对带、带轮、轴、以及键进行设计计算和校核,完成了液压电梯的泵站传动系统的设计。
-
Frontier Inspection Station of Wuhan Mrs Blessed aviation, political commissar of the Hong Kong sent a letter to express appreciation, and will continue to express support for the work of Hong Kong Dragon Airlines, deepen border improve service levels, to enhance cooperation and jointly promote aviation operations, for inbound and outbound passengers with more high-quality service.
武汉边检站杜有福政委对港航空的致函表示感谢,并表示会一如既往的支持港龙航空的工作,深化提高边检服务水平工作,加强协作,共同促进航空运营,为出入境旅客提供更加优质的服务。
-
This thesis detailed discuss the complete set of technology according to different aspect of station~ site condition, breeding seedlings ,forest ~managemen1, cultural work,- density rule, cultivating pattern.
本文从产区、立地、育苗、营造、抚育、密度规律、栽培模式等一整套技术进行了详细的论述。
-
For the first display station operator, the work session begins when the job has been started.
对第一个显示站的操作员,当作业启动时,该工作会话便开始进行。
-
Drainage pump station on the road by 10 clear winners for automated refuse equipment modification, improved work efficiency.
对经十路排水泵站进行了自动化清捞圾设备改造,提升了工作效能。
-
Rice city is a big dye vat, impatient person does not suit, capital does not suit more, also do not enter without actual strength, if pursue only,oneself like, want to clean out rice makes a station or send a person, the personage that does not have work force heart can be entered appropriately.
米市是个大染缸,急躁的人不适合入,资金不多不适合入,无实力也别进,如果只图自己喜欢,想淘个米做站或送人,无功力心的人士可适当进入。
-
Since establishment for 10 years, the company has actively participates in the cooperative projects with the CNOOC, Sinopec, Bao Steel, Shanghai Boiler Work and Shanghai Real Estate, and successively supplied the steel to the principal projects of Nation such as Shanghai Aerotrain Station and ZheJiang Taizhou gymnasium.
公司创建十年来,先后参与了国家诸多重点建设项目,与海洋平台、中石化、宝钢、上海锅炉厂、上海实业集团等建立了多个合作项目,并成为上海磁悬浮列车、浙江台州体育馆等国家重点工程项目的钢材供应商。
-
Since establishment for 10 years, the company has actively participates in the cooperative projects with the CNOOC, Sinopec, Bao Steel, Shanghai Boiler Work and Shanghai Real Estate, and successively supplied the steel to the principal projects of Nation such as Shanghai Aerotrain Station and ZheJiang Taizhou gymnasium.
公司创建十年来,先后参与了国家诸多重点建设项目,与海洋平台、中石化、宝钢、上海锅炉厂、上海实业集团等建立了多个合作项目,并成为上海磁悬浮列车、浙江台州体育馆等国家重点工程项目的钢材供应商。2005年全公司贸易总量达到80多万吨,销售额超过30亿元,客户高达3500余家。
-
Since establishment for 10 years, the company has actively participates in the cooperative projects with the CNOOC, Sinopec, Bao Steel, Shanghai Boiler Work and Shanghai Real Estate, and successively supplied the steel to the principal projects of Nation such as Shanghai Aerotrain Station and ZheJiang Taizhou gymnasium.
创建十年来,先后参与了国家诸多重点建设项目,与海洋平台、中石化、宝钢、上海锅炉厂、上海实业集团等建立了多个合作项目,并成为上海磁悬浮列车、浙江台州体育馆等国家重点工程项目的钢材供应商。2005年全贸易总量达到80多万吨,销售额超过30亿元,客户高达3500余家。
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。