英语人>网络例句>wind-bell 相关的网络例句
wind-bell相关的网络例句

查询词典 wind-bell

与 wind-bell 相关的网络例句 [注:此内容来源于网络,仅供参考]

While "Aerie of the Northern Wind" is face-up on your field, once per turn, return 1 set card on the field to its owner's hand.

当"Aerie of the Northern Wind"在你场上存在时,1回合1次,将场上1张SET卡返回持有者手卡

While this monster and "Aerie of the Northern Wind" remain face-up on the field, your opponent cannot select another Winged Beast-Type monster on your side of the field as an attack target.

当此卡与"Aerie of the Northern Wind"在场上存在时,对方不能选择你场上的其他鸟兽族卡兽作为攻击对象

While "Aerie of the Northern Wind" is face-up on the field, if a Winged Beast-Type monster on your side of the field is destroyed, you can Special Summon this card from your hand. When this card is Special Summoned this way, increase the ATK and DEF of all other Winged Beast-Type monsters on your side of the field by 500 points.

当"Aerie of the Northern Wind"在场上存在,如果你场上的1鸟兽族卡兽被破坏,你可以从手卡特殊召唤此卡,当此卡用此方法特殊召唤时,你场上每1鸟兽族卡兽此卡攻击力跟守备力上升500。

Britain is an island nation, the maritime industry and fisheries in the economic life in the UK plays an important role, thus, producing a large number of navigation and fishing-related with the idiom; for example, spend money like water analogy to spend money to waste, extravagance, hang in the wind in the wind in the wavering and hesitant to do things analogy, burn one's boats metaphor,"most drastic retreat from the off"; all at sea that "loss" means; like a fish out of water metaphors,"in a strange uncomfortable environment,"and so on.

高手帮忙翻译下,本人感激不尽!!!!英国是个岛国,航海业和渔业在英国经济生活中占有重要的地位,由此,产生了大量的与航海和捕鱼有关的习语;例如, spend money like water比喻花钱浪费,大手大脚,hang in the wind在风中摇摆不定,比喻做事犹豫不决, burn one's boats比喻"破釜沉舟,自断退路";all at sea表示"不知所措"的意思;like a fish out of water比喻"处在陌生的环境中不自在"等等。

Soil erosion by wind, as a natural disaster haunts on dry lands, not only degrades soil productivity but also often results in dust blizzard weather. It may cause pollutions of air and water, damages of highway and railway, wear and tear of buildings and machinery and harmfulness in health of people and animals. Therefore, to combat wind erosion means improving the environment for people to live and work, means heightening the living standard of the local people, and means promoting productive forces. But China has a vast land where probably occur wind erosion disasters, the arid, semiarid and subhumid areas of the temperate zone all are potentially hit by wind erosion. To control wind erosion in China is a very arduous task. More difficult is to achieve recognizable effectiveness with lowest cost.

中文题名宁夏土壤风蚀研究副题名外文题名 Estimation of wind erosion in Ningxia 论文作者李玉宝导师王礼先孙保平教授学科专业水土保持与荒漠化防治研究领域\研究方向荒漠化防治学位级别博士学位授予单位北京林业大学学位授予日期2001 论文页码总数100页关键词风蚀土壤风蚀土壤侵蚀馆藏号BSLW /2003 /S157 /14 中国发生土壤风蚀的潜在区域包括温带干旱、亚干旱和亚湿润气候下的广大地区,如何有效地预防和治理土壤风蚀,如何以最小的代价达到满意的防治效果,这是很值得研究的问题。

Wind wound wound)*wind one's way 蜿蜒而行 The path winds through the woods.

注意与名词wind的读音不同。

The wind fields andtemperature fields data provided by "D files" from 14 surface observationstations around Beijing area are used to produce the mean wind fields and the meantemperature fields over Beijing area in summer and winter. Such results are gotten:(1)Due to the unique topography the wind of Beijing area during the day time is southernanabatic wind and in the night is northern katabatic wind in summer.

Keywords:wind field; temperature field; urban heat island; urban boundarylayer; Beijing area 北京区域夏冬季风场、温度场的观测研究胡小明刘树华梁福明王建华刘和平王迎春李炬摘要:用北京及市郊地区共14个地面气象观测站的全月数据顺序文件&D文件&提供的风场及温度资料,采用逐时月均匀的方法对北京及周边地区的冬夏两季的风场,温度场特征进行了研究。

This is put into operation the first generation of commercial proliferation of enhanced wind turbine (DAWT: diffuser augmented wind turbine), if the developers to achieve the expected results, will lead to significant reduction in the cost of wind power.

这是投入运行的第一代商用扩散体增强型风力机(DAWT: diffuser augmented wind turbine),如果开发者的预期结果得以实现,将导致风力发电成本大幅度降低。

With the capacity of the design and development, manufacture, installation and debugging of large-scale network combination wind motor sets above mega-watt, with certain business operation experiences, we hope to invest and construct Wind powers projects in China and are willing to cooperate with Zhenghai Group in Yantai, Shandong to develop together the Wind powers market of China.

风力发电项目要求: The requirement of Wind Turbine:一、对合作伙伴的要求 Requirements to Partners 具备兆瓦级以上大型并网风力发电机组的设计开发、生产制造、安装调试能力,具备一定的行业经营经验,希望到中国投资建设风机项目,愿意到山东烟台与正海集团进行合作,共同开发中国的风机市场。

During the validity period, all installed wind turbines of this type shall be reported to GL Wind.

在有效期内,安装的该类型的所有风机都应报告给GL Wind。

第1/100页 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Blowing Kisses In The Wind
When That Wild Wind Blows
Chase The Wind
The Weight Of The Wind
Strong Strong Wind
Blow Wind Blow
Roll With The Wind
It's Hard To Get Around The Wind
Wind Is Calling (Hush The Wind)
The Wind, The Wind
推荐网络例句

Do you know, i need you to come back

你知道吗,我需要你回来

Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.

1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。

Chapter Three: Type classification of DE structure in Sino-Tibetan languages.

第三章汉藏语&的&字结构的类型划分。